Third Notice | | 12/10/2011 | 12/7/2011 | | DONE |
|
|
|
faxed in and completed 12-06-2011
|
Second Notice | | 12/1/2011 | 12/5/2011 | | DONE |
Christina Prado
|
|
|
faxed 12-05-11
|
First Notice | | 11/10/2011 | 11/21/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/31/2011 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | FAIL |
Troy Cobbley
|
|
|
The duct smoke detector was not ready for inspection. Rescheduled for tomorrow.
|
BLD-Final | 10/20/2011 | 10/21/2011 | 10/21/2011 | P | PASS |
Mike Jordan
|
|
|
Late afternoon---John Phone #: ###-####. Will be ok for perm occ. once fire/life/safety has passed.
|
FIRE-Final Inspection | 10/20/2011 | 10/21/2011 | 10/21/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide for the required testing and corrected mounting location of the duct smoke detector.
|
BLD-Framing/Rough-in | 9/12/2011 | 9/13/2011 | 9/13/2011 | A | PASS |
Mike Jordan
|
|
|
Fire rated ply has been provided at mezz. All firestop data has been supplied and applied to tenant side.
|
Routing - PLAN CHECK | 9/8/2011 | | 9/12/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 9/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 9/12/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 9/12/2011 | | DONE |
|
|
|
t/c w john - permit (plan mod) ready and fees given
|
Override - Parcel Holds | | | 9/12/2011 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/12/2011 | | DONE |
Barbara Stitt
|
|
|
Issue Plan modification
|
(F) Reprint permit | | | 9/12/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan Modification Accepted | | | 9/8/2011 | | DONE |
Tisha Gallop
|
|
|
Plan Modification acceptd for Bld11-01445 (Crowell's Upholstery) for general construction changes; submitted on plan sheets A200, A201, A202, A400, A600, A601, A710, A810, A820, A830; routed to Sam Zahorka.
|
BLD-Framing/Rough-in | 9/6/2011 | 9/7/2011 | 9/7/2011 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior steel stud framed walls and soffits, except for areas by south fire barrier walls. Provide fire rated ply at mezz. Still needs to provide approved fire stop systems at south fire barrier wall.
|
BLD-Energy code compliance | 9/6/2011 | 9/7/2011 | 9/7/2011 | P | CANC |
Mike Jordan
|
|
|
steve Phone #: ###-####
|
BLD-Wall cover | 8/18/2011 | 8/22/2011 | 8/22/2011 | A | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Need additional UL deatils from architect.
|
BLD-Other | 8/18/2011 | 8/18/2011 | 8/18/2011 | P | PART |
Mike Jordan
|
|
|
Fire wall inspection--John suppose to be at 9:30am Phone #: ###-####. Went over fire barrier wall detail with contractor.
|
Issue PAID IN FULL permit | | | 8/18/2011 | | DONE |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 8/16/2011 | | |
|
|
|
|
Print Occupancy Form | | | 8/16/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2011 | | DONE |
Christina Prado
|
|
|
Called to let Hal know permit is ready and what the fees are. Hall out of town spoke with Tony instead.
|
Override - Parcel Holds | | | 8/16/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/16/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 6/28/2011 | | 8/16/2011 | | PASS |
Sam Zahorka
|
|
|
1st review completed.
|
Routing - PLAN CHECK | 7/25/2011 | | 8/16/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 8/12/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of plan sheet A400; taken to Sam Zahorka
|
1st review completed | | | 7/25/2011 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - FIRE | 7/21/2011 | | 7/25/2011 | | PASS |
Scott Arellano
|
|
|
IFAttached IFC comments to plans
|
Routing - PLAN CHECK | 6/30/2011 | | 7/21/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 7/7/2011 | | DONE |
|
|
|
received by fax 1 ACHD receipt, scanned and attached
|
Routing PW Sewer Rating | 6/29/2011 | | 6/30/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 6/28/2011 | | 6/30/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLANNING | 6/30/2011 | | 6/30/2011 | | PASS |
Scott Spjute
|
|
|
Scott Spjute - Letter in documents with plans
|
Pending Assignment by JCB | 6/27/2011 | | 6/28/2011 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 6/28/2011 | | DONE |
Jason Blais
|
|
|
Emailed architect to have him contact ACHD for impact fee evaluation. Written verification from ACHD will need to be provided to our Permit Counter prior to the building permit being issued.
|
Override - Parcel Holds | | | 6/27/2011 | | |
|
|
|
|
Application received | | 6/24/2011 | 6/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/24/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/24/2011 | | PASS |
Dan Stuart
|
|
|
|