Second Notice | | 9/18/2011 | 9/22/2011 | | DONE |
|
|
|
faxed 9/22/11///received Sept 26th
|
First Notice | | 9/1/2011 | 9/8/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 8/12/2011 | 8/16/2011 | 8/16/2011 | P | CANC |
Mike Jordan
|
|
|
call when on way//Eri Phone #: ###-####
|
BLD-Final | 8/16/2011 | 8/16/2011 | 8/16/2011 | A | PASS |
Mike Jordan
|
|
|
Ok for perm occ.
|
FIRE-Final Inspection | 8/15/2011 | 8/16/2011 | 8/16/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 8/12/2011 | 8/15/2011 | 8/15/2011 | A | FAIL |
Troy Cobbley
|
|
|
call when on way//Eri Phone #: ###-#### Called the contact and left voice mail that I was on the way. I arrived and found tenant open but nobody there. No inspection was performed.
|
Issue PAID IN FULL permit | | | 8/12/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 7/15/2011 | | 7/21/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/18/2011 | | 7/21/2011 | | PASS |
Tim L. Woodard
|
|
|
Tim Woodard
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/21/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/21/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/21/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 7/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 7/21/2011 | | DONE |
Tisha Gallop
|
|
|
Called Rocky and left vm permit is ready and fees.
|
Plan Modification Accepted | | | 7/15/2011 | | |
|
|
|
From the original plans now deleting the wall between the two dressing rooms and adding a window to replace one dressing room door. All other items on submittal are shown as future construction. Submitted sheet A1.1 and a revised cert of value.
|
Case Summary (BLD) | | | 6/29/2011 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/28/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/28/2011 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2011 | | DONE |
|
|
|
6-28-11 called Rocky permit ready and fee given ///dld
|
Plan assigned to (TLW) | 6/22/2011 | | 6/27/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 6/22/2011 | | 6/27/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 6/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 6/27/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 6/22/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/22/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 6/22/2011 | | | |
|
|
|
|