BLD-Aging Inspection | 4/1/2015 | 4/1/2015 | 4/7/2015 | | CANC |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 4/10/2014 | 4/10/2014 | 4/10/2014 | | NR |
Tom Arcoraci
|
|
|
pending fire
|
BLD-Aging Inspection | 11/29/2013 | 12/2/2013 | 12/5/2013 | A | NR |
Troy Cobbley
|
|
|
I went over the remaining items with the owner. Two of the three corrections have been completed. The remaining items is a resubmittal of the floor plan for approval.
|
BLD-Final | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | NR |
Tom Arcoraci
|
|
|
victoria Phone #: ###-####
|
FIRE-Final Inspection | 10/12/2011 | 10/12/2011 | 10/12/2011 | P | FAIL |
Troy Cobbley
|
|
|
The sticker needs to be provided at the main exit, deadbolt removed and singel action hardware at the rear exit and corrected floor plans submitted to plan review.
|
Print Occupancy Form | | | 10/12/2011 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/19/2011 | 7/20/2011 | 7/20/2011 | A | CANC |
Tom Arcoraci
|
|
|
Warren Phone #: ###-####
|
BLD-Final | 6/30/2011 | 7/1/2011 | 7/5/2011 | A | NR |
Tom Arcoraci
|
|
|
Kim Phone #: ###-####
|
FIRE-Final Inspection | 6/30/2011 | 6/30/2011 | 6/30/2011 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for corrections marked in red. They include a floor plan that does not match, no fire extinguisher and door hardware issues.
|
Issue PAID IN FULL permit | | | 6/30/2011 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 6/27/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/27/2011 | | DONE |
|
|
|
t/c w phyllis - permit ready
|
Permit Ready to Issue | | | 6/27/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 6/20/2011 | | 6/24/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/20/2011 | | 6/24/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/24/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/24/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/20/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/20/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/20/2011 | | | |
|
|
|
|