Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-01604
StatusFinaled
Name BONINE JON L
Site Address 4145 N EDELWEISS ST
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the remodel of the 88s.f. addition and reconfiguration of the kitchen area of an existing 3632s.f. single family dwelling. N / A ESC due to the small scope of work. Separate electrical, plumbing and mechanical permits are required. R-1C ok per David Moser. All per the approved plans as marked and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/25/20124/27/20124/29/2012APASS
DetailsJim Sly
JON Before 11 am Phone #: ###-####
DOC - Permit Finaled4/29/20124/29/20124/29/2012PPASS
DetailsJim Sly
BLD-Final4/25/20124/25/20124/25/2012ACANC
DetailsJim Sly
John .......Re-sched....
BLD-Final4/24/20124/24/20124/25/2012PCANC
DetailsJim Sly
John-Please call at least 30 mins prior to inspection--at late as possible please Phone #: ###-####
BLD-Conference2/8/20122/15/20122/16/2012ADONE
DetailsJim Sly
Jon Phone #: ###-####
BLD-Conference10/19/201110/21/201110/21/2011ADONE
DetailsJim Sly
jon - as early as possible - please call 1/2 hr prior Phone #: ###-####
BLD-Framing/Rough-in8/22/20118/23/20118/23/2011APASS
DetailsJim Sly
jon Phone #: ###-####
F and E OK
BLD-Framing/Rough-in8/8/20118/8/20118/8/2011PPART
DetailsJim Sly
roof framing//Bruce Young Phone #: ###-#### OK to rock select part of ceiling.
BLD-Conference8/2/20118/2/20118/2/2011PDONE
DetailsJim Sly
JON Phone #: ###-####
BLD-Footing7/18/20117/18/20117/18/2011PPASS
DetailsMike Jordan
early as possible//Tim Phone #: ###-####
Routing Walk-In (Zoning)7/11/20117/11/20117/11/2011PPASS
DetailsDavid Moser
Routing Walk-In (BLD)7/11/20117/11/20117/11/2011PDONE
DetailsPerry Paine
Plan assigned to (PEP)7/11/20117/11/20117/11/2011 PASS
DetailsPerry Paine
1st review completed  7/11/2011 DONE
Received Certificate of Value  7/11/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/11/2011 DONE
Permit Ready to Issue  7/11/2011  
Issue PAID IN FULL permit  7/11/2011 DONE
Case Summary (BLD)  7/11/2011  
Inspection Record Card- Bld  7/11/2011  
Application received 7/11/2011