BLD-Aging Inspection | 2/5/2014 | 2/6/2014 | 2/6/2014 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 2/6/2014 | 2/6/2014 | 2/6/2014 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/6/2014 | 2/6/2014 | 2/6/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/6/2011 | 9/7/2011 | 9/7/2011 | P | PART |
Dave Hannah
|
|
|
BOB-PLease call at least 30 mins prior to inspection Phone #: ###-#### ok to final after elec finals
|
BLD-Framing/Rough-in | 8/24/2011 | 8/25/2011 | 8/25/2011 | P | PASS |
Dave Hannah
|
|
|
bob Phone #: ###-####
|
BLD-Footing | 8/1/2011 | 8/2/2011 | 8/2/2011 | A | PASS |
Dave Hannah
|
|
|
Bob Phone #: ###-####
|
Routing Walk-In (Zoning) | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | PASS |
Todd Tucker
|
|
|
Garage must be 500 sq. ft. or less to use the proposed reduced setbacks. Driveway must be paved.
|
Routing Walk-In (BLD) | 7/12/2011 | 7/12/2011 | 7/12/2011 | P | DONE |
Perry Paine
|
|
|
|
Plan assigned to (PEP) | 7/12/2011 | 7/12/2011 | 7/12/2011 | | PASS |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 7/12/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2011 | | |
|
|
|
|
1st review completed | | | 7/12/2011 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/12/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/12/2011 | | DONE |
|
|
|
|
Application received | | 7/12/2011 | | | |
|
|
|
|