First Notice | | 9/30/2012 | 5/14/2014 | | DONE |
|
|
|
This permit finaled on the web by Jamie Jannuzzi
|
BLD-Final | 9/19/2012 | 9/20/2012 | 9/20/2012 | A | PASS |
Jim Sly
|
|
|
>> Inspection requested via web by Jamie Liddell OK for Perm Occ.
|
Permanent Occupancy | | | 9/20/2012 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 8/31/2012 | 8/31/2012 | 8/31/2012 | P | PASS |
Forrest France
|
|
|
Scope of work completed. Life safety passed.
|
MISC ACTIONS | | | 8/24/2012 | | DONE |
Tisha Gallop
|
|
|
Name of project has changed from "Traditions at Boise" to "Affinity at Boise". See e-mail from Alan Springer attached in documents. The owner is still Traditions at Boise LLC.
|
BLD-Other | 11/18/2011 | 11/22/2011 | 11/22/2011 | A | PASS |
Jim Sly
|
|
|
paul - steel inspection Phone #: ###-#### Pool and Spa rebar...OK
|
Issue PAID IN FULL permit | | | 11/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 11/2/2011 | | |
|
|
|
|
Telephone call | | | 11/2/2011 | | DONE |
Tisha Gallop
|
|
|
called Jamie and left vm permit is ready and fees.
|
Permit Ready to Issue | | | 11/2/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (DRS) | 6/10/2011 | 6/10/2011 | 11/1/2011 | | PASS |
Dan Stuart
|
|
|
|
Routing - PLAN CHECK | 11/1/2011 | | 11/1/2011 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2011 | | PASS |
|
|
|
|
Print Occupancy Form | | | 11/1/2011 | | DONE |
|
|
|
|
Routing - PLUMBING | 10/29/2011 | | 10/31/2011 | | PASS |
Bill VanDegrift
|
|
|
May require an RPBP instead of PVB on pool fill valve supply.
Per plans and 2003 UPC.
|
Routing - PLAN CHECK | 10/26/2011 | | 10/29/2011 | | PASS |
Dan Stuart
|
|
|
Routing to plumbing for review and then to ESC.
|
Plan resubmittals received | | | 10/26/2011 | | |
|
|
|
received two copies of intake checklist, building permit applicaiton, esc application w/waiver letter, chemical list and info, Engineering calcs, pool cover info, engineering plan sheets 1 & 2, and plans sheets TI1.0, AQ1.0, AQ1.1, AQ1.2, AQ1.3, AQ1.4, AQ1.5, M1.0, P1.0, P1.1, E1.0;
|
Routing - PLAN CHECK | 8/11/2011 | | 8/20/2011 | | FAIL |
Dan Stuart
|
|
|
Plans & structural engineering design data has not been provided. These will be separate submittals once contractor is determined.Pool & Spa Design shop drawings are listed as a deferred submittal. No work can proceed on the pool or spa until required plans resubmittals are provided, reviewed, approved and a permit issued.
|
Routing - PLANNING Land Div | 8/12/2011 | | 8/15/2011 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLANNING | 8/8/2011 | | 8/11/2011 | | PASS |
Cody Riddle
|
|
|
CUP10-00052-Cody Riddle
|
Routing - PLANNING | 8/8/2011 | | 8/11/2011 | | PASS |
Josh Wilson
|
|
|
Ok per DRH10-00222 and DRH11-00173
|
Plan resubmittals requested | | | 8/3/2011 | | DONE |
|
|
|
Copy of plan review e-mailed to architect.
|
Routing - PLAN CHECK | 7/25/2011 | | 8/2/2011 | | FAIL |
Dan Stuart
|
|
|
Structural design data and components were not on pages indicated in application. Resubmittals required.
|
Routing - FIRE | 8/2/2011 | | 8/2/2011 | | PASS |
Scott Arellano
|
|
|
Reviewed need to have swimming pool plans route to fire code analyst. Scott said no.
|
Routing - MECHANICAL | 7/18/2011 | | 7/19/2011 | | PASS |
Troy James
|
|
|
Mechanical review not required on 4 story building per Bill Van DeGrift- 7-19-11//BAS
|
Plan resubmittals received | | | 6/21/2011 | | |
Barbara Stitt
|
|
|
Received 1 cover transmital and 5 copies of civil plans inserted into plans//BAS
|
Routing - Erosion and Sediment | | | 6/15/2011 | | PASS |
Steven Webb
|
|
|
Refer to ESC11-00348, the master plan.
ESC11-00348 plan approved with conditions attached to the permit.
|
Plans ACCEPTED BY PLAN TECH | | | 6/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/10/2011 | | PASS |
Dan Stuart
|
|
|
|
Pending Assignment by JCM | 6/10/2011 | | 6/10/2011 | | DONE |
John Menard
|
|
|
|
Application received | | 6/8/2011 | 6/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/8/2011 | | FAIL |
Dan Stuart
|
|
|
|