Second Notice | | 10/16/2011 | 10/7/2011 | | DONE |
|
|
|
|
Third Notice | | 10/12/2011 | 10/7/2011 | | DONE |
|
|
|
|
First Notice | | 9/25/2011 | 10/6/2011 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 9/15/2011 | | |
Barbara Stitt
|
|
|
|
BLD-Final | 9/12/2011 | 9/14/2011 | 9/14/2011 | A | PASS |
Jim Sly
|
|
|
Bill ###-#### (told him Fire needed to sign off first, he said would call you) OK for Perm Occ.
|
FIRE-Final Inspection | 9/13/2011 | 9/14/2011 | 9/14/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 9/12/2011 | 9/13/2011 | 9/13/2011 | A | CANC |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled.
|
BLD-Final | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | NR |
Jim Sly
|
|
|
corey Phone #: ###-####
|
FIRE-Final Inspection | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | NR |
Forrest France
|
|
|
Fire life safety final pending project related fire alarm permit final. Noted common restrooms are not finished. Remainder of life safety items including exit signs/EM lights, fire extinguishers, building address, and door hardware appear acceptable.
|
FIRE-Final Inspection | 9/2/2011 | 9/7/2011 | 9/7/2011 | A | FAIL |
Troy Cobbley
|
|
|
This project is not ready for a final inspection. Neither the project related fire alarm or fire sprinkler permits are ready for final.
|
BLD-Final | 9/1/2011 | 9/7/2011 | 9/7/2011 | P | NR |
Jim Sly
|
|
|
bill Phone #: ###-#### Need fire final.
|
FIRE-Final Inspection | 9/1/2011 | 9/2/2011 | 9/2/2011 | A | CANC |
Troy Cobbley
|
|
|
To be canceled until next wednesday per bill.
|
FIRE-Conference | 8/30/2011 | 8/30/2011 | 8/30/2011 | P | DONE |
Troy Cobbley
|
|
|
Went over re-arranging the exit sign layout from the rear exit corridor with Bill
|
BLD-Framing/Rough-in | 8/4/2011 | 8/8/2011 | 8/8/2011 | A | PASS |
Jim Sly
|
|
|
Bill Phone #: ###-####
|
FIRE-Conference | 8/4/2011 | 8/8/2011 | 8/8/2011 | A | DONE |
Troy Cobbley
|
|
|
Bill and I went over required life safety requirements including the new second exit at the restroom location.
|
Print Occupancy Form | | | 7/27/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/27/2011 | | DONE |
Christina Prado
|
|
|
Called Bill Matter--gave fees due and advised GC/RCE needed
|
Permit Ready to Issue | | | 7/27/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 7/27/2011 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 7/19/2011 | | 7/26/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plan assigned to (TLW) | 7/19/2011 | | 7/26/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | | | 7/26/2011 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
Case Summary (BLD) | | | 7/26/2011 | | DONE |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/26/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/26/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Addressing | 7/19/2011 | | 7/19/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PUBLIC WORKS | 7/19/2011 | | 7/19/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/2011 | | DONE |
|
|
|
7-18-11 ok per Tim Woodard to take in as a level 2
|
Routing PW Sewer Rating | 7/19/2011 | | 7/19/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Intake Approval | | | 7/18/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Application received | | 7/18/2011 | | | |
|
|
|
|