Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD11-01358
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 517 W MCGREGOR DR
Project NameFederal Way Building #4
Customer Number 
ePlanReviewNo
Description
(G&K SERVICES – Federal Way Building #4) First time tenant build out of a 3,528 square foot office / warehouse tenant space. PLAN MODIFICATION: Plan mod submitted to change restroom access. Attached modification to documents. 8-3-11 TLW This building is fully sprinklered for nonseparated use and area increase. Work to include: [construction of non-combustible full height partition walls to create: two offices, a reception area, and a unisex accessible restroom, new lighting, new accessible doors / hardware, installation of new mechanical, new plumbing, and finishes in compliance with chapter 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 9/23/20119/22/2011 DONE
Print Occupancy Form  9/13/2011 DONE
DetailsBarbara Stitt
Permanent Occupancy  9/13/2011 DONE
DetailsBarbara Stitt
BLD-Final9/6/20119/7/20119/7/2011APASS
DetailsMike Jordan
Key is above door Phone #: ###-#### >> Inspection requested via web by Richard Schultz. ok for perm occ.
FIRE-Final Inspection9/6/20119/6/20119/6/2011PPASS
DetailsForrest France
Fire life safety inspection completed.
BLD-Framing/Rough-in8/25/20118/26/20118/26/2011PPART
DetailsJim Storey
jack - ceiling grid Phone #: ###-#### ok pending mech
BLD-Framing/Rough-in8/9/20118/10/20118/10/2011APASS
DetailsJim Storey
key above door Phone #: ###-#### >> Inspection requested via web by Richard Schultz
Plan Reviewer's activity  8/3/2011 DONE
DetailsTim L. Woodard
Approved modification to restroom access. Attached revised floor plan to this case and sent to records. TLW
BLD-Framing/Rough-in7/28/20117/29/20117/29/2011ANR
DetailsJim Storey
Key is above door. Phone #: ###-#### >> Inspection requested via web by Richard Schultz
Print Occupancy Form  7/27/2011 DONE
Permit Ready to Issue  7/27/2011 DONE
Telephone call  7/27/2011 DONE
7-27-11 called Cornel permit ready and fee given Also need GC ///dld
Issue PAID IN FULL permit  7/27/2011 DONE
DetailsChristina Prado
Plan assigned to (TLW)6/15/2011 7/26/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/18/2011 7/26/2011 PASS
DetailsTim L. Woodard
Approved with redlines and report. TLW
PLANS/APPL TAKEN TO FRONT DESK  7/26/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/26/2011 DONE
DetailsTim L. Woodard
Routing - FIRE7/15/2011 7/18/2011 PASS
DetailsScott Arellano
Attached revised IFC comments to plans
Routing - PLAN CHECK7/6/2011 7/15/2011 PASS
DetailsTim L. Woodard
Resubmittals approved with redlines and a report detailing the requirements. TLW
Plan resubmittals received  7/13/2011 DONE
DetailsTisha Gallop
received response and two copies of plan sheets A-1, A-2, A-4; taken to Tim Woodard.
Routing - FIRE7/6/2011 7/6/2011 FAIL
DetailsTim Frost
Please, see attached review.
Plan Reviewer's activity  7/6/2011 DONE
Emailed review to architect.
1st review completed  7/5/2011 FAIL
DetailsTim Frost
Failed - Plan Check, Fire
Routing - PLAN CHECK6/22/2011 7/5/2011 FAIL
DetailsTim L. Woodard
Restroom access and envelope requirements not met. Refer to plan review report. TLW
Routing - PUBLIC WORKS  6/22/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating6/21/2011 6/21/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing6/15/2011 6/20/2011 PASS
DetailsTerry Records
Recd Pcfee & Taken To Pln CK  6/15/2011 DONE
Plans ACCEPTED BY PLAN TECH  6/15/2011 DONE
ok per Tim W to take in as a level 2
Application received 6/15/2011