Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD11-01536
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 1160 W MILLER ST
Project NamePIONEER SQUARE APT - BLDG G
Customer Number 
ePlanReviewNo
Description
(PIONEER SQUARE APARTMENTS) Bldg G **10-10-11 - PLAN MODIFICATION TO INCLUDE: STRUCTURAL AND GYPSUM REPAIRS AT THE (3) BEDROOM UNIT LOCATIONS; STRUCTURAL REPAIRS AND MODIFICATIONS AT THE EXTERIOR DECK LOCATIONS AT ALL 1 AND 2 BEDROOM UNITS.** Remodel of existing 2,520 sq. ft., 3 unit, 2 story apartment building and associated site work. Work includes interior and exterior work. The interior work will include: new flooring, plumbing fixtures, appliances, install new battery operated smoke detectors in all bedrooms, and interior finishes in compliance with chapter 8 of the 2009 IBC. The exterior work will include: new exterior siding and brick; new windows, entry doors, new gutters and down spouts, new guardrails; install new through-the-wall air conditioner units; and new roofing. The site will have minor improvements including replacement of the asphalt driveway, parking lot, seal coating, and new striping. All work per the approved plans, attached plan review report, and structural inspectors final approval. This building is NOT fire sprinklered. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  6/4/2012 DONE
DetailsTisha Gallop
DOC - Permit Finaled  5/25/2012 DONE
BLD-Final5/9/20125/10/20125/10/2012APASS
DetailsDave Hannah
Phone #: 2088699111 >> Inspection requested via mobile web by Carrie Van Houten
Zoning Approval5/4/20125/4/20125/4/2012 PASS
DetailsJosh Wilson
BLD-Final3/8/20123/13/20123/14/2012APART
DetailsDave Hannah
Trent Phone #: ###-#### iinside ok but needs plumbing final and zoning final
BLD-Final3/7/20123/8/20123/8/2012ADEFR
DetailsJim Storey
Trent Phone #: ###-#### to dave on tue am lack of permits and sign offs per permit no insp. performed.
(F) Reprint permit  10/11/2011 DONE
CHANGE STATUS TO (ISS)  10/11/2011 DONE
Plan Modification Accepted  10/10/2011 DONE
DetailsChristina Prado
Plan Mod***Received two sets of plans marked AS12-A1, AS12-A2, PR3-A1 & PR3-A2. Also received two copies of structural cacls, handrail beam calcs, Architct supplemental instructions and work changes proposal list. All routed to Sam Z for review
Routing - PLAN CHECK10/10/2011 10/10/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  10/10/2011 DONE
DetailsSam Zahorka
Case Summary (BLD)  10/10/2011 DONE
DetailsSam Zahorka
Case Summary (BLD)  10/10/2011 DONE
DetailsSam Zahorka
Override - Parcel Holds  10/10/2011  
Inspection Record Card- Bld  10/10/2011 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  9/7/2011 DONE
DetailsBarbara Stitt
Plan assigned to (SRZ)7/6/20117/6/20118/25/2011 PASS
DetailsSam Zahorka
Routing - PLANNING8/10/2011 8/25/2011 PASS
DetailsSarah Schafer
ACHD modifications.
Routing - PLAN CHECK8/25/2011 8/25/2011 PASS
DetailsSam Zahorka
Case Summary (BLD)  8/25/2011 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  8/25/2011 DONE
DetailsSam Zahorka
Inspection Record Card- Bld  8/25/2011 DONE
Permit Ready to Issue  8/25/2011 DONE
DetailsChristina Prado
Plan resubmittals received  8/23/2011 DONE
DetailsTisha Gallop
received two coipes of ACHD plan review and plan acceptance letters, comments from Architect, and plan sheets A1.1, C1.1; taken to Sam Zahorka
1st review completed  8/10/2011 PASS
Routing - PLAN CHECK8/10/2011 8/10/2011 PASS
DetailsSam Zahorka
Routing - FIRE8/4/2011 8/10/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - Erosion and Sediment7/14/2011 8/4/2011 PASS
DetailsSteven Webb
Per Steve Webb reference ESC11-00455. ESC plan waiver request is approved according to the ESC Permit Conditions.
Routing - PLAN CHECK7/19/2011 8/4/2011 PASS
DetailsSam Zahorka
Routing - Design Review7/18/2011 7/19/2011 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS7/6/2011 7/14/2011 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating7/14/2011 7/14/2011 PASS
DetailsConnie Baumgartner
Routing PW Street Lights7/12/2011 7/14/2011 PASS
DetailsMike D Hedge
Plan resubmittals received  7/12/2011 DONE
DetailsTisha Gallop
received two copies of Drainage Narrative, O & M, and three copies of A1.1; put with plans at Brian Murphys desk.
Routing PW Drainage7/7/2011 7/12/2011 PASS
DetailsBrian Murphy
Routing - Addressing7/6/2011 7/6/2011 PASS
DetailsTerry Records
Pending Assignment by JCB7/5/2011 7/6/2011 DONE
DetailsJason Blais
Application received 7/1/20117/5/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  7/1/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/1/2011 DONE
DetailsTisha Gallop