Permanent Occupancy | | | 1/17/2013 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 6/27/2012 | 6/28/2012 | 6/28/2012 | P | PASS |
Jim Sly
|
|
|
please call 20min prior for access - -Don Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 6/26/2012 | 6/27/2012 | 6/27/2012 | A | PART |
Mike Jordan
|
|
|
Don-PLease call at least 15 mins prior to inspection Phone #: ###-####. ok for temp occ. Needs blower door test and energy cert.
|
FIRE-Final Inspection | 6/25/2012 | 6/26/2012 | 6/26/2012 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Final Inspection | 6/22/2012 | 6/25/2012 | 6/25/2012 | A | CANC |
Forrest France
|
|
|
Overbooked
|
FIRE-Final Inspection | 6/18/2012 | 6/19/2012 | 6/19/2012 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm and fire sprinkler permits finaled. Also I found four smoke alarms on the second floor that need to be relocated to be more than the required 36" from the restroom door. The fire extinguishers need to have a current inspection tag as well.
|
Zoning Approval | 6/15/2012 | 6/15/2012 | 6/15/2012 | | DONE |
Josh Wilson
|
|
|
|
BLD-Other | 4/18/2012 | 4/19/2012 | 4/19/2012 | P | PASS |
Mike Jordan
|
|
|
don Phone #: ###-####. !hr. walls and penetrations ok.
|
BLD-Other | 4/12/2012 | 4/13/2012 | 4/13/2012 | A | PASS |
Mike Jordan
|
|
|
Fire wall inspection please-Don--the 3 on the south end are the ones to be inspected please Phone #: ###-####. 5/8 type X rock on party walls for the 3 most southern units. screw pattern and all firestopping completed and is ok.
|
BLD-Framing/Rough-in | 4/10/2012 | 4/11/2012 | 4/11/2012 | A | PASS |
Mike Jordan
|
|
|
for cover in garage//Don Phone #: ###-####
|
FIRE-Conference | 4/10/2012 | 4/10/2012 | 4/10/2012 | P | DONE |
Troy Cobbley
|
|
|
I went over possible pendant sprinkler obstructions due to light fixtures with the project superintendant. Also went over fire extinguisher placement and fire dept. access.
|
BLD-Other | 4/4/2012 | 4/5/2012 | 4/5/2012 | A | PASS |
Mike Jordan
|
|
|
fire wall insp//Don Phone #: ###-####
|
BLD-Other | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | PART |
Mike Jordan
|
|
|
Draftstop at party walls from ceiling to underside of roof deck and 5/8" type x rock at same location. work in progress.
|
BLD-Energy code compliance | 4/2/2012 | 4/3/2012 | 4/3/2012 | A | PASS |
Mike Jordan
|
|
|
Don Phone #: ###-####
|
BLD-Framing/Rough-in | 3/28/2012 | 3/30/2012 | 3/30/2012 | A | PART |
Mike Jordan
|
|
|
Don Phone #: ###-####. Ok to insulate. Needs to complete draft stops.
|
BLD-Framing/Rough-in | 3/27/2012 | 3/28/2012 | 3/28/2012 | P | PART |
Mike Jordan
|
|
|
don Phone #: ###-####
|
BLD-Framing/Rough-in | 3/23/2012 | 3/26/2012 | 3/26/2012 | A | PART |
Mike Jordan
|
|
|
Don Phone #: ###-####. Complete fireblocking and putty pads on party walls.
|
BLD-Conference | 12/28/2011 | 12/29/2011 | 12/29/2011 | A | PASS |
Jim Storey
|
|
|
rick Phone #: ###-#### ok to cover exterior.
|
BLD-Conference | 10/28/2011 | 10/31/2011 | 10/31/2011 | A | PASS |
Mike Jordan
|
|
|
rick - 9:00 - floor Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/17/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 7/6/2011 | 7/6/2011 | 10/4/2011 | | PASS |
Sam Zahorka
|
|
|
1st review completed
|
Routing - MECHANICAL | 10/4/2011 | | 10/4/2011 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 10/4/2011 | | 10/4/2011 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2011 | | DONE |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 10/4/2011 | | DONE |
|
|
|
|
Telephone call | | | 10/4/2011 | | DONE |
Christina Prado
|
|
|
Called and gave Randy fees due and advised on GC/RP requirements
|
Permit Ready to Issue | | | 10/4/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - MECHANICAL | 9/26/2011 | | 9/26/2011 | | FAIL |
Troy James
|
|
|
talked to kartchner engineering about corrections that need to be addressed
|
Routing - MECHANICAL | 9/6/2011 | | 9/8/2011 | | FAIL |
Troy James
|
|
|
left message with kartchner engineering at office and cell phone
|
Case Summary (BLD) | | | 9/6/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 8/25/2011 | | 9/6/2011 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 9/2/2011 | | |
Sam Zahorka
|
|
|
Received 1 copy of Plan Review Response letter, 2 copies of sheets A-2.3, A-2.4, A-2.5, A-3.0, A-3.1, A-3.2, A-6.0, M-1, E-1.0 and taken to Sam Zahorka.
|
Routing - FIRE | 8/22/2011 | 8/22/2011 | 8/25/2011 | | PASS |
Scott Arellano
|
|
|
Attached comment to plans.
|
1st review completed | | | 8/25/2011 | | FAIL |
|
|
|
Failed Mech and Plan check.
|
Routing - PLAN CHECK | 7/29/2011 | | 8/22/2011 | | FAIL |
Scott Arellano
|
|
|
|
Route to Impact Fee Review | 7/7/2011 | 7/12/2011 | 8/3/2011 | | PASS |
Cindy M. Gould
|
|
|
reference PRK06-01137
|
Routing - MECHANICAL | 7/29/2011 | | 7/29/2011 | | FAIL |
Troy James
|
|
|
emailed comments to kartchner eng
|
Plan resubmittals received | | | 7/28/2011 | | DONE |
Tisha Gallop
|
|
|
received transmittal two copies of HVAC calcs and two copies of plan sheets of P-1, M-1; taken to Sam Zahoka.
|
Routing - PLANNING | | | 7/20/2011 | | PASS |
Sarah Schafer
|
|
|
DRH05-00402, CUP04-00101 Approved. Planning Director determined we should allow them to complete the buildings per the previous approved plans.
|
Routing - MECHANICAL | 7/12/2011 | | 7/20/2011 | | FAIL |
Troy James
|
|
|
emailed applicant and architect to provide ACCA approved design
|
Routing - PLUMBING | 7/11/2011 | | 7/12/2011 | | PASS |
Daryl Spivey
|
|
|
1. Resize water lines to meet 2003 UPC.
2. Per plans and 2003 UPC.
|
Routing - Erosion and Sediment | 7/7/2011 | | 7/11/2011 | | PASS |
Steven Webb
|
|
|
ESC plan wavier request is approved according to the ESC Permit Conditions. ESC11-00464
|
Routing - PLANNING Land Div | 7/7/2011 | | 7/7/2011 | | PASS |
Dave Abo
|
|
|
Santara Place Condominiums, Units 6-11 of Building B
|
Routing - PUBLIC WORKS | 7/7/2011 | | 7/7/2011 | | PASS |
Beverly Mountain
|
|
|
|
Application received | | 7/6/2011 | 7/6/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
First Notice | | 1/27/2013 | | | |
|
|
|
|