Third Notice | | 12/21/2011 | 12/13/2011 | | DONE |
|
|
|
|
Third Notice | | 11/26/2011 | 12/7/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 11/17/2011 | 11/21/2011 | | DONE |
|
|
|
|
First Notice | | 10/21/2011 | 11/7/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/11/2011 | | DONE |
|
|
|
|
Zoning Approval | 10/7/2011 | 10/7/2011 | 10/7/2011 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Final | 9/22/2011 | 9/30/2011 | 9/30/2011 | P | PASS |
Jim Storey
|
|
|
Please call 1hr prior for access----Mandy Phone #: ###-####/// Exhaust system removed from plans 8/10-11 by Tim W. No MEC needed///cdp
|
FIRE-Final Inspection | 9/28/2011 | 9/30/2011 | 9/30/2011 | A | PASS |
Forrest France
|
|
|
C/N items finished. Fire life safety inspection passed.
|
FIRE-Final Inspection | 9/22/2011 | 9/27/2011 | 9/28/2011 | P | FAIL |
Forrest France
|
|
|
Correction items include; install approved hardware at both restroom doors, provide current certification tags on the PFE's at the east building, project related fire alarm permit final pending. Remainder of inspection items passed.
|
FIRE-Final Inspection | 9/26/2011 | 9/26/2011 | 9/26/2011 | P | NR |
Forrest France
|
|
|
Final pending project related fire alarm.
|
Plan assigned to (TLW) | 8/1/2011 | | 8/10/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/1/2011 | | 8/10/2011 | | PASS |
Tim L. Woodard
|
|
|
approved plan modification. Per report. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/10/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 8/10/2011 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/10/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/10/2011 | | DONE |
Barbara Stitt
|
|
|
Called and told Pat McKeegan that permit is ready & fees due on 8-10-11 @ 1:40PM//BAS
|
CHANGE STATUS TO (ISS) | | | 8/10/2011 | | DONE |
Barbara Stitt
|
|
|
issue plan mod 8-10-11
|
(F) Reprint permit | | | 8/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
FIRE-Conference | 8/2/2011 | 8/2/2011 | 8/2/2011 | A | DONE |
Forrest France
|
|
|
Conversation with owner and architect regarding fire code review notes, key notes per plan, fire alarm and sprinkler work, correction items, etc.
|
BLD-Final | 7/29/2011 | 8/1/2011 | 8/2/2011 | P | CANC |
Jim Storey
|
|
|
Mandy Phone #: ###-####
|
FIRE-Final Inspection | 7/29/2011 | 8/1/2011 | 8/1/2011 | A | FAIL |
Forrest France
|
|
|
Project is not in condition for fire life safety final. See fire code review notes # 3, 5 and 20. Reference also stamped plan set sheet A.1.1 keynote items 1, 7, 8, and 17. Separate fire alarm and sprinkler permits will be necessary to complete modifications. Noted overdue certifications for the fire extinguishers, door hardware is not compliant, missing exit signs and EM lights per plans, etc.
|
Plan Modification Accepted | | | 8/1/2011 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld11-01627 (Boise Police Tactical) to delete wall & door at electrical panels, delete ventilation system; submitted on plan sheet A1.1 and revised cert of value; routed to Tim Woodard
|
Routing - PLAN CHECK | 7/27/2011 | | 7/28/2011 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/28/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 7/28/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/28/2011 | | |
|
|
|
|
Telephone call | | | 7/28/2011 | | DONE |
|
|
|
7-28-11 called Patrick and sent email fee amt and that we need GC ///dld
|
Issue PAID IN FULL permit | | | 7/28/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 7/13/2011 | | 7/28/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | 7/25/2011 | | 7/27/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans. A seperate fire sprinkler permit will be required.
|
1st review completed | | | 7/27/2011 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 7/14/2011 | | 7/25/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with redlines and report. TLW
|
Routing - Design Review | 7/14/2011 | | 7/14/2011 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - CZC11-00142
|
Pending Assignment by JCB | 7/12/2011 | | 7/13/2011 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/12/2011 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 7/12/2011 | | PASS |
Dan Stuart
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/12/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/12/2011 | | | |
|
|
|
|