BLD-Final | 12/16/2011 | 12/16/2011 | 12/19/2011 | P | DONE |
Tony Young
|
|
|
zach - please call 1/2 hr prior Phone #: ###-####,, ok now,, 12/19/11
|
BLD-Final | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | PASS |
Tony Young
|
|
|
zach - please call 1/2 hr prior Phone #: ###-####
|
DOC - Permit Finaled | 12/19/2011 | 12/19/2011 | 12/19/2011 | P | PASS |
Tony Young
|
|
|
hillside ok per phone call,, computer system down in am
|
BLD-Grading Inspection | 12/19/2011 | | 12/19/2011 | A | DONE |
Terry Records
|
|
|
|
BLD-Final | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | NR |
Tony Young
|
|
|
zach - please call 1/2 hr prior Phone #: ###-####,,, needs hillside final
|
BLD-Final | 12/14/2011 | 12/15/2011 | 12/15/2011 | P | PART |
Tony Young
|
|
|
zach - please call 1/2 hr prior Phone #: ###-####,,, needs hillside final,,, conf only,,, walk through,, ok pending hillside
|
BLD-Energy code compliance | 9/29/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Tony Young
|
|
|
Zach Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 | P | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, correction posted,, ok to insulate
|
BLD-Framing/Rough-in | 9/26/2011 | 9/27/2011 | 9/27/2011 | A | NR |
Tony Young
|
|
|
Zack Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2011 | 9/26/2011 | 9/26/2011 | A | FAIL |
Tony Young
|
|
|
Zack Phone #: ###-####,, need trades 1st,,, no inspection
|
BLD-Other | 9/9/2011 | 9/12/2011 | 9/12/2011 | A | PART |
Tony Young
|
|
|
zach - shear inspection Phone #: ###-####,, ok to cover exterior after a couple fixes,, will still need to do a soffit inspection
|
BLD-Footing | 8/9/2011 | 8/9/2011 | 8/9/2011 | P | PART |
Tony Young
|
|
|
bill Phone #: ###-####,, work in progress,, ok to pour when ready
|
BLD-Footing | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | NR |
Tony Young
|
|
|
bill Phone #: ###-####
|
PubWorks Subgrade Approval | 8/9/2011 | 8/9/2011 | 8/9/2011 | | DONE |
Terry Records
|
|
|
|
BLD-Footing | 8/5/2011 | 8/8/2011 | 8/8/2011 | P | NR |
Tony Young
|
|
|
bill Phone #: ###-####
|
BLD-Footing | 8/4/2011 | 8/5/2011 | 8/5/2011 | P | CANC |
Tony Young
|
|
|
bill Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/25/2011 | | DONE |
|
|
|
|
Plan assigned to (CDM) | | 6/16/2011 | 7/20/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | | | 7/20/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | | | 7/20/2011 | | PASS |
|
|
|
Received sprinkler plans. The sprinkler plans were reviewed and passed.
|
Routing PW Grading-Hillside | 7/20/2011 | | 7/20/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLAN CHECK | 7/20/2011 | | 7/20/2011 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/20/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/20/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2011 | | DONE |
|
|
|
t/c w todd - permit ready and fees given - also need RP
|
Permit Ready to Issue | | | 7/20/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/19/2011 | | DONE |
Rita DeYoung
|
|
|
Received two sets of sheets S1.0 AND S2.0 with transmittal
|
Routing - PLANNING | 7/11/2011 | | 7/12/2011 | | PASS |
Joshua Johnson
|
|
|
|
1st review completed | | | 7/11/2011 | | FAIL |
|
|
|
The foundation plan is required to be stamped by the engineer called and talked to Scott at Zach Evans Construction. 7-11-11 CDM The plan also failed in Fire.
|
Plan resubmittals received | | | 7/8/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plans sheets L1.1 (grading), L1.5 (drainage details), L2.1 (ESC) put with plans and given to Carl Madsen.
|
Route to Impact Fee Review | 6/24/2011 | 6/29/2011 | 7/7/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Route to Impact Fee Review | 6/16/2011 | 6/21/2011 | 7/7/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - FIRE | | 6/24/2011 | 6/24/2011 | | FAIL |
Scott Arellano
|
|
|
The project does not comply with IFC:503.1. All portions of the home is not within 150'.
There are exceptions see IFC.
Provide a NFPA 13D sprinkler system.
Provide a fire department vehicle access road within 150' of all portions of the structure.
|
Routing - Erosion and Sediment | 6/23/2011 | | 6/24/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00387 plan approved with conditions attached to permit.
|
Plan Reviewer's activity | | | 6/24/2011 | | DONE |
|
|
|
Emailed Applicant that the plans failed the Fire Code Review. I listed the IFC section (503.1.1) for his reference.
|
Routing - MECHANICAL | 6/21/2011 | | 6/23/2011 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/20/2011 | | 6/21/2011 | | FAIL |
Joshua Johnson
|
|
|
Requires a hillside permit due to the length of the driveway.
|
Plan resubmittals received | | | 6/20/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of plans L1.1, L1.5, L2.1, S1.0 & S2.0. (All for Grading & Drainage) Placed with plans to be reviewed
|
Routing - PUBLIC WORKS | 6/17/2011 | | 6/20/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Grading-Hillside | | | 6/17/2011 | | FAIL |
Terry Records
|
|
|
No grading plans in building sets and driveway is over 100 feet long.
|
Routing - Addressing | 6/16/2011 | | 6/17/2011 | | PASS |
Terry Records
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/16/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/16/2011 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/16/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/15/2011 | | FAIL |
Tisha Gallop
|
|
|
|
Application received | | 6/15/2011 | | | |
|
|
|
|