Second Notice | | 10/25/2012 | 10/25/2012 | | DONE |
|
|
|
|
First Notice | | 9/30/2012 | 10/15/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Jim Sly
|
|
|
late as possible//Ed Cuttlers Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 8/30/2012 | 8/31/2012 | 8/31/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. Contractor to post max. occupant load signage per plan as discussed. PFE's posted where indicated.
|
MISC ACTIONS | | | 8/24/2012 | | DONE |
Tisha Gallop
|
|
|
Name of project has changed from "Traditions at Boise" to "Affinity at Boise". See e-mail from Alan Springer attached in documents. The owner is still Traditions at Boise LLC.
|
Zoning Approval | 7/13/2012 | 7/13/2012 | 7/13/2012 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Conference | 5/21/2012 | 5/21/2012 | 5/21/2012 | P | DONE |
Troy Cobbley
|
|
|
Rod and I went over life safety requirements. I went over the three options for fire dept access designation. The fire hydrant in the northwest corner of the property needs the 5" outlet turned to where it is accessible to the fire dept. It appears that exit sign/emergency lights, if placed per plans, will be adequate.
|
BLD-Framing/Rough-in | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | PASS |
Jim Sly
|
|
|
Rob Fraser ###-#### 4th floor corridor Tower 3
|
BLD-Framing/Rough-in | 3/1/2012 | 3/2/2012 | 3/2/2012 | A | PASS |
Jim Sly
|
|
|
Nailing inspection for Pool House exterior walls. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
|
BLD-Foundation | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | PART |
Jim Sly
|
|
|
ROB Phone #: ###-#### Wall for Poolhouse......OK pending MTI inspections, tests and approvals.
|
Issue PAID IN FULL permit | | | 9/9/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/24/2011 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 8/24/2011 | | DONE |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 8/1/2011 | 8/4/2011 | 8/22/2011 | | PASS |
Cindy M. Gould
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2011 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 6/10/2011 | | 8/22/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 8/11/2011 | | 8/20/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing Off Site - STRUCTURAL | 8/16/2011 | | 8/16/2011 | | PASS |
Dan Stuart
|
|
|
See BLD11-01267 for final approval letter.
|
Routing - PLANNING Land Div | 8/12/2011 | | 8/15/2011 | | PASS |
Todd Tucker
|
|
|
|
Routing - Design Review | 8/8/2011 | | 8/11/2011 | | PASS |
Josh Wilson
|
|
|
Ok per DRH10-00222 and DRH11-00173
|
Routing - PLUMBING | 8/5/2011 | | 8/8/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
1st review completed | | | 8/5/2011 | | FAIL |
|
|
|
Failed Public Works, Structural, Planning
|
Routing - PLAN CHECK | 8/5/2011 | | 8/5/2011 | | PEND |
Dan Stuart
|
|
|
Plans routed back to plumbing for review of resubmittals
|
Routing - FIRE | 7/30/2011 | | 8/5/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 7/18/2011 | | 7/30/2011 | | PEND |
Dan Stuart
|
|
|
Routing to fire code analyst for review.
|
Plan resubmittals received | | | 7/25/2011 | | DONE |
Tisha Gallop
|
|
|
received response to plumbing plan review and two copies of plan sheets C1,C2, C3, C4, C5, C6, C7, C8 C9, P0.1, P1.0, P2.6, P2.7, P2.8, P2.0.1, P2.0.2, P2.0.3, P2.1.3; taken to Dan Stuart
|
Routing - MECHANICAL | 7/18/2011 | | 7/19/2011 | | PASS |
Troy James
|
|
|
Mechanical review not required on 4 story building per Bill Van DeGrift- 7-19-11//BAS
|
Plan resubmittals received | | | 7/18/2011 | | |
|
|
|
Received 2 copies of sheets M2.6 & M2.7 and inserted into plans
|
Routing - PUBLIC WORKS | 7/13/2011 | | 7/18/2011 | | PASS |
Beverly Mountain
|
|
|
Brian Murphy re-review.
|
Routing PW Drainage | 7/15/2011 | | 7/15/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 6/22/2011 | | 7/13/2011 | | PEND |
Dan Stuart
|
|
|
Route to PW Brian Murphy re-review
|
Plan resubmittals requested | | | 7/1/2011 | | DONE |
|
|
|
Structural Review Report to Mark Sanders for resubmittals
|
Routing Off Site - STRUCTURAL | 6/13/2011 | | 6/30/2011 | | FAIL |
Barbara Stitt
|
|
|
Called Action Courier for pick up
6-30-11 - Report from Structural Review. Project failed. Copy of report to Mark Sanders.
|
Routing - PLANNING | 6/20/2011 | | 6/22/2011 | | FAIL |
Josh Wilson
|
|
|
Plans are not consistent with DRH10-00222
|
Plan resubmittals received | | | 6/21/2011 | | |
Barbara Stitt
|
|
|
Received 1 cover transmital and 5 copies of civil plans inserted into plans//BAS
|
Routing - PLUMBING | 6/15/2011 | | 6/20/2011 | | FAIL |
Bill VanDegrift
|
|
|
Refer to bld11-01267
|
Routing - PLANNING | | | 6/20/2011 | | PASS |
Cody Riddle
|
|
|
CUP10-00052-Cody Riddle
|
Routing - PLANNING Land Div | 6/14/2011 | | 6/15/2011 | | FAIL |
Todd Tucker
|
|
|
Do not issue Building Permit until the Property Line Adjustment Record of Survey (ROS11-00018) has been recorded and the existing irrigation and utility easement has been vacated.
|
Routing - Erosion and Sediment | 6/15/2011 | | 6/15/2011 | | PASS |
Steven Webb
|
|
|
ESC 11-00348 IS THE MASTER PLAN THAT ESC11-00349 IS UNDER
|
Routing PW Sewer Design | 6/15/2011 | | 6/15/2011 | | PASS |
Javier Guzman
|
|
|
Sewer Tap Permit Required
|
Routing - PUBLIC WORKS | 6/10/2011 | | 6/14/2011 | | FAIL |
Beverly Mountain
|
|
|
Failed by Brian Murphy ###-#### & Peter McCullough ###-####
|
Routing PW Sewer Rating | 6/14/2011 | | 6/14/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 6/14/2011 | | 6/14/2011 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Street Lights | 6/14/2011 | | 6/14/2011 | | PASS |
Mike D Hedge
|
|
|
|
Routing - Addressing | 6/10/2011 | | 6/13/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Drainage | 6/13/2011 | | 6/13/2011 | | FAIL |
Brian Murphy
|
|
|
NEEDS REVISION
|
Pending Assignment by JCM | 6/10/2011 | | 6/10/2011 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/10/2011 | | PASS |
Dan Stuart
|
|
|
|
Application received | | 6/8/2011 | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/8/2011 | | FAIL |
Dan Stuart
|
|
|
|