Permit Information
Permit NumberBLD11-01274
StatusFinaled
Name INLAND IDAHO LLC
Site Address 13626 W BALDCYPRESS ST
Project NameAFFINITY--GARAGE #3
Customer Number 
ePlanReviewNo
Description
AFFINITY AT BOISE-Garage #3- To construct a 1,914 sq. ft., one story, 7 individually enclosed parking bays, one of the bays for accessibility compliance, within the parking garage. The plans indicate the south wall, roof/ceiling assembly and north support wall and the east end wall are of one hour fire-resistive construction. The east end wall rating is due to proximity to assumed property line between buildings. The west wall of the building is non-fire rated. Work includes concrete footing and foundation, wood frame construction walls, wood truss roof with plywood sheathing, asphalt shingles classified as Class ‘B’ or better and vinyl siding over building wrap on OSB sheathing on stud walls. All per reviewed plans, red-lined notes on plans and all attached plan review conditions of all plan reviewing agencies. drs DRH10-00222 / CUP10-00052
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 10/1/201210/15/2012 DONE
First Notice 9/3/20129/21/2012 DONE
MISC ACTIONS  8/24/2012 DONE
DetailsTisha Gallop
Name of project has changed from "Traditions at Boise" to "Affinity at Boise". See e-mail from Alan Springer attached in documents. The owner is still Traditions at Boise LLC.
Permanent Occupancy  8/24/2012 DONE
DetailsTisha Gallop
BLD-Final8/22/20128/23/20128/23/2012APASS
DetailsJim Sly
Ed Cuttlers Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection8/21/20128/21/20128/21/2012PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final7/26/20127/27/20127/27/2012APASS
DetailsJim Sly
Garage Final Phone #: ###-#### >> Inspection requested via web by Rob Fraser
OK for Perm Occ.
Zoning Approval7/13/20127/13/20127/13/2012 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in2/2/20122/3/20122/3/2012APASS
DetailsJim Sly
Garage #3 framing rough-in, nailing and cover inspection. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Other1/25/20121/26/20121/26/2012APASS
DetailsJim Sly
Garage #3 roof nailing for dry-in. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
BLD-Conference11/23/201111/23/201111/23/2011PPART
DetailsJim Sly
Foundation rebar. Phone #: ###-#### >> Inspection requested via web by Rob Fraser
OK pend. MTI......
Issue PAID IN FULL permit  9/9/2011 DONE
DetailsChristina Prado
Permit Ready to Issue  8/24/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  8/23/2011 DONE
DetailsChristina Prado
Print Occupancy Form  8/23/2011 DONE
DetailsChristina Prado
Print Occupancy Form  8/23/2011 DONE
DetailsChristina Prado
Route to Impact Fee Review8/1/20118/4/20118/22/2011 PASS
DetailsCindy M. Gould
Residential parking no impact fees
Plan assigned to (DRS)6/10/2011 8/22/2011 PASS
DetailsDan Stuart
PLANS/APPL TAKEN TO FRONT DESK  8/22/2011 DONE
Routing - PLAN CHECK8/11/2011 8/20/2011 PASS
DetailsDan Stuart
Routing Off Site - STRUCTURAL8/16/2011 8/16/2011 PASS
DetailsDan Stuart
See BLD11-01267 for final strcutural review approval letter.
Routing - PLANNING Land Div8/12/2011 8/15/2011 PASS
DetailsTodd Tucker
Routing - Design Review8/8/2011 8/11/2011 PASS
DetailsJosh Wilson
Ok per DRH10-00222 and DRH11-00173
Routing - FIRE8/1/20118/1/20118/5/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  8/5/2011 FAIL
Failed Public Works, Structural, Planning
Routing - PLAN CHECK8/5/2011 8/5/2011 PEND
DetailsDan Stuart
Plans to plumbing for review.
Routing - PLUMBING8/5/2011 8/5/2011 PASS
DetailsAngela Brosious
Routing - PLAN CHECK7/25/2011 8/1/2011 PASS
DetailsDan Stuart
Plan resubmittals received  7/25/2011 DONE
DetailsTisha Gallop
received response to plumbing plan review and two copies of plan sheets C1,C2, C3, C4, C5, C6, C7, C8 C9, P0.1, P1.0, P2.6, P2.7, P2.8, P2.0.1, P2.0.2, P2.0.3, P2.1.3; taken to Dan Stuart
Routing - MECHANICAL7/18/2011 7/19/2011 PASS
DetailsTroy James
Mechanical review not required on 4 story building per Bill Van DeGrift- 7-19-11//BAS
Routing - PUBLIC WORKS7/13/2011 7/18/2011 PASS
DetailsBeverly Mountain
Brian Murphy re-review.
Routing PW Drainage7/15/2011 7/15/2011 PASS
DetailsBrian Murphy
Routing - PLAN CHECK6/22/2011 7/13/2011 PEND
DetailsDan Stuart
Route to PW Brian Murphy for re-review
Plan resubmittals requested  7/1/2011 DONE
Report to Mark Sanders
Routing Off Site - STRUCTURAL6/13/2011 6/30/2011 FAIL
DetailsBarbara Stitt
Called Action Courier for pick up
6-30-11 - Report from Structural Review. Project failed. Copy of report to Mark Sanders.
Routing - PLANNING6/20/2011 6/22/2011 FAIL
DetailsJosh Wilson
Plans are not consistent with DRH10-00222
Plan resubmittals received  6/21/2011  
DetailsBarbara Stitt
Received 1 cover transmital and 5 copies of civil plans inserted into plans//BAS
Routing - PLUMBING6/15/2011 6/20/2011 FAIL
DetailsBill VanDegrift
refer to bld11-01267
Routing - PLANNING  6/20/2011 PASS
DetailsCody Riddle
CUP10-00052-Cody Riddle
Routing - PLANNING Land Div6/14/2011 6/15/2011 FAIL
DetailsTodd Tucker
Do not issue Building Permit until the Property Line Adjustment Record of Survey (ROS11-00018) has been recorded and the existing irrigation and utility easement has been vacated.
Routing - Erosion and Sediment6/15/2011 6/15/2011 PASS
DetailsSteven Webb
ESC11-00348 plan approved with conditions attached to the permit.
Routing PW Sewer Design6/15/2011 6/15/2011 PASS
DetailsJavier Guzman
Sewer Tap Permit Required
Routing - PUBLIC WORKS6/10/2011 6/14/2011 FAIL
DetailsBeverly Mountain
Failed by Brian Murphy ###-#### & Peter McCullough ###-####
Routing PW Sewer Rating6/14/2011 6/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste6/14/2011 6/14/2011 PASS
DetailsPeter J. McCullough
Routing PW Street Lights6/14/2011 6/14/2011 PASS
DetailsMike D Hedge
Routing - Addressing6/10/2011 6/13/2011 PASS
DetailsTerry Records
Routing PW Drainage6/10/2011 6/13/2011 FAIL
DetailsBrian Murphy
needs revisions
Pending Assignment by JCM6/10/2011 6/10/2011 DONE
DetailsJohn Menard
Plans ACCEPTED BY PLAN TECH  6/10/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/10/2011 PASS
DetailsDan Stuart
Application received 6/8/20116/8/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  6/8/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/8/2011 FAIL
DetailsDan Stuart