Second Notice | | 7/16/2012 | 7/12/2012 | | DONE |
|
|
|
|
First Notice | | 6/25/2012 | 7/6/2012 | | DONE |
|
|
|
faxed to CM Co
|
ACHD Occupancy Approval | 6/15/2012 | 6/15/2012 | 6/15/2012 | | DONE |
Barbara Stitt
|
|
|
Per email from breann with ACHD see scanned documents//6-15-12//BAS
|
BLD-Aging Inspection | 6/8/2012 | 6/8/2012 | 6/15/2012 | | DONE |
Dave Hannah
|
|
|
|
Permanent Occupancy | | | 6/15/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 6/13/2012 | 6/15/2012 | 6/14/2012 | P | PASS |
Dave Hannah
|
|
|
Perm Occupancy
|
Zoning Approval | 6/12/2012 | 6/12/2012 | 6/12/2012 | | PASS |
Josh Wilson
|
|
|
Landscaping is completed and bond for landscaping can be released.
|
PubWorks Occupancy Approval | 5/11/2012 | 5/11/2012 | 5/11/2012 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 3/29/2012 | 6/27/2012 | 3/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
Change Expiration Date Only | | | 3/29/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 3/19/2012 | 3/19/2012 | 3/27/2012 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 12/30/2011 | 1/3/2012 | 1/3/2012 | A | PASS |
Forrest France
|
|
|
C/N items verified for completion, project related FIR permits approved for final. Discussed rack storage requirements per IFC with contractor.
|
BLD-Final | 12/22/2011 | 12/23/2011 | 12/23/2011 | P | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### ok for temp occ ok for perm occ after fire gos perm
|
FIRE-Final Inspection | 12/22/2011 | 12/23/2011 | 12/23/2011 | A | PART |
Forrest France
|
|
|
Temp. occupancy approved per agreements with contractor and R. Gervais. Final pending fire alarm installation matching approved plan modification.
|
Temporary Occupancy | 12/23/2011 | 3/22/2012 | 12/23/2011 | | DONE |
Christina Prado
|
|
|
|
FIRE-Final Inspection | 12/21/2011 | 12/22/2011 | 12/22/2011 | A | FAIL |
Forrest France
|
|
|
Correction items for fire life safety approvals include; exit door hardware at four locations, missing EM lighting at two areas, project related fire alarm and sprinkler permit finals.
|
BLD-Final | 12/20/2011 | 12/21/2011 | 12/22/2011 | P | FAIL |
Dave Hannah
|
|
|
tom Phone #: ###-#### need other trades finaled needs failproof door hardwear on exit doors needs handrails and gaurd rails
|
Zoning Approval Temp | 12/21/2011 | 12/21/2011 | 12/21/2011 | | DONE |
Josh Wilson
|
|
|
Bond is in place for incomplete landscaping
|
BLD-Other | 12/7/2011 | 12/7/2011 | 12/8/2011 | P | PART |
Dave Hannah
|
|
|
ceiling grid//Tom Phone #: ###-####6 ok after all other trades ok
|
FIRE-Conference | 11/18/2011 | 11/18/2011 | 11/18/2011 | A | DONE |
Forrest France
|
|
|
Regarding FDC clearance
|
BLD-Other | 11/14/2011 | 11/14/2011 | 11/15/2011 | P | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-#### framing of the canopy south end of bld ok
|
BLD-Concrete | 11/3/2011 | 11/3/2011 | 11/3/2011 | P | PASS |
Jim Storey
|
|
|
Concrete---Dan ###-#### grout under stair posts ok
|
CHANGE STATUS TO (ISS) | | | 11/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 11/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 10/28/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 10/28/2011 | | DONE |
Christina Prado
|
|
|
Left msg for David giving fees due
|
Permit Ready to Issue | | | 10/28/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 10/6/2011 | 10/6/2011 | 10/27/2011 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 10/6/2011 | | 10/27/2011 | | PASS |
Carl Westfall
|
|
|
(10/6/11) Waiting for the revised design. (10-27-11) Drawings approved after revised design was submitted and reviewed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2011 | | DONE |
|
|
|
|
BLD-Other | 10/20/2011 | 10/21/2011 | 10/21/2011 | A | PASS |
Dave Hannah
|
|
|
Stem Wall--Tom ###-#### ada ramp and stairs ext
|
BLD-Footing | 10/20/2011 | 10/20/2011 | 10/20/2011 | A | PASS |
Dave Hannah
|
|
|
TOM ###-####
|
Plan resubmittals received | | | 10/18/2011 | | |
|
|
|
Received 3 copies of sheets S0.01, S1.02, S1.03, S5.41, and 3 copies of structural calcualtions and
|
BLD-Framing/Rough-in | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
Telephone call | | | 10/13/2011 | | DONE |
|
|
|
Talked to the Structural Engineer's rep. He said the design had changed. Waiting for the revised design.
|
BLD-Framing/Rough-in | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | PART |
Dave Hannah
|
|
|
Tom ###-####
|
BLD-Foundation | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | PASS |
Dave Hannah
|
|
|
tom ###-#### ok to pour loading dock walls
|
Override - Parcel Holds | | | 10/11/2011 | | |
|
|
|
|
Override - Parcel Holds | | | 10/11/2011 | | |
|
|
|
|
BLD-Footing | 10/7/2011 | 10/10/2011 | 10/10/2011 | A | PASS |
Jim Storey
|
|
|
Tom ###-####
|
Override - Parcel Holds | | | 10/7/2011 | | |
|
|
|
|
Plan Modification Accepted | | | 10/6/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification accepted for Bld11-01396 (Biomark Building Renovation) to replace damages structural columns and beams at the exterior canopy on the building's south face; submitted on revised cert of value and plan sheets S0.01, S1.02, S1.03, S5.41; routed to Carl Westfall.
|
BLD-Framing/Rough-in | 10/4/2011 | 10/4/2011 | 10/5/2011 | P | PART |
Dave Hannah
|
|
|
Tom Phone #: ###-#### ok to cover offices on north eng of project
|
BLD-Footing | 10/3/2011 | 10/4/2011 | 10/4/2011 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/23/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing PW Drainage | 8/17/2011 | | 8/19/2011 | | PASS |
Brian Murphy
|
|
|
|
Plan assigned to (CJW) | 6/22/2011 | | 8/19/2011 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 8/18/2011 | | 8/19/2011 | | DONE |
Carl Westfall
|
|
|
Back from PW.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/19/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/19/2011 | | DONE |
Christina Prado
|
|
|
Called and spoke to David about fees due and ACHD requirements
|
Override - Parcel Holds | | | 8/19/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/19/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PUBLIC WORKS | 8/17/2011 | | 8/18/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Sewer Design | 8/18/2011 | | 8/18/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Sanitary sewer already connected. No changes to service.
|
Plan resubmittals received | | | 8/17/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal and three copies of plan sheet C1; taken to Carl Westfall
|
Routing - PLAN CHECK | 8/10/2011 | | 8/17/2011 | | DONE |
Carl Westfall
|
|
|
Taken to PW by Ron Hill.
|
Routing - PLAN CHECK | 8/2/2011 | | 8/10/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
CHANGE STATUS TO (REV) | | | 8/5/2011 | | DONE |
Rita DeYoung
|
|
|
issued by mistake
|
Plan resubmittals received | | | 8/5/2011 | | |
|
|
|
Received 1 cover transmittal and 1 copy of heating and cooling calculations and taken over to Carl Westfall
|
Plan resubmittals received | | | 8/5/2011 | | DONE |
Tisha Gallop
|
|
|
received revised cert of value to split demo into seperate permit (Bld11-01859), scanned and attached to building permit and put paper copy with plan set.
|
Issue PAID IN FULL permit | | | 8/4/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/26/2011 | | 8/1/2011 | | FAIL |
Carl Westfall
|
|
|
Completed the 2nd plan review. Two items were not resolved. Sent E-mail to the Architect.
|
Plan resubmittals received | | | 7/28/2011 | | |
|
|
|
received 3 comments,and 2 copies of sheets A0.00,A0.01A,Z0.03,Z0.04,Z2.32,Z5.02,S0.01,S1.03,S2.01,S8.01,M2.11,M2.12,M3.00,M3.01,M4.00, P2.11,E2.12,E2.13,E3.01sent to Carl W
|
Routing - Erosion and Sediment | 7/25/2011 | | 7/26/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00399 plan waiver approved with conditions attached to the permit.
|
Routing - PUBLIC WORKS | 7/7/2011 | | 7/20/2011 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Street Lights | 7/20/2011 | | 7/20/2011 | | PASS |
Mike D Hedge
|
|
|
|
Routing - FIRE | 7/16/2011 | 7/16/2011 | 7/19/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 7/19/2011 | | FAIL |
|
|
|
Failed Public Works, Erosion & Soil Control, Plan Check
|
Route to Impact Fee Review | 7/16/2011 | 7/21/2011 | 7/18/2011 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 7/1/2011 | | 7/16/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on July 13 and finished on July 16 (4 work days). Revised drawings were required. See the plan review report.
|
Plan resubmittals received | | | 7/7/2011 | | DONE |
Christina Prado
|
|
|
Clint Smith brough ESC Waiver to attach that was emailed to him. Inserted by Clint and taken back to Carl Westfall
|
Routing - PLANNING | 6/30/2011 | | 7/1/2011 | | PASS |
Joshua Johnson
|
|
|
Josh Johnson - CUP11-00001 & CVA11-00001
Josh Wilson- DRH11-00067
|
Routing - PLUMBING | 6/28/2011 | | 6/30/2011 | | PASS |
Bill VanDegrift
|
|
|
Per plans and 2003 UPC.
|
Routing PW Street Lights | 6/24/2011 | | 6/30/2011 | | PASS |
Mike D Hedge
|
|
|
Plans fail to show power source for historical street lights on 9th street.
Pleae showed source, I missed it. All is well.
|
Routing PW Drainage | 6/27/2011 | | 6/28/2011 | | FAIL |
|
|
|
NEED ACHD SIGN OFF ON DISCHARGE
|
Routing - PUBLIC WORKS | 6/22/2011 | | 6/28/2011 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | | | 6/28/2011 | | FAIL |
Steven Webb
|
|
|
ESC11-00399 plan failed. Refer to the plan check list for deficencies.
|
Routing PW Sewer Rating | 6/24/2011 | | 6/24/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 6/24/2011 | | 6/24/2011 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Addressing | 6/23/2011 | | 6/23/2011 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 6/21/2011 | | 6/22/2011 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 6/21/2011 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/21/2011 | | | |
|
|
|
|