Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-01486
StatusFinaled
Name ALLIANCE RESTORATION SERVICES
Site Address 5831 W FRANKLIN RD
Project NameFAMILY DOLLAR STORE
Customer Number 
ePlanReviewNo
Description
(FAMILY DOLLAR STORE) Remodel to repair/reconstruct a portion of a 2-hour rated east exterior wall of an existing building located on the property line per approved plans and structural engineering design. Work to include: Select demolition work per plans; infill old storefront/restroom openings with new reinforced CMU; extend new CMU wall past the exterior mansard roof; repair masonry next to existing pilaster; remove and replace CMU at damaged areas as specified; perform structural modification work per Engineering and plan locations; provide new roof insulation; clean and install plumbing fixtures/grab bars; remove and replace damaged lighting fixtures and exhaust fans; provide new exit light/emergency light combos at locations per plans; and all other work per the approved plans, attached plan review report, and all applicable codes. Planning approval done under CZC11-00117. NOTE: This building is NOT fire sprinklered. SPECIAL INSPECTIONS ARE REQUIRED. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/5/20128/23/2012 DONE
First Notice7/18/20127/18/20127/26/2012 DONE
DetailsTom Arcoraci
Complete 07-26-2012
Letter of compliance/Occupancy  7/19/2012 DONE
DetailsTisha Gallop
BLD-Final7/18/20127/18/20127/18/2012PPASS
DetailsTom Arcoraci
josh Phone #: ###-####
DOC - Permit Finaled7/18/20127/18/20127/18/2012PPASS
DetailsTom Arcoraci
FIRE-Final Inspection7/16/20127/17/20127/17/2012APASS
DetailsTroy Cobbley
life safety passed
Routing - Addressing7/12/2012 7/12/2012 PASS
DetailsTerry Records
Address changed to 5831 to reflect address on door
FIRE-Final Inspection7/10/20127/11/20127/11/2012AFAIL
DetailsForrest France
Noted correction items include; post three 2A10BC fire extinguishers with current certification tags at locations indicated on plan sheet A1.2 keynote #29, repair exit discharge light at the main entry landing, one light bulb at the EM light SE second exit is not functional, posted building address does not match permit documents. Need to verify existing duct detectors are operational.
Zoning Approval7/10/20127/10/20127/10/2012 PASS
DetailsJosh Wilson
BLD-Other5/3/20125/3/20125/3/2012PPASS
DetailsTom Arcoraci
DON CALL FOR ACCESS Phone #: ###-####
BLD-Energy code compliance3/28/20124/6/20124/6/2012PPASS
DetailsTom Arcoraci
Chad @ ###-####--Please call for access information/code
BLD-Other2/6/20122/6/20122/6/2012APASS
DetailsTom Arcoraci
BLD-Wall cover1/10/20121/10/20121/10/2012APASS
DetailsTom Arcoraci
masonary wall complete and per plan
BLD-Concrete10/24/201110/24/201110/24/2011PPASS
DetailsTom Arcoraci
Called 30min prior for access----Chad Phone #: ###-#### masonry wall complete pending spec insp/eng report
BLD-Foundation9/6/20119/7/20119/7/2011APASS
DetailsJim Sly
Steve Phone #: ###-####
BLD-Footing9/6/20119/6/20119/6/2011PPASS
DetailsJim Sly
greg Phone #: ###-####
Called Nick Struct Eng......No special insp req.
BLD-Conference8/3/20118/4/20118/4/2011ACANC
DetailsTom Arcoraci
call Sam Zahorka ###-####
Plan Reviewer's activity  8/3/2011 DONE
DetailsSam Zahorka
Met with Randy about this project at the front counter. He explained his situation with the adjacent property owner and his in-ability to begin the construction as defined under this permit. He stated he considered the building to be in an unsafe condition that needed fixed promptly but, because of a civil matter could not begin the work. I set up a conference inspection with the structural inspector Tom Arcoraci and let Randy know I would contact him once the inspection was completed.
Issue PAID IN FULL permit  7/27/2011 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK7/22/2011 7/25/2011 PASS
DetailsJason Blais
All review disciplines have passed the project.
PLANS/APPL TAKEN TO FRONT DESK  7/25/2011 DONE
DetailsJason Blais
Case Summary (BLD)  7/25/2011  
Inspection Record Card- Bld  7/25/2011 DONE
Permit Ready to Issue  7/25/2011 DONE
DetailsTisha Gallop
Telephone call  7/25/2011 DONE
DetailsTisha Gallop
called Pat Mckeegan and told him permit is ready, fees and need GC/RCE/form and RP.
Plan assigned to (SRZ)6/30/2011 7/25/2011 PASS
DetailsSam Zahorka
Routing - FIRE7/21/2011 7/22/2011 PASS
DetailsScott Arellano
No seperate Fire Code comments attached to plans. Field verify new exit sign locations and existing fire extinguisher locations per plan sheet A1.2. Final approval will be subject to satisfactory field inspection by the PDS Fire inspector.
1st review completed  7/22/2011 PASS
Routing - PLAN CHECK7/1/2011 7/21/2011 PASS
DetailsSam Zahorka
Routing - Design Review6/30/2011 7/1/2011 PASS
DetailsJosh Wilson
Josh Wilson - CZC11-00117
Routing - Erosion and Sediment6/30/2011 6/30/2011 PASS
DetailsSteven Webb
ESC plan waiver request is approved according to the ESC Permit conditions. ESC11-00443.
Pending Assignment by JCB6/29/2011 6/30/2011 DONE
DetailsJason Blais
Application received 6/28/20116/28/2011 DONE
DetailsBarbara Stitt
Intake Approval  6/28/2011 PASS
DetailsCarl Westfall
Recd Pcfee & Taken To Pln CK  6/28/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  6/28/2011 DONE
DetailsBarbara Stitt