BLD-Final | 3/7/2012 | 3/7/2012 | 3/7/2012 | P | PASS |
Tony Young
|
|
|
Randy-PLease call at least 15 mins prior to inspection Phone #: ###-####
|
DOC - Permit Finaled | 3/7/2012 | 3/7/2012 | 3/7/2012 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Framing/Rough-in | 10/6/2011 | 10/7/2011 | 10/7/2011 | A | PASS |
Tony Young
|
|
|
randy - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, will need pellet stove final prior to building final
|
BLD-Framing/Rough-in | 10/6/2011 | 10/6/2011 | 10/6/2011 | P | CANC |
Tony Young
|
|
|
randy - please call 1/2 hr prior so he can meet you there Phone #: ###-####
|
BLD-Framing/Rough-in | 10/6/2011 | 10/6/2011 | 10/6/2011 | P | CANC |
Tony Young
|
|
|
randy - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, meet @ 1pm
|
BLD-Framing/Rough-in | 10/5/2011 | 10/6/2011 | 10/6/2011 | A | PART |
Tony Young
|
|
|
randy - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, ok to insulate,,, needs mechanical inspection
|
BLD-Framing/Rough-in | 9/22/2011 | 9/23/2011 | 9/23/2011 | A | NR |
Jim Sly
|
|
|
Please call 30min prior---Randy Phone #: ###-#### Need all trade rough-in approvals.
|
BLD-Footing | 8/17/2011 | 8/17/2011 | 8/17/2011 | P | PART |
Mike Jordan
|
|
|
Tim Phone #: ###-####. Footing ok, possible property ilne issue, setback can not be accurately determined. Assumed propertyline puts exterior wall inside the required 5 ft. Contractor to determine were property line is.
|
OVERRIDE | | | 7/13/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/13/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 7/13/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 7/12/2011 | 7/12/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (Zoning) | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Todd Tucker
|
|
|
|
Routing Walk-In (BLD) | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/12/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2011 | | |
|
|
|
|
1st review completed | | | 7/12/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2011 | | DONE |
|
|
|
|