Permit Information
Permit NumberBLD11-01649
StatusFinaled
Name DERRICK HERBST
Site Address 409 S COLE RD
Project NameHarrison Plaza Hotel
Customer Number 
ePlanReviewNo
Description
(HARRISON PLAZA SUITE HOTEL) Minor remodel to create openings in the exterior wall in suites 307,311,306, 205, 304, and 308 to install new PTAC units. Work to include: construction of openings in the existing wall (refer to attached engineering), installation of new PTAC units, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/13/2013 DONE
Second Notice 12/15/201112/22/2011 DONE
First Notice11/29/201111/29/201112/5/2011 DONE
DetailsMike Jordan
BLD-Final11/28/201111/29/201111/29/2011APASS
DetailsMike Jordan
derick Phone #: ###-####
DOC - Permit Finaled11/29/201111/29/201111/29/2011PPASS
DetailsMike Jordan
BLD-Final11/22/201111/23/201111/23/2011PCANC
DetailsMike Jordan
Please call prior to inspection--After 3:30 please--Derrick Phone #: ###-####
FIRE-Final Inspection11/22/201111/22/201111/22/2011PPASS
DetailsTroy Cobbley
life safety passed.
BLD-Framing/Rough-in9/8/20119/9/20119/9/2011APASS
DetailsMike Jordan
Derek Phone #: ###-####
(F) Reprint permit  8/11/2011 DONE
Permit Ready to Issue  8/1/2011 DONE
Issue PAID IN FULL permit  8/1/2011 DONE
Plan assigned to (TLW)7/21/2011 7/29/2011 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  7/29/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  7/29/2011 DONE
DetailsTim L. Woodard
Inspection Record Card- Bld  7/29/2011 DONE
Routing - PLAN CHECK7/21/2011 7/28/2011 PASS
DetailsTim L. Woodard
1st review completed  7/28/2011 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  7/21/2011 DONE
7-14-11 ok per Tim Woodard to take in as a level 1
Recd Pcfee & Taken To Pln CK  7/21/2011 DONE
Intake Approval  7/21/2011 PASS
DetailsTim L. Woodard
Intake Approval  7/14/2011 FAIL
DetailsTim L. Woodard
Need check submitted before routing.
Application received 7/14/2011