Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD11-01590
StatusFinaled
Name SHARON FEREDAY
Site Address 5816 W OVERLAND RD
Project NameBIG BUN
Customer Number 
ePlanReviewNo
Description
BIG BUN - **10-24-11 PLAN MODIFICATION TO INCLUDE INTERIOR LIGHTING, CEILING FANS, AND INFRARED RADIANT HEATING SYSTEM PER THE APPROVED PLANS.** - To construct a new roof over an existing 580 sqft outdoor patio structure, constructed under permit BLD10-00853, located adjacent to an existing Drive-thru restaurant. Work to include: to perform structural modifications to the existing structure to allow the new roof per engineering, construct the new roof per plans including new 26 GA Metal roof system, New Diabond panels, painting the existing fascia, and all other work per the approved plans, Engineering, structural inspectors final approval, and all other reviewing agencies approvals. No new lighting, plumbing, or mechanical work is proposed or allowed under this permit. The existing envelope is not being affected by this permit. This building is NOT fire sprinklered. **SRZ** DRH10-00058, CUP10-00853
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 12/18/201112/8/2011 DONE
DetailsChristina Prado
done when occupancy was picked up
Permanent Occupancy  12/8/2011 DONE
DetailsChristina Prado
First Notice11/23/201111/23/201112/5/2011 DONE
DetailsTom Arcoraci
BLD-Final11/22/201111/23/201111/23/2011APASS
DetailsTom Arcoraci
We are ready. Andrea signed off for P&Z >> Inspection requested via web by Jeff Ware
DOC - Permit Finaled11/23/201111/23/201111/23/2011PPASS
DetailsTom Arcoraci
Zoning Approval11/22/201111/22/201111/22/2011 DONE
DetailsAndrea Tuning
BLD-Final11/21/201111/21/201111/21/2011PNR
DetailsTom Arcoraci
>> Inspection requested via web by Jeff Ware
FIRE-Final Inspection11/17/201111/18/201111/18/2011APASS
DetailsTroy Cobbley
life safety passed
CHANGE STATUS TO (ISS)  11/15/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  11/15/2011 DONE
DetailsBarbara Stitt
(F) Reprint permit  11/15/2011 DONE
DetailsBarbara Stitt
Print Occupancy Form  11/14/2011 DONE
Telephone call  11/14/2011 DONE
DetailsChristina Prado
Called and left message for Bill Matter giving fees due
Permit Ready to Issue  11/14/2011 DONE
DetailsChristina Prado
Plan assigned to (SRZ)10/17/201110/17/201111/10/2011 PASS
DetailsSam Zahorka
!st Review completed. Corections Requested.
Routing - PLAN CHECK10/24/2011 11/10/2011 PASS
DetailsSam Zahorka
Plan Modification
Case Summary (BLD)  11/10/2011 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  11/10/2011 DONE
DetailsSam Zahorka
Telephone call  10/24/2011 DONE
DetailsSam Zahorka
Called the architect and spoke with Corey. Requested plan corrections for the light reduction controls and the radiant heating system controls. Emailed plan review report.
Routing - PLAN CHECK10/17/2011 10/24/2011 FAIL
DetailsSam Zahorka
Plan Modification - Need information for the controling devices for the radiant heating system and the required light reduction controls per the 2009 IECC.
FIRE-Conference10/17/201110/17/201110/17/2011PDONE
DetailsForrest France
Troy, can you please call me when you get on site. ###-#### Phone #: ###-#### >> Inspection requested via web by Jeff Ware Regarding plan modifications to electrical and mechanical work.
Plan Modification Accepted  10/17/2011  
Plan modification excepted for BLD11-01590 for clarification drawing showing lighting and ceiling fan layout as well as infrared heater location. Sheet(1) is the only sheet affected.
BLD-Framing/Rough-in10/12/201110/13/201110/13/2011APASS
DetailsTom Arcoraci
>> Inspection requested via web by Jeff Ware
BLD-Framing/Rough-in10/4/201110/4/201110/4/2011PPASS
DetailsTom Arcoraci
BLD-Conference9/22/20119/23/20119/23/2011APASS
DetailsTom Arcoraci
>> Inspection requested via web by Jeff Ware
Meeting  9/22/2011 DONE
DetailsTisha Gallop
received GC form from Jeff Ware/Bearcat Builders to take over as GC for the project, scanned and attached form to documents
Issue PAID IN FULL permit  8/23/2011 DONE
DetailsChristina Prado
Plan assigned to (SRZ)7/11/20117/11/20118/19/2011 PASS
DetailsSam Zahorka
Routing - PLAN CHECK8/17/2011 8/19/2011 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  8/19/2011 DONE
DetailsSam Zahorka
Case Summary (BLD)  8/19/2011 DONE
DetailsSam Zahorka
Print Occupancy Form  8/19/2011 DONE
Permit Ready to Issue  8/19/2011 DONE
DetailsBarbara Stitt
Telephone call  8/19/2011 DONE
DetailsBarbara Stitt
Called Liz and told her that permit is ready & fees due on 8-19-11 @ 4:45pm//BAS
1st review completed  8/17/2011 PASS
Routing - FIRE8/11/2011 8/17/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Case Summary (BLD)  8/11/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK7/11/2011 8/11/2011 PASS
DetailsSam Zahorka
Sam Zahorka
Routing - PLANNING7/11/2011 7/11/2011 PASS
DetailsAndrea Tuning
CZC11-00162-Andrea Tuning
Application received 7/8/20117/8/2011 DONE
DetailsBarbara Stitt
Plans ACCEPTED BY PLAN TECH  7/8/2011 DONE
DetailsBarbara Stitt
Intake Approval  7/8/2011 PASS
DetailsTim L. Woodard
Recd Pcfee & Taken To Pln CK  7/8/2011 DONE
DetailsBarbara Stitt