Permit Information
Permit NumberBLD11-01676
StatusFinaled
Name VAN AUKER CONSTRUCTION
Site Address 601 S 9TH ST
Project NameSAGE CHARTER SCHOOL
Customer Number 
ePlanReviewNo
Description
(SAGE INTERNATIONAL CHARTER SCHOOL)( ***GREEN TAG***) Remodel changing occupancy from a business use to an educational use - school for 6th through 9th grade in an existing three story 22,046 sq. ft. building per approved plans. Total occupant load of this building (staff and students) cannot exceed 250 persons without a full seismic analysis and any upgrade work needed is completed. NOTE: This building is fully fire sprinklered for for additional story increase and fire area > 12,000 s.f., "E" occ.Work includes select interior demolition on the 1st floor under separate permit BLD11-01736. New work includes remodel of the first floor to create classrooms; new fully accessible unisex restroom, existing restroom lavs and HI-LO drinking fountain; modify all door hardware to comply with accessibility by adding lever hardware. Existing required exits have panic hardware. There is an approved alternate of a designated maximum occupant load of 250 staff and students. Max. occupant load sign (250) to be posted at main entry/exit on first floor. door hardware, landings, handrails, stair surfaces are to comply with current code for the new occupancy use; electrical, mechanical, plumbing, sprinkler and alarm system work; and interior millwork and finishes per the reviewed plans. drs Planning & Zoning approval done under DRH11-00055. 11-30-11 FINAL CERT OF VALUE PER GC $ 96,098.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 12/16/201112/20/2011 DONE
DetailsChristina Prado
Done 11/30 by DLD
Print Occupancy Form  12/6/2011 DONE
Permanent Occupancy  12/6/2011 DONE
DetailsTisha Gallop
BLD-Final11/28/201111/29/201111/29/2011APASS
DetailsDave Hannah
request 10am//Ron Phone #: ###-#### ok for perm occ
BLD-Aging Inspection11/23/201111/23/201111/28/2011 PASS
DetailsDave Hannah
BLD-Conference9/23/20119/23/20119/26/2011PPASS
DetailsDave Hannah
walked project with cont and owner
Temporary Occupancy UNPAID FEE  9/23/2011 DONE
DetailsChristina Prado
BLD-Final9/21/20119/22/20119/22/2011PPART
DetailsDave Hannah
Bruce Phone #: ###-#### ok for temp occ needs a letter to Jason about not using second floor for now and getting permits later for second floor and stair remodel everything on first floor is ok
FIRE-Final Inspection9/22/20119/22/20119/22/2011PPASS
DetailsForrest France
Noted C/N items verified for completion. Fire life safety finaled.
FIRE-Final Inspection9/21/20119/22/20119/22/2011APART
DetailsForrest France
Items to be finished prior to final include; max occupant sign per review notes, knox box installation, signage at the riser room door, current inspection tag on the fire riser, provide approved hardware at three exit doors from hall 105 as discussed and per approved plans and review notes.
FIRE-Conference9/21/20119/21/20119/21/2011ADONE
DetailsForrest France
Regarding fire life safety conditions for occupancy approval.
BLD-Framing/Rough-in9/15/20119/16/20119/16/2011APASS
DetailsDave Hannah
bruce - after 10:00 please - call 1/2 hr prior Phone #: ###-####
BLD-Framing/Rough-in9/1/20119/1/20119/2/2011PPART
DetailsDave Hannah
ceiling gride ok most of the rooms are old grid with new tiles and lights checked every thing on first floor only found two lights that they missed wires on they will fix them. I will ckeck them on inspection of fire wall around stirs
BLD-Framing/Rough-in8/11/20118/11/20118/11/2011PPASS
DetailsMike Jordan
Bruce Phone #: ###-####. Steel stud interior framed infill walls on 1st. floor. ok.
Routing - Design Review8/4/2011 8/4/2011 PASS
DetailsMatthew A Halitsky
Print Occupancy Form  8/4/2011 DONE
Permit Ready to Issue  8/4/2011 DONE
DetailsTisha Gallop
Telephone call  8/4/2011 DONE
DetailsTisha Gallop
called Cornel Larson and Ron Van Auker Jr. and left voice messages at both places that permit is ready, fees, and need ACHD.
Issue PAID IN FULL permit  8/4/2011 DONE
DetailsTisha Gallop
Plan resubmittals received  8/3/2011 DONE
DetailsTisha Gallop
received response and two copies of plan sheets A-0.1, A-1, A-2, A-3, E-2.1; taken to Dan Stuart
PLANS/APPL TAKEN TO FRONT DESK  8/3/2011 PASS
Approved with notes and attachments.
Plan assigned to (DRS)7/18/2011 8/3/2011 PASS
DetailsDan Stuart
Routing - PLAN CHECK8/1/2011 8/3/2011 PASS
DetailsDan Stuart
Resubmittals inserted into plans. Further resubmittals not required. Routing to permit desk to issue.
Route to Impact Fee Review7/26/20117/29/20118/2/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Telephone call  8/2/2011 DONE
Talked with Dawna Jenkins to review her findings at the job site and proposed methods of providing compliance with code. She will have plans resubmitted on thursday or Friday. I told her I would be out of town from 8/4 thru 8/15 so if she could have thm in by late tomorrow I will stay and process resubmittals to get the plans up front before I leave.
Routing - FIRE7/26/20117/26/20118/1/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans.
1st review completed  8/1/2011 FAIL
Failed Design Review and Plan Check
Plan resubmittals requested  7/26/2011 DONE
Copy of plan review e-mailed to architect.
Override - Parcel Holds  7/26/2011  
Routing - PLAN CHECK7/19/2011 7/26/2011 FAIL
DetailsDan Stuart
Resubmittals required. copy of plan review comments e-mailed to architect and to Angela Brosious, Project manager.Routing to fire code analyst for review.
Routing PW Sewer Rating7/18/2011 7/19/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS7/18/2011 7/19/2011 PASS
DetailsBeverly Mountain
Routing - Design Review7/19/2011 7/19/2011 FAIL
DetailsMatthew A Halitsky
A Certificate of Appropriateness is required for any window/door replacement on the exterior.
Application received 7/18/20117/18/2011 DONE
DetailsTisha Gallop
Intake Approval  7/18/2011 PASS
DetailsSam Zahorka
ACHD approval for no impact fees will be provided prior to issuance. ESC permit and plan waiver not provided but, Project Management will work with Steve Web on requirement specifics. SRZ
Plans ACCEPTED BY PLAN TECH  7/18/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  7/18/2011 DONE
DetailsTisha Gallop
Pending Assignment by JCB7/18/2011 7/18/2011 DONE
DetailsJason Blais
Telephone call  7/18/2011 DONE
DetailsAngela Brosious
Called and discussed with Steve Webb; no ESC permit needed.
Telephone call  7/18/2011 DONE
DetailsJason Blais
Talked with Dawna Jenkins of Larson Architects. She has submitted documents to ACHD for evaluation of any impact fees. A letter from ACHD will be provided to our Permit Counter prior to permit issuance.
Routing - Addressing7/18/2011 7/18/2011 PASS
DetailsTerry Records