BLD-Aging Inspection | 2/5/2014 | 2/7/2014 | 2/10/2014 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 2/10/2014 | 2/10/2014 | 2/10/2014 | P | PASS |
Dave Hannah
|
|
|
|
Routing PW Grading-Hillside | 7/2/2013 | | 7/2/2013 | | PASS |
Jason C. Taylor
|
|
|
Recieved Civil Engineers approval for project grading and drainage. Recieved Structural Engineers approval for retaining walls. Permit ia approved for final occupancy from Public Works. Jason talyor ###-####.
|
BLD-Final | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | PEND |
Dave Hannah
|
|
|
fred Phone #: ###-#### ok to final after hillside signoff
|
BLD-Final | 10/26/2012 | 10/29/2012 | 10/30/2012 | A | PART |
Dave Hannah
|
|
|
final on the back patio and garage//Fred Phone #: ###-#### ok to use garage but still needs to finish other parts of permit
|
BLD-Foundation | 10/17/2012 | 10/18/2012 | 10/18/2012 | P | PASS |
Dave Hannah
|
|
|
requrest late//Foundation wall//Fred Phone #: ###-####
|
BLD-Footing | 10/11/2012 | 10/12/2012 | 10/12/2012 | A | PASS |
Dave Hannah
|
|
|
Early am please-Fred Phone #: ###-#### second retainning wall
|
BLD-Foundation | 9/21/2012 | 9/24/2012 | 9/24/2012 | A | PASS |
Dave Hannah
|
|
|
Rebar for retaining wall - Fred Phone #: ###-####
|
BLD-Footing | 9/18/2012 | 9/19/2012 | 9/19/2012 | P | PASS |
Dave Hannah
|
|
|
pouring at 2:30 - Fred Phone #: ###-#### retainning wall ftg first level
|
BLD-Framing/Rough-in | 9/17/2012 | 9/18/2012 | 9/18/2012 | A | PASS |
Dave Hannah
|
|
|
fred Phone #: ###-#### light cans in soffits ok to cover
|
PubWorks Subgrade Approval | 9/18/2012 | 9/18/2012 | 9/18/2012 | | DONE |
Terry Records
|
|
|
Footing subgrade for lower retaining wall approved by the geotechnical engineer
|
BLD-Framing/Rough-in | 9/14/2012 | 9/14/2012 | 9/14/2012 | P | PASS |
Dave Hannah
|
|
|
fred Phone #: ###-####
|
OVERRIDE | | | 9/4/2012 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/4/2012 | 9/4/2012 | 9/4/2012 | A | PASS |
Perry Paine
|
|
|
|
Permit Ready to Issue | | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/4/2012 | | DONE |
Tisha Gallop
|
|
|
plan modification approved and paid
|
Routing Walk-In (Zoning) | 9/4/2012 | | 9/4/2012 | A | PASS |
|
|
|
Approved per CFH11-12
|
Routing Walk-In (Zoning) | 8/24/2012 | 8/24/2012 | 8/29/2012 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/29/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 8/29/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 8/24/2012 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/24/2012 | | DONE |
|
|
|
|
BLD-Foundation | 7/27/2012 | 7/30/2012 | 7/30/2012 | A | PASS |
Dave Hannah
|
|
|
Fred Phone #: ###-####
|
BLD-Footing | 7/26/2012 | 7/27/2012 | 7/30/2012 | P | PASS |
Dave Hannah
|
|
|
FRED Phone #: ###-####
|
OVERRIDE | | | 7/16/2012 | | |
|
|
|
|
Routing Walk-In (Zoning) | 7/16/2012 | 7/16/2012 | 7/16/2012 | A | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 7/16/2012 | 7/16/2012 | 7/16/2012 | A | DONE |
Colleen T Carroll
|
|
|
|
Routing Walk-In (PW Hillside) | 7/16/2012 | 7/16/2012 | 7/16/2012 | A | PASS |
Colleen T Carroll
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspections.
|
Case Summary (BLD) | | | 7/16/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 7/16/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/16/2012 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/16/2012 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/16/2012 | | DONE |
|
|
|
|
BLD-Other | 3/16/2012 | 3/16/2012 | 3/20/2012 | P | PART |
Dave Hannah
|
|
|
fred please call for access ( dogs can get out) Phone #: ###-#### fire treated plywood on soffits and ceiling over pool ok to cover
|
BLD-Energy code compliance | 2/22/2012 | 2/22/2012 | 2/23/2012 | P | PASS |
Dave Hannah
|
|
|
Fred-Please call prior to inspection for access Phone #: ###-#### pool area ok to cover
|
BLD-Conference | 2/16/2012 | 2/16/2012 | 2/21/2012 | A | PASS |
Dave Hannah
|
|
|
Fred Sleight ###-####
|
BLD-Other | 2/16/2012 | 2/17/2012 | 2/17/2012 | A | PASS |
Tom Arcoraci
|
|
|
fred - around 10:30 or 11 - fire rated materal insp Phone #: ###-####
|
BLD-Framing/Rough-in | 2/8/2012 | 2/8/2012 | 2/9/2012 | P | PART |
Dave Hannah
|
|
|
Fred-Please call for access information Phone #: ###-#### ok to insulate walls around ext lap pool and roof
|
BLD-Other | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | PASS |
Jim Storey
|
|
|
fred - retaining wall - late afternoon please Phone #: ###-####
|
BLD-Footing | 11/8/2011 | 11/8/2011 | 11/8/2011 | A | PASS |
Dave Hannah
|
|
|
Retaining wall pour at noon Brad @ ###-####
|
PubWorks Subgrade Approval | 10/28/2011 | 10/28/2011 | 10/28/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade for pump house approved by the geotechnical engineer.
|
CHANGE STATUS TO (ISS) | | | 10/26/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (PW Hillside) | 10/25/2011 | 10/25/2011 | 10/25/2011 | A | PASS |
Carl D Madsen
|
|
|
Footing subgrade for new pool equipment house in NW corner of lot must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
|
Case Summary (BLD) | | | 10/25/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Foundation | 8/25/2011 | 8/29/2011 | 8/29/2011 | P | PASS |
Dave Hannah
|
|
|
ian Phone #: ###-####
|
BLD-Footing | 8/25/2011 | 8/26/2011 | 8/26/2011 | A | PASS |
Dave Hannah
|
|
|
ian Phone #: ###-####
|
PubWorks Subgrade Approval | 8/26/2011 | 8/26/2011 | 8/26/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade for pool approved
|
BLD-Conference | 8/5/2011 | 8/8/2011 | 8/8/2011 | A | PASS |
Dave Hannah
|
|
|
fred - please call 1/2 hr prior Phone #: ###-#### talked about wui code
|
BLD-Conference | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | CANC |
Tony Young
|
|
|
fred - please call 1/2 hr prior Phone #: ###-####,, wanted to see the normal inspector,, 425
|
Inspection Record Card- Bld | | | 8/3/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/3/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/3/2011 | | DONE |
|
|
|
8-3-11 called Fred permi ready and fee given, Also need waiver request signed.
|
Issue PAID IN FULL permit | | | 8/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (PEP) | 8/2/2011 | 8/2/2011 | 8/2/2011 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 7/29/2011 | 7/29/2011 | 8/2/2011 | A | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 8/2/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/2/2011 | | |
|
|
|
|
1st review completed | | | 8/2/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/2/2011 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 7/22/2011 | 7/22/2011 | 7/29/2011 | P | DONE |
Christina Prado
|
|
|
|
Meeting | | | 7/29/2011 | | DONE |
|
|
|
Met with architect,reveived letter of request to the fire marshal for wui alternative.
|
Routing Walk-In (PW Hillside) | 7/15/2011 | 7/15/2011 | 7/15/2011 | P | PASS |
Colleen T Carroll
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
|
Routing Walk-In (Zoning) | 7/15/2011 | 7/15/2011 | 7/15/2011 | P | PASS |
David Moser
|
|
|
|
Routing Walk-In (BLD) | 7/15/2011 | 7/15/2011 | 7/15/2011 | P | FAIL |
Perry Paine
|
|
|
|
PubWorks Subgrade Approval | 7/24/2012 | 7/24/2012 | | | |
|
|
|
Subgrade is approved for five column pads located on the south side of the residence.
|
Application received | | 7/15/2011 | | | |
|
|
|
|