Agreement of Future work | 9/16/2011 | 9/12/2014 | 5/1/2019 | | FAIL |
Sam Zahorka
|
|
|
Notice of non compliance recorded with county
Upgrade agreement attached to this case.
11/29/13 - Contacted architect on status. JCB
Spring of 2014 - Met with architect and owner on status. No progress.
1/8/15 Work not completed by expiration date. Will contact legal department for next steps.
|
Plan Reviewer's activity | | | 6/9/2017 | | DONE |
Jason Blais
|
|
|
Notice of Non-compliance recorded on the property at Ada County. Copy attached to this case. Work required to be completed in the Upgrade Agreement is still outstanding.
|
BLD-Other | 2/27/2015 | 2/27/2015 | 2/27/2015 | A | DONE |
Bob Archibald
|
|
|
Provisions of upgrade agreement on south wall have not been completed.
|
Plan Reviewer's activity | | | 1/8/2015 | | DONE |
Jason Blais
|
|
|
Email below sent to architect for status. Upgrade agreement timeframe has expired.
Rob,
RE: BLD11-01512 Kabul Market Upgrade Agreement
To our knowledge, the work outlined in the attached upgrade agreement has not been permitted and completed. The time frame to complete the work in the agreement has passed.
Has a non-build easement on the adjacent property been obtained? Has the roof structure over the property line been removed? Please provide an immediate response with a status.
Sincerely,
Jason Blais
|
Second Notice | | 6/16/2012 | 7/3/2012 | | DONE |
|
|
|
Mailed 7-2-12
|
First Notice | | 5/24/2012 | 6/6/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/14/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 5/10/2012 | 5/11/2012 | 5/11/2012 | P | PASS |
Tom Arcoraci
|
|
|
Rahmat - life safety Phone #: ###-####
|
FIRE-Final Inspection | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed per plan modifications deleting the cooking line.
|
BLD-Conference | 5/10/2012 | 5/10/2012 | 5/10/2012 | P | CANC |
Tom Arcoraci
|
|
|
To get final occupancy set up
|
CHANGE STATUS TO (ISS) | | | 5/10/2012 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Override - Parcel Holds | | | 5/10/2012 | | |
|
|
|
|
Telephone call | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
Spoke to Rob and advised permit plan mod is ready and needs to be picked up asap
|
Telephone call | | | 5/8/2012 | | DONE |
Christina Prado
|
|
|
Gave a reminder call to Rob to pick up asap as temp occupancy is now expired
|
OVERRIDE | | | 5/7/2012 | | |
|
|
|
|
Plan assigned to (SRZ) | 4/27/2012 | 4/27/2012 | 5/7/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 5/4/2012 | | 5/7/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2012 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 5/7/2012 | | DONE |
|
|
|
|
Telephone call | | | 5/7/2012 | | DONE |
Tisha Gallop
|
|
|
called Rob Thornton and left message for him that plan mod is ready and fee due
|
Override - Parcel Holds | | | 5/7/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 5/7/2012 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 5/4/2012 | | 5/4/2012 | | PASS |
Andrea Tuning
|
|
|
Plan Modification submitted.
|
Plan Modification Accepted | | | 4/27/2012 | | DONE |
Barbara Stitt
|
|
|
Plan mod accepted to remove commercial kitchen cookline from the project. The existing bakery (before remodel) remains intact, but the restaurant cookline goes away. Sheet A-101 with application was submitted with no change in value.
|
Change Expiration Date Only | | | 4/13/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 4/3/2012 | 4/3/2012 | 4/3/2012 | | PASS |
Tom Arcoraci
|
|
|
|
Temporary Occupancy | 2/6/2012 | 5/6/2012 | 2/6/2012 | | DONE |
Darla L Downs
|
|
|
|
BLD-Final | 1/31/2012 | 2/1/2012 | 2/1/2012 | A | PART |
Tom Arcoraci
|
|
|
rahmet - after 10:00 please - call 1/2 hr prior Phone #: ###-#### ok for temp occ mech will be done when kitchen area is finished
|
FIRE-Final Inspection | 1/30/2012 | 1/31/2012 | 1/31/2012 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given with Romeo Gervais permission until the kitchen area is complete. Per Sam, in plan review, the single action "paddle" hardware on the store front door from the Dining area is permissable.
|
Zoning Approval | 1/31/2012 | 1/31/2012 | 1/31/2012 | | DONE |
Andrea Tuning
|
|
|
|
FIRE-Final Inspection | 1/24/2012 | 1/25/2012 | 1/25/2012 | A | FAIL |
Troy Cobbley
|
|
|
It appears that the exit sign at the corridor leading to the dining area and panic hardware for the exterior exit from the dining area is still an issue. I spoke to Rob, the architect, and let him know that he needs to contact Sam in plan review about these issues.
|
Override - Parcel Holds | 1/24/2012 | 1/1/1900 | 1/24/2012 | | |
|
|
|
fire final
|
FIRE-Final Inspection | 1/3/2012 | 1/4/2012 | 1/4/2012 | P | FAIL |
Troy Cobbley
|
|
|
Repair all exit signs/emergency lights, provide exit discharge lights per plan sheet A-101, provide panic hardware at door 102 per plan sheet A-101, provide sticker above the main exit door "Door to remain . . .....", provide ADA hardware for all pocket doors, relocate the hallway exit sign to the location shown per plan sheet A-101
|
BLD-Framing/Rough-in | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | PASS |
Tom Arcoraci
|
|
|
Rahmat Phone #: ###-####
|
FIRE-Conference | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | DONE |
Troy Cobbley
|
|
|
Met with the owner, architect and the building inspector about scope of work changes and a possible temporary occupancy.
|
BLD-Conference | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | PASS |
Tom Arcoraci
|
|
|
Rob Phone #: ###-#### must have ok from fire for temp occ without kitchen
|
Issue PAID IN FULL permit | | | 9/19/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 8/23/2011 | | 9/16/2011 | | PASS |
Sam Zahorka
|
|
|
|
Override - Parcel Holds | | | 9/16/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 9/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 9/16/2011 | | 9/16/2011 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 9/16/2011 | | 9/16/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 9/16/2011 | | DONE |
Tisha Gallop
|
|
|
|
Override - Parcel Holds | | | 9/16/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 9/16/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/16/2011 | | DONE |
Tisha Gallop
|
|
|
called Rob Thornton and left vm permit is ready, fees, need ACHD, GC and RP.
|
Plan assigned to (SRZ) | 8/4/2011 | | 9/16/2011 | | PASS |
Sam Zahorka
|
|
|
1st review completed. Plan reassigned to Sam Zahorka.
|
Plan resubmittals received | | | 9/9/2011 | | |
|
|
|
9-9-11 received 1 transmittal letter,1 response and 2 copies of sheets A-101,A-201,A-501,AS-101 sent to Sam Z
|
Meeting | | | 8/24/2011 | | DONE |
Sam Zahorka
|
|
|
Meeting with the applicant, the design proffessional, building official, planner, and myself. This meeting was requested by the design proffessional to discuss the plan review corrections. More specifically: the change of use, exterior upgrades to an existing exterior wall located on the property line that is not in compliance, and changes to the exterior windows that modify his zoning approvals. The applicant and his design proffessional do not agree that a change of use has occured, do not want to correct the property line wall issue, and want to remove some windows that were required per planning and zoning approvals. Jason Blais the Building Official offered a Temporary Occupancy permit once permit is issued without the exterior wall corrections being fully completed to help. SRZ
|
Routing - PLUMBING | 8/17/2011 | | 8/23/2011 | | PASS |
Bill VanDegrift
|
|
|
1. swamp cooler water drain down needs a airgap at drain site.
2. If Bench sewer requires a separate grease intercepter then a resubmittal of plans will be required.
3. Per plans and 2003 UPC.
|
Plan resubmittals received | | | 8/18/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of plans P-00, P-10 & P-20. Also received one copy of transmittal letter. Plans and letter routed to Sam Zahorka for additional review
|
Routing - PLAN CHECK | 8/15/2011 | | 8/17/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Routing - MECHANICAL | 8/17/2011 | | 8/17/2011 | | PASS |
Troy James
|
|
|
|
1st review completed | | | 8/15/2011 | | FAIL |
|
|
|
Failed Plumbing, Mechanical, plan check.
|
Routing - FIRE | 8/10/2011 | | 8/15/2011 | | PASS |
Scott Arellano
|
|
|
Plans are approved as noted. A seperate "Commercial Cooking Hood extinsuishing" permit is required for the new commerical cooking exhaust hood assembly. *No seperate Fire Code plan review report is attached to this permit case, or with these plans due to system network problems.
|
Plan resubmittals received | | | 8/11/2011 | | DONE |
Tisha Gallop
|
|
|
received response and two copies of plan sheets G-002, A-101, A-102, A-201, AS-101, F-101, M-10, M-20; taken to Sam Zahorka
|
Routing - PLAN CHECK | 8/4/2011 | | 8/10/2011 | | FAIL |
Sam Zahorka
|
|
|
|
Plan assigned to (DRS) | 7/5/2011 | 7/5/2011 | 8/4/2011 | | DEFR |
|
|
|
Plans reassigned to Sam Zahorka.
|
Routing - PLAN CHECK | 7/20/2011 | | 8/4/2011 | | DEFR |
Dan Stuart
|
|
|
Plans reassigned to Sam Zahorka.
|
Routing - MECHANICAL | 7/12/2011 | | 7/20/2011 | | FAIL |
Troy James
|
|
|
Called mechanical engineer. Informed him type 1 hood is not large enough for the equipment shown at sheet F-101.
|
Routing - PLUMBING | 7/8/2011 | | 7/12/2011 | | FAIL |
Bill VanDegrift
|
|
|
1. Provide a complete set of plumbing plans that shows how all fixtures are tied into existing or new waste and vent lines and sizing.
|
Routing - Design Review | 7/8/2011 | | 7/8/2011 | | PASS |
Andrea Tuning
|
|
|
DRH11-00120
|
Routing - Erosion and Sediment | 7/7/2011 | | 7/8/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00451 plan waiver approved with conditions attached to the permit.
|
Routing - PUBLIC WORKS | | | 7/7/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/5/2011 | | 7/6/2011 | | PASS |
Terry Records
|
|
|
|
Override - Parcel Holds | | | 7/5/2011 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/5/2011 | | |
|
|
|
|
Plan Reviewer's activity | | | 7/5/2011 | | DONE |
|
|
|
E-mail to Rob Thornton concerning need for approval from ACHD before the permit can be issued.
|
Plan resubmittals received | | | 7/5/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal and two copies of plan sheets G-001, A-102, P-2.0; taken to Dan Stuart.
|
Application received | | 6/30/2011 | 6/30/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/30/2011 | | DONE |
Barbara Stitt
|
|
|
|
Intake Approval | | | 6/30/2011 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/30/2011 | | DONE |
Barbara Stitt
|
|
|
|
CDHD Occupancy Approval | 5/14/2012 | 5/14/2012 | | | |
|
|
|
See temp occupancy card signed by Tom Schmalz 2-16-12
|