Permit Information
Permit NumberBLD11-01344
StatusFinaled
Name HC COMPANY INC
Site Address 11311 W CHINDEN BLVD
Project NameHP BLDG 3
Customer Number 
ePlanReviewNo
Description
(HEWLETT PACKARD)(PHASE II CAFE' - SERVERY REMODEL) Remodel to the existing dining / preparation assembly use cafeteria per approved plans. Work to include select interior demolition. Modification of existing kitchen area to become a large servery area for patrons to pass through selecting food and beverage choices before going to the seating areas. Modifications to the existing 1-hour roof/ceiling assembly (ESR-1222)and 1-hour occupancy separation wall separating the original A2.1 assembly dining / kitchen area accessory use area per the UBC under which remodels & upgrades were done, from the adjacent two story 'B' occupancy office building. Building 1, 2, 3, 5, & 7 of the Hewlet Packard campus are part of an unlimited area building as a 'B' occupancy use with 60 feet all around and fully sprinklered. The A2.1 dining / kitchen area was required to be of type II-1 hour constrcution and an accessory use to building three. All modifications to roof/ceiling assembly, penetrations and openings are to be such that the 1-hour construction is maintained. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 12/1/201111/21/2011 DONE
DetailsTisha Gallop
received final cert of value. Verified with Jeff Tonkin (HC Comapany) value is correct, job cost did go up considerably on this project.
Permanent Occupancy  11/21/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  11/14/2011 DONE
BLD-Final10/31/201110/31/201110/31/2011PPASS
DetailsDave Hannah
FIRE-Final Inspection10/28/201110/31/201110/31/2011PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final10/31/201110/31/201110/31/2011ACANC
DetailsDave Hannah
BLD-Framing/Rough-in9/26/20119/27/20119/28/2011APASS
DetailsDave Hannah
east side ok to cover
FIRE-Sprinkler Rough-in8/19/20118/19/20118/19/2011PDONE
DetailsForrest France
Troy Phone #: ###-####
FIRE-Sprinkler Rough-in8/19/20118/19/20118/19/2011ANR
DetailsForrest France
Inspection for new heads at the sheetrock ceiling servery entry area- noted new partition and doors not yet installed may create overspacing at adjacent pendents. Project lacks fire sprinkler plans including shop drawings at this time.
FIRE-Sprinkler Rough-in8/17/20118/17/20118/17/2011PPART
DetailsForrest France
Six pendent heads at the coffee bar sheetrock ceiling inspected prior to cover.
Issue PAID IN FULL permit  8/8/2011 DONE
DetailsTisha Gallop
Inspection Record Card- Bld  8/4/2011 DONE
Telephone call  8/4/2011 DONE
left vm for dan - permit ready and fees given - also need rp name
Permit Ready to Issue  8/4/2011 DONE
Details
Plan resubmittals received  8/3/2011 DONE
DetailsTisha Gallop
Received 2 copies of Sheets M2.01 & M3.01. Took to Dan Stuart
Routing - MECHANICAL8/3/2011 8/3/2011 PASS
DetailsTroy James
Reviewed new plan sheets M2.01 & M3.01 with Troy to see if his mechanical plan review concerns had been addressed. They have. Plans routing to permit desk to issue.
Routing - PLAN CHECK8/3/2011 8/3/2011 PASS
DetailsDan Stuart
Received copies of Sheets M2.01 & M3.01 and hand carried to Troy james, Mech Plan Review for approval. Plans approved. Inserted into plans and routed one set to permit desk to be issued.
PLANS/APPL TAKEN TO FRONT DESK  8/3/2011 PASS
Plan assigned to (DRS)6/21/2011 8/3/2011 PASS
DetailsDan Stuart
Routing - FIRE7/27/2011 8/2/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  8/2/2011 FAIL
Failed Plan Check and Mechanical
Routing - PLAN CHECK8/2/2011 8/2/2011 FAIL
DetailsDan Stuart
Only received one copy of Sheets M2.01 & M3.01 and no response to mechanical Plan Reviewers comments. I called Jared at DC Engineering in Missoula Montana to request missing plans and data.
Plan resubmittals received  8/2/2011 DONE
DetailsTisha Gallop
received two copies of plan sheet M02.01; taken to Dan Stuart.
Telephone call  8/2/2011 DONE
Call DC Engineering in Missoula Montana and talked with Jared. Only one copy of plan resubmittal Sheets M2.01 & M3.01 were turned in. I need a second copy. The plan sheets submitted do not appear to have included corrections required by mechanical plan reviewer Troy James in review of 7/7/11. jared said he would check to make sure they had a copy of the corrections and work on plans required. If they do not have acopy of the mechanical review Jared will call me back for a copy.
Routing - PLAN CHECK7/12/2011 7/27/2011 PASS
DetailsDan Stuart
Data from architect provided for 1-hour roof / ceiling assembly using ESR-1222 report for Donn DXL listed assembly. Plans were red-lined to reflect code compliance requirements and a plan review report was attached to each plan and are considered a part of the reviewed plans for code compliance. Routed plans to fire code analyst for review.
Additional plans submitted  7/27/2011 DONE
7/25/11 - Received cover letter and 8-1/2" x 12" SKA-9 & SKA-10 for 1-hour roof / ceiling assembly proposed, ESR-1222. Scanned and attached to permit & plns.
Print Pending Permit.LaserJet4  7/27/2011  
Case Summary (BLD)  7/27/2011  
Routing - PLAN CHECK7/7/2011 7/12/2011 FAIL
DetailsDan Stuart
Plans submitted do not address maintaining the Type II-1 hour construction for the A2.1 occupancy under the UBC with a 1-hour occupancy separation between the A2.1 & the B occupancies. The other option under the 2009 IBC would be constrcution of a 2-hour fire barrier separation between the A2 & B occupancies as part of an unlimited area building per section 507 IBC.
Cannot proceed with plan review or route plans to fire department plan review until the method of code compliance is addressed with plan resubmittals.
I e-mailed a copy of the A2.1 permits & approved history of the HP construction reviewed and approved by Bob Garrison, head plan reviewer at time of HP complex build out.
Routing - MECHANICAL6/30/2011 7/7/2011 FAIL
DetailsTroy James
emailed corrections to applicant and agent
Routing - PLUMBING6/28/2011 6/30/2011 PASS
DetailsBill VanDegrift
1. Provide adequate backflow protection for expresso equipment.
2. Filtered water to ice machine needs separate RPBP.
3. Per plans and 2003 UPC.
Routing - Erosion and Sediment6/27/2011 6/28/2011 PASS
DetailsSteven Webb
ESC11-00405 plan waiver approved with conditions attached to the permit.
Routing PW Sewer Rating6/27/2011 6/27/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS6/21/2011 6/27/2011 PASS
DetailsBeverly Mountain
Routing PW Environmental6/24/2011 6/24/2011 PASS
DetailsWalt Baumgartner
Rvw'd by M Hunter, 1500 gallon GI noted on plans, ok
Routing - Addressing6/23/2011 6/23/2011 PASS
DetailsTerry Records
Pending Assignment by JCB6/20/2011 6/21/2011 DONE
DetailsJason Blais
Plan Reviewer's activity  6/21/2011 DONE
DetailsJason Blais
Called Dan Hayes of HC Company to have him provide an ESC Application and Waiver Letter.
Plan resubmittals received  6/21/2011 DONE
DetailsJason Blais
Received ESC application and Plan Waiver Letter.
Application received 6/15/20116/17/2011 DONE
DetailsDarla L Downs
Intake Approval  6/17/2011 PASS
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  6/17/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  6/17/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/15/2011 FAIL
Need the QF Sheets stamped and signed by design professional. Will also submit CV & App for demo permit at same time.