First Notice | | 10/7/2011 | 10/20/2011 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 9/27/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 9/9/2011 | 9/12/2011 | 9/12/2011 | A | PASS |
Mike Jordan
|
|
|
tim Phone #: ###-####. All issues have been resolced. Ok for perm occ.
|
BLD-Final | 9/8/2011 | 9/9/2011 | 9/9/2011 | P | FAIL |
Mike Jordan
|
|
|
MIKE Phone #: ###-####. Mount tactile exit sign near front exit, provide miorrors in restroom at coorect mounting heights.
|
FIRE-Final Inspection | 9/6/2011 | 9/7/2011 | 9/7/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Other | 8/22/2011 | 8/23/2011 | 8/23/2011 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Grid ok, pending fire sprinkler.
|
BLD-Energy code compliance | 8/8/2011 | 8/9/2011 | 8/9/2011 | A | PASS |
Mike Jordan
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 8/5/2011 | 8/8/2011 | 8/8/2011 | P | PART |
Mike Jordan
|
|
|
mike Phone #: ###-####. Needs to provide barrier at drinking fountain as per detail on sheet A7.1. ok to insulate and ok to start sheet rocking.
|
Plan assigned to (TLW) | | | 7/20/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 7/5/2011 | | 7/20/2011 | | PASS |
Terry Records
|
|
|
Needs Ste 200 added into GIS system
|
Routing - PLAN CHECK | 7/20/2011 | | 7/20/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/20/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2011 | | DONE |
Christina Prado
|
|
|
Called Bob Camp to give fees due
|
Permit Ready to Issue | | | 7/20/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/20/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PLUMBING | 7/15/2011 | | 7/18/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Plan resubmittals received | | | 7/15/2011 | | DONE |
|
|
|
7-15-11 received 2 copies of sheet P1.1 sent to Tim W
|
1st review completed | | | 7/15/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/12/2011 | | 7/15/2011 | | PEND |
Tim L. Woodard
|
|
|
Resubs came for plumbing review suspended.
|
Routing - PLUMBING | 7/8/2011 | | 7/12/2011 | | FAIL |
Daryl Spivey
|
|
|
1. show plumbing (waste and vent) to service sink.
2. shampoo sinks require vacuum breaker on sink.
3. show where vents go and size VTR.
4. plumbing for clothes washer not shown.
5. Explain waste and drain under water heater.
|
Case Summary (BLD) | | | 7/11/2011 | | DONE |
|
|
|
|
Routing - MECHANICAL | 7/7/2011 | | 7/8/2011 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | | | 7/7/2011 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/5/2011 | | | |
|
|
|
|