BLD-Final | 11/25/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 11/21/2011 | 11/23/2011 | 11/23/2011 | A | FAIL |
Mike Jordan
|
|
|
David Phone #: ###-####. Provide blower door test results and post, post energy cert, install ladder in window well, install smoke detector in basement. Steps from both back door exceeds the 7.75" max riser height requirement to top of threshold..
|
BLD-Energy code compliance | 9/21/2011 | 9/22/2011 | 9/22/2011 | A | PASS |
Jim Storey
|
|
|
early as possible//David Phone #: ###-####
|
BLD-Framing/Rough-in | 9/16/2011 | 9/16/2011 | 9/16/2011 | P | PART |
Jim Storey
|
|
|
david Phone #: ###-#### truss conector eng. at stairs/ fire blk duct chase/strap vent chases at top plate. ok to insulate.
|
Routing - MECHANICAL | 9/1/2011 | | 9/1/2011 | | PASS |
Troy James
|
|
|
approved resubmitted manual j
|
Plan resubmittals received | | | 8/31/2011 | | DONE |
Troy James
|
|
|
|
Routing - MECHANICAL | 8/31/2011 | | 8/31/2011 | | FAIL |
Troy James
|
|
|
notified teds heating design failed
|
BLD-Foundation | 7/26/2011 | 7/27/2011 | 7/27/2011 | P | PASS |
Jim Storey
|
|
|
SHAWN Phone #: ###-####
|
BLD-Footing | 7/26/2011 | 7/26/2011 | 7/26/2011 | P | PASS |
Jim Storey
|
|
|
SHAWN Phone #: ###-####
|
BLD-Foundation | 7/19/2011 | 7/20/2011 | 7/20/2011 | P | PASS |
Jim Storey
|
|
|
water portection Shawn Phone #: ###-#### ok for back fill.
|
BLD-Foundation | 7/18/2011 | 7/19/2011 | 7/19/2011 | P | PASS |
Jim Storey
|
|
|
Shawn Phone #: ###-#### basement walls ok
|
BLD-Footing | 7/13/2011 | 7/14/2011 | 7/14/2011 | A | PASS |
Jim Storey
|
|
|
david - around 11 if possible please Phone #: ###-####
|
OVERRIDE | | | 7/7/2011 | | |
|
|
|
|
Plan assigned to (CDM) | | 6/14/2011 | 7/7/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - Addressing | 6/14/2011 | | 7/7/2011 | | PASS |
Terry Records
|
|
|
|
Case Summary (BLD) | | | 7/7/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2011 | | DONE |
Christina Prado
|
|
|
Called David and left message advising fees due and RP is needed prior to issuance of permit
|
Permit Ready to Issue | | | 7/7/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/7/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 7/6/2011 | | |
|
|
|
Received 2 copies of sheet 12 and sheet 5 and taken to Carl Madsen's desk
|
Routing - PLAN CHECK | 7/6/2011 | | 7/6/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/6/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/5/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheets pg 2 (foundation), pg 7(first floor framing), and engineering; taken to Carl Madsen.
|
Routing - PLAN CHECK | 6/29/2011 | | 6/30/2011 | | FAIL |
Carl D Madsen
|
|
|
Additional information is required on the plans. Sent E-Mail to David at Dry Creek. 6-30-11 CDM
|
1st review completed | | | 6/30/2011 | | FAIL |
|
|
|
|
Routing - MECHANICAL | 6/29/2011 | | 6/29/2011 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/15/2011 | | 6/21/2011 | | FAIL |
Troy James
|
|
|
emailed corrections to teds heating
|
Route to Impact Fee Review | 6/13/2011 | 6/16/2011 | 6/16/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 6/15/2011 | | 6/15/2011 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - PUBLIC WORKS | | | 6/15/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 6/14/2011 | | PASS |
Christina Prado
|
|
|
|
Application received | | 6/13/2011 | 6/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/13/2011 | | DONE |
Tisha Gallop
|
|
|
|