Third Notice | | 2/7/2012 | 2/13/2012 | | DONE |
|
|
|
This permit finaled on the web by Brandon Byington
|
Second Notice | | 1/27/2012 | 2/2/2012 | | DONE |
Christina Prado
|
|
|
faxed 2-2-12
|
First Notice | 1/4/2012 | 1/4/2012 | 1/17/2012 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 1/3/2012 | 1/4/2012 | 1/4/2012 | A | PASS |
Mike Jordan
|
|
|
Steve Phone #: ###-#### or ###-####
|
DOC - Permit Finaled | 1/4/2012 | 1/4/2012 | 1/4/2012 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 1/3/2012 | 1/3/2012 | 1/3/2012 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Per Tim and I's discussion the lack of a sensor at the main exit door to release the door magnet is ok due to other exit paths from the A3 occupancies on the second floor.
|
BLD-Other | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | PASS |
Mike Jordan
|
|
|
ceiling insp//Bob Wheeler Phone #: ###-####
|
BLD-Framing/Rough-in | 8/10/2011 | 8/11/2011 | 8/11/2011 | A | PASS |
Mike Jordan
|
|
|
bob Phone #: ###-####. Continuity for 1hr. corridors and lids ok.
|
BLD-Framing/Rough-in | 8/4/2011 | 8/4/2011 | 8/5/2011 | P | PASS |
Jim Storey
|
|
|
Nacho Phone #: ###-####
|
BLD-Framing/Rough-in | 7/28/2011 | 7/29/2011 | 7/29/2011 | A | PART |
Jim Storey
|
|
|
nacho Phone #: ###-#### north vestabule ok to cover
|
Issue PAID IN FULL permit | | | 7/11/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 6/20/2011 | | 7/7/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/7/2011 | | 7/7/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/7/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/7/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 7/7/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/7/2011 | | DONE |
Christina Prado
|
|
|
Called and left message for Tim Miller, gave fees due and advised GC is needed
|
Permit Ready to Issue | | | 7/7/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 7/5/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of structural calcs as well as two sets of plans G101, A001, A101, A601, A900, A901, E001 and E101. Routed to Tim Woodard for review
|
Routing - PLAN CHECK | 6/20/2011 | | 6/23/2011 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report for correction items. Tim Woodard
|
1st review completed | | | 6/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 6/17/2011 | 6/17/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/17/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/17/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/17/2011 | | PASS |
Tim L. Woodard
|
|
|
|