BLD-Final | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Tony Young
|
|
|
bryan - please call 1 hr prior Phone #: ###-####
|
DOC - Permit Finaled | 11/15/2011 | 11/15/2011 | 11/15/2011 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 11/8/2011 | 11/9/2011 | 11/9/2011 | A | FAIL |
Tony Young
|
|
|
BRIAN Please call 1 hr before going out so he can be there. Phone #: ###-####,, needs handrail to meet code,, brace pony walls
|
Elevation Cert Rec'd-Final | | | 11/8/2011 | | DONE |
|
|
|
Received Elevation Certificate.
|
BLD-Energy code compliance | 8/22/2011 | 8/23/2011 | 8/23/2011 | P | PASS |
Tony Young
|
|
|
Bryan Phone #: ###-####
|
BLD-Framing/Rough-in | 8/19/2011 | 8/22/2011 | 8/22/2011 | A | PASS |
Tom Arcoraci
|
|
|
Bryan Phone #: ###-####
|
Override - Parcel Holds | 8/22/2011 | 1/1/1900 | 8/22/2011 | | |
|
|
|
this is for a energy inspection only
|
BLD-Foundation | 7/20/2011 | 7/21/2011 | 7/21/2011 | A | PASS |
Tom Arcoraci
|
|
|
Eric Phone #: ###-####
|
Override - Parcel Holds | 7/20/2011 | 1/1/1900 | 7/20/2011 | | |
|
|
|
Foundation insp only
|
BLD-Footing | 7/14/2011 | 7/15/2011 | 7/15/2011 | P | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 7/15/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Jim Storey
|
|
|
|
BLD-Conference | 7/15/2011 | 7/15/2011 | 7/15/2011 | A | PASS |
Jim Storey
|
|
|
Eric Phone #: ###-####,, stopped by to look at progress,, needs to dig out more top soil in lower section,, no forms were set,,( this was done 7/14/2011)
|
BLD-Footing | 7/13/2011 | 7/14/2011 | 7/14/2011 | P | CANC |
Tony Young
|
|
|
eric Phone #: ###-#### - around 3 if possible pleaseContractor called and canceled
|
Override - Parcel Holds | 7/14/2011 | 1/1/1900 | 7/14/2011 | | |
|
|
|
Inspection is for footing
|
OVERRIDE | | | 7/13/2011 | | |
|
|
|
|
Plan assigned to (CDM) | | 6/21/2011 | 7/13/2011 | | PASS |
Carl D Madsen
|
|
|
|
Override - Parcel Holds | 7/13/2011 | 1/1/1900 | 7/13/2011 | | |
|
|
|
this is for footing inspection only
|
Telephone call | | | 7/13/2011 | | DONE |
Tisha Gallop
|
|
|
called Doug Lasher Const. and left vm permit is ready and fees.
|
Inspection Record Card- Bld | | | 7/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 7/13/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/13/2011 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/13/2011 | | 7/13/2011 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/13/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 7/13/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 7/13/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan resubmittals received | | | 7/12/2011 | | |
|
|
|
Received 1 cover transmital, 1 copy of email from Pat Bird dated 7-11-11, 1, copy structural calcs dated 6-15-11 and taken to Carl MAdsen's Desk
|
Plan resubmittals received | | | 7/12/2011 | | DONE |
Christina Prado
|
|
|
Received three sets of S-101 & S-108. Routed to Carl Madsen for review
|
1st review completed | | | 7/8/2011 | | FAIL |
|
|
|
Tall wall engineering is required. Talked to Brian at Lasher Construction. 7-8-11 CDM
|
Case Summary (BLD) | | | 7/8/2011 | | DONE |
|
|
|
|
Routing - Addressing | 6/21/2011 | | 7/8/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLAN CHECK | 6/27/2011 | | 7/8/2011 | | FAIL |
Carl D Madsen
|
|
|
Tall wall engineering is required. 7-8-11 CDM
|
Route to Impact Fee Review | 6/21/2011 | 6/24/2011 | 7/7/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 6/28/2011 | | 6/28/2011 | | PASS |
Joshua Johnson
|
|
|
Corrected driveway SAC
|
Routing - MECHANICAL | 6/23/2011 | | 6/27/2011 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 6/22/2011 | | 6/23/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 6/21/2011 | | PASS |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/21/2011 | | | |
|
|
|
|
Routing - PLANNING | 6/23/2011 | | | | FAIL |
|
|
|
Circular drive in the front setback.
|