(GAME STOP – Venture Development Bldg) Permit is to remodel an existing 1,683 square foot mixed use building. This building is fully fire sprinklered for area increase. Approval contingent upon adhering to the approved plans on file. Work to include: construction of new demising wall to separate the stock room from the sales floor, installation of new lighting, installation of a new hi/low drinking fountain, and interior finishes in compliance with Ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW** 9-14-11 FINAL CERT OF VALUE PER GC $ 26,507.00 /// DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/24/201110/11/2011 DONE
DetailsChristina Prado
faxed 10-11-11///done 9/14 by DLD
First Notice 9/3/20119/14/2011 DONE
BLD-Final8/23/20118/24/20118/24/2011PPASS
DetailsMike Jordan
Tom Phone #: ###-####. Ok for perm occ.
Permanent Occupancy UNPAID FEE  8/24/2011 DONE
DetailsBarbara Stitt
FIRE-Final Inspection8/22/20118/23/20118/23/2011PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Conference8/22/20118/22/20118/22/2011PPASS
DetailsTroy Cobbley
Discussed life safety requirements.
BLD-Framing/Rough-in8/18/20118/18/20118/18/2011PPASS
DetailsMike Jordan
Tom Phone #: ###-####. Interior steel stud framed wall for new stockroom.
Issue PAID IN FULL permit  8/15/2011 DONE
DetailsChristina Prado
Case Summary (BLD)  7/27/2011 DONE
Plan assigned to (TLW)6/24/2011 7/26/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/22/2011 7/26/2011 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/26/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/26/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  7/26/2011 DONE
Permit Ready to Issue  7/26/2011 DONE
Telephone call  7/26/2011  
7-26-11 called left message for Mike permit ready and fee given - Also need GC & PLM value ///dld
Routing - PUBLIC WORKS7/21/2011 7/22/2011 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating7/22/2011 7/22/2011 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK7/21/2011 7/21/2011 PASS
DetailsTim L. Woodard
Latest resubs address all plan corrections requirements. Routed to public works due to the addition of a hi/low drinking fountain. TLW
Routing - Addressing7/21/2011 7/21/2011 PASS
DetailsTerry Records
Plan resubmittals received  7/20/2011 DONE
DetailsTisha Gallop
received by mail five copies of response, Interior Lighting Compliance, and plan sheets T1, D1, A1, A2, E1, E2, E3, M1; taken to Tim Woodard.
Plan resubmittals received  7/8/2011 DONE
DetailsTisha Gallop
received by mail five copies of response, Interior Lighting Compliance, and plan sheets T1, D1, A1, A2, E1, E2, E3, M1; taken to Tim Woodard.
Routing - PLAN CHECK6/24/2011 7/7/2011 FAIL
DetailsTim L. Woodard
Refer to corrections within the plan review report. Tim Woodard
1st review completed  7/7/2011 DONE
DetailsTim L. Woodard
Application received 6/24/20116/24/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  6/24/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/24/2011 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  6/24/2011 DONE
DetailsBarbara Stitt