First Notice | 1/31/2014 | 1/31/2014 | 6/25/2015 | | DONE |
Dave Hannah
|
|
|
This permit finaled on the web by Karen Trusty
|
BLD-Aging Inspection | 1/30/2014 | 1/31/2014 | 1/31/2014 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 1/31/2014 | 1/31/2014 | 1/31/2014 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | PASS |
Dave Hannah
|
|
|
Carrie Phone #: ###-####1
|
Telephone call | | | 7/12/2012 | | DONE |
Tisha Gallop
|
|
|
called Carrie VanHouten at CSDI and left vm to see if can schedule final insp?
|
FIRE-Final Inspection | 6/15/2012 | 6/19/2012 | 6/19/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
FIRE-Final Inspection | 6/14/2012 | 6/15/2012 | 6/15/2012 | A | FAIL |
Forrest France
|
|
|
Post one fire extinguisher at the second level office area, need access for inspection at unit 133, discussed fire code review note items and project attatched fire alarm permit (voided status).
|
BLD-Final | 6/13/2012 | 6/14/2012 | 6/15/2012 | P | PART |
Dave Hannah
|
|
|
carrie Phone #: ###-#### needs a fire life saftey inspection change locks on ada rest room and remove dead bolt on back door ground level
|
BLD-Final | 6/7/2012 | 6/11/2012 | 6/11/2012 | A | NR |
Jim Sly
|
|
|
Carrie Phone #: ###-#### No correction notice on site.....Might be handrail on rear stairway..........inside handrail installed too low. Notified maintenence person and Carrie.
|
Reopen Permit (ISS) | | | 6/7/2012 | | DONE |
Tisha Gallop
|
|
|
Per Dave H. reopen permit, still need inspection for office
|
Letter of compliance/Occupancy | | | 6/4/2012 | | DONE |
Tisha Gallop
|
|
|
|
DOC - Permit Finaled | | | 5/25/2012 | | DONE |
|
|
|
|
Zoning Approval | 5/4/2012 | 5/4/2012 | 5/4/2012 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 2/15/2012 | 2/16/2012 | 2/16/2012 | A | PART |
Dave Hannah
|
|
|
Trent Green Phone #: ###-#### needs to finish office
|
BLD-Conference | 12/15/2011 | 12/15/2011 | 12/16/2011 | P | PART |
Dave Hannah
|
|
|
correction notice issued
|
BLD-Final | 12/1/2011 | 12/2/2011 | 12/5/2011 | P | NR |
Dave Hannah
|
|
|
Trent Phone #: ###-#### office space wrong door hard ware
|
BLD-Final | 11/28/2011 | 11/29/2011 | 11/30/2011 | P | PART |
Dave Hannah
|
|
|
Trent Phone #: ###-#### ok to move into three apartments sill working on ext and office area
|
BLD-Framing/Rough-in | 11/14/2011 | 11/14/2011 | 11/15/2011 | P | PASS |
Dave Hannah
|
|
|
chet Phone #: ###-#### ok to cover int walls
|
BLD-Framing/Rough-in | 10/18/2011 | 10/20/2011 | 10/20/2011 | A | PART |
Dave Hannah
|
|
|
Trent Green Phone #: ###-#### 3 1/2 x16 beams for second floor ok to cover
|
(F) Reprint permit | | | 10/11/2011 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/11/2011 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/10/2011 | | DONE |
Christina Prado
|
|
|
Plan Mod***Received two sets of plans marked AS12-A1, AS12-A2, PR3-A1 & PR3-A2. Also received two copies of structural cacls, handrail beam calcs, Architct supplemental instructions and work changes proposal list. All routed to Sam Z for review
|
Routing - PLAN CHECK | 10/10/2011 | | 10/10/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 10/10/2011 | | DONE |
Sam Zahorka
|
|
|
|
Override - Parcel Holds | | | 10/10/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 7/6/2011 | 7/6/2011 | 8/25/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 8/10/2011 | | 8/25/2011 | | PASS |
Sarah Schafer
|
|
|
ACHD modifications.
|
Routing - PLAN CHECK | 8/25/2011 | | 8/25/2011 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 8/25/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/25/2011 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 8/25/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/25/2011 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 8/23/2011 | | DONE |
Tisha Gallop
|
|
|
received two coipes of ACHD plan review and plan acceptance letters, comments from Architect, and plan sheets A1.1, C1.1; taken to Sam Zahorka
|
Routing - PLAN CHECK | 8/9/2011 | | 8/10/2011 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 8/9/2011 | | PASS |
|
|
|
|
Routing - FIRE | 8/4/2011 | | 8/9/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 7/19/2011 | | 8/4/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | 7/14/2011 | | 8/4/2011 | | PASS |
Steven Webb
|
|
|
Per Steve Webb reference ESC11-00455. ESC plan waiver request is approved according to the ESC Permit Conditions.
|
Routing - Design Review | 7/18/2011 | | 7/19/2011 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 7/6/2011 | | 7/14/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Street Lights | 7/12/2011 | | 7/14/2011 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Sewer Rating | 7/14/2011 | | 7/14/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 7/7/2011 | | 7/12/2011 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 7/12/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of Drainage Narrative, O & M, and three copies of A1.1; put with plans at Brian Murphys desk.
|
Plan resubmittals received | | | 7/12/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of Drainage Narrative, O & M, and three copies of A1.1; put with plans at Brian Murphys desk.
|
Routing - Addressing | 7/6/2011 | | 7/6/2011 | | PASS |
Terry Records
|
|
|
|
Pending Assignment by JCB | 7/5/2011 | | 7/6/2011 | | DONE |
Jason Blais
|
|
|
|
Application received | | 7/1/2011 | 7/5/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/1/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/1/2011 | | DONE |
Tisha Gallop
|
|
|
|