Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-01696
StatusFinaled
Name ESI
Site Address 455 S BROADWAY AVE
Project NameWalgreen's
Customer Number 
ePlanReviewYes
Description
Walgreens Store - To construct a new 13,900 square foot, one story, wood framed retail drug store with pharmacy with drive-thru window, one hour photo processing, storage area and restrooms. The building will be constructed of exterior masonry walls and steel structural frame. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/10/2013 DONE
Third Notice 12/9/20121/3/2013 DONE
mailed to ESI Attn: David B.
Second Notice 11/24/201212/4/2012 DONE
First Notice 10/28/201211/14/2012 DONE
DetailsChristina Prado
mailed 11-15
Temporary Occupancy UNPAID FEE  10/18/2012 DONE
DetailsBarbara Stitt
Permanent Occupancy  10/18/2012 DONE
DetailsBarbara Stitt
BLD-Final10/15/201210/15/201210/15/2012PPASS
DetailsTom Arcoraci
eric Phone #: ###-####
FIRE-Final Inspection10/10/201210/10/201210/10/2012PPASS
DetailsForrest France
C/N items finished. Fire life safety final approved.
FIRE-Final Inspection10/4/201210/9/201210/9/2012PPART
DetailsForrest France
One exit sign, two EM lights repaired while on site. Door hardware revisions at the main entry/exits underway. Project related fire sprinkler permit final pending. Remainder of fire life safety items passed.
BLD-Other10/3/201210/4/201210/4/2012APASS
DetailsDave Hannah
eric - ceiling Phone #: ###-####
FIRE-Conference9/28/20129/28/20129/28/2012PDONE
DetailsForrest France
Regarding PFE locations, electrical permit, exit signs and EM lights, and project related FIR permits.
BLD-Conference8/22/20128/24/20128/24/2012ADONE
DetailsDave Hannah
Eric Phone #: ###-#### ok for wal greens to stock store
FIRE-Conference8/23/20128/23/20128/23/2012ADONE
DetailsForrest France
Eric phone #: ###-####
FIRE-Conference7/24/20127/24/20127/25/2012PDONE
DetailsForrest France
BLD-Framing/Rough-in7/18/20127/18/20127/18/2012PNR
DetailsDave Hannah
Eriic Biggs-Ceiling Grid inspection please Phone #: ###-####
FIRE-Conference7/10/20127/10/20127/10/2012PDONE
DetailsForrest France
On site visit with contractor regarding IFC section 912 regarding FDC location.
BLD-Framing/Rough-in6/1/20126/4/20126/4/2012ANR
DetailsDave Hannah
Building Final - Please call Steve Ove ###-#### Phone #: ###-#### >> Inspection requested via web by Brian Warbis
BLD-Framing/Rough-in5/16/20125/17/20125/17/2012APART
DetailsDave Hannah
VAUGHAN Phone #: ###-#### ext wall for elec room ok to cover
BLD-Framing/Rough-in5/10/20125/11/20125/11/2012APASS
DetailsMike Jordan
von Phone #: ###-####. Framing for dirve through canopy structure at pharmacy.
BLD-Footing4/4/20124/5/20124/5/2012APART
DetailsDave Hannah
late am//rebar for footing//Vaughn Phone #: ###-####
BLD-Other3/13/20123/14/20123/14/2012ACANC
DetailsDave Hannah
Rebar steel/Grout -- Vaughn Phone #: ###-####
BLD-Concrete3/2/20123/5/20123/5/2012ADEFR
DetailsDave Hannah
Von-Re-bar inspection--Late am please Phone #: ###-#### mti on site talked with matt all going well
BLD-Other2/29/20123/1/20123/5/2012ADONE
DetailsDave Hannah
grout and rebar insp// Vaughn Phone #: ###-####
CHANGE STATUS TO (ISS)  2/22/2012 DONE
DetailsTisha Gallop
paid plan mod fees
Permit Ready to Issue  2/10/2012 DONE
DetailsRita DeYoung
waiting on plan mod review fees from John M. Will complete batch stamping when review fees are added.
Plan assigned to (JCM)1/9/2012 2/10/2012 PASS
DetailsJohn Menard
Plan modification
PLANS/APPL TAKEN TO FRONT DESK  2/9/2012 DONE
DetailsJohn Menard
Routing - PLUMBING2/8/2012 2/9/2012 PASS
DetailsBill VanDegrift
Routing - PLAN CHECK2/8/2012 2/8/2012 PASS
DetailsJohn Menard
BLD-Other2/1/20122/2/20122/2/2012PPASS
DetailsTom Arcoraci
wants around 2pm//grout rebar insp for cmu wall//vaughn Phone #: ###-#### spec inspection
BLD-Other1/31/20122/1/20122/1/2012APART
DetailsJim Storey
vaugh - grout and rebar - mid-morning please Phone #: ###-#### placed with si in staff meetting all morning.
BLD-Other1/27/20121/30/20122/1/2012APART
DetailsDave Hannah
late am//block insp for rebar and grout exterior only//Vaughn Phone #: ###-####mti on site
BLD-Other1/20/20121/23/20121/23/2012PCANC
DetailsDave Hannah
Grout & Re-Bar inspection please ###-#### Von
Routing - PLAN CHECK1/9/2012 1/12/2012 FAIL
DetailsJohn Menard
Routing - PLUMBING1/12/2012 1/12/2012 PASS
DetailsBill VanDegrift
Plan resubmittals requested  1/12/2012 DONE
DetailsJohn Menard
Requested revisions for Plan Modifications via ProjectDox. JCM
Routing - FIRE1/9/2012 1/11/2012 PASS
DetailsScott Arellano
Routing - Design Review1/9/2012 1/10/2012 PASS
DetailsAndrea Tuning
BLD-Other12/16/201112/19/201112/19/2011ADONE
DetailsDave Hannah
request about 10//rebar for concrete wall//Vaughn Phone #: ###-####
BLD-Concrete12/13/201112/14/201112/14/2011APART
DetailsDave Hannah
bob - footing rebar - late morning please Phone #: ###-####
Issue PAID IN FULL permit  10/21/2011 DONE
DetailsBarbara Stitt
Print Occupancy Form  10/7/2011 DONE
DetailsBarbara Stitt
Permit Ready to Issue  10/7/2011 DONE
DetailsBarbara Stitt
Telephone call  10/7/2011 DONE
DetailsBarbara Stitt
Email sent to David Bowar with ESI informing him that the permit is ready, the fees due and we need the RP info.
PLANS/APPL TAKEN TO FRONT DESK  10/6/2011 DONE
DetailsJohn Menard
Plan assigned to (JCM)7/26/2011 10/6/2011 PASS
DetailsJohn Menard
Routing - PLAN CHECK9/8/2011 10/6/2011 PASS
DetailsJohn Menard
Routing Off Site - STRUCTURAL9/30/2011 10/4/2011 PASS
DetailsJohn Menard
E-plan resubmittals sent. JCM
Plan resubmittals received  9/30/2011 DONE
DetailsJohn Menard
E-plan structural resubmittals. JCM
Plan resubmittals requested  9/28/2011 DONE
DetailsJohn Menard
Sent applicant an e-plan request for structural revisions. JCM
Routing PW Solid Waste9/26/2011 9/26/2011 PASS
DetailsPeter J. McCullough
Routing - PLANNING Land Div9/26/2011 9/26/2011 PASS
DetailsDave Abo
Record of Survey requirements completed.
Routing - Design Review9/8/2011 9/26/2011 PASS
DetailsAndrea Tuning
I am waiting for the 10 day appeal period to expire and will sign off on the building permit on Monday September 26, 2011.
Routing Off Site - STRUCTURAL9/8/2011 9/22/2011 FAIL
DetailsJohn Menard
Plan resubmittals received  9/22/2011 DONE
DetailsJohn Menard
Architect e-mailed revised energy envelope compliance plan sheet and I uploaded it to ProjectDox. JCM
Plan resubmittals requested  9/19/2011 DONE
DetailsJohn Menard
E-review
Routing - FIRE9/8/2011 9/14/2011 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - Erosion and Sediment9/8/2011 9/14/2011 PASS
DetailsClint A Smith
ESC11-00518 plan approved with mark ups and with conditions attached to the permit.
Routing PW Solid Waste9/8/2011 9/12/2011 FAIL
DetailsPeter J. McCullough
Plan resubmittals requested  9/12/2011 DONE
DetailsJohn Menard
E-mailed the architect advising him that all revised plans sheets had not been uploaded to ProjectDox. JCM
Routing - PLANNING Land Div9/8/2011 9/9/2011 FAIL
DetailsDave Abo
Need to record Notice of Buildable Parcel and Quit Claim Deed.
Provide copies of recorded documents to Subdivision Staff. Obtain new Tax Parcel Number from Ada County Assessor.
Routing - PLANNING9/8/2011 9/8/2011 PASS
DetailsCody Riddle
Routing - PLAN CHECK7/26/2011 8/24/2011 FAIL
DetailsJohn Menard
1st review completed  8/24/2011 FAIL
Routing - PLANNING7/26/2011 8/11/2011 PASS
DetailsCody Riddle
I failed to enter my activity after reviewing the permit in ProjectDox. I have received the required written approval from ITD.
Routing - FIRE7/26/20117/26/20118/8/2011 FAIL
DetailsScott Arellano
Failed 1st review. Changes are necessary within E-plan review.
Routing Off Site - STRUCTURAL7/26/2011 8/6/2011 FAIL
DetailsJohn Menard
Routing PW Flood Plain7/27/2011 8/4/2011 PASS
DetailsJim Wyllie
Routing - PUBLIC WORKS7/26/2011 8/4/2011 PASS
DetailsBeverly Mountain
Routing - Erosion and Sediment8/2/2011 8/2/2011 FAIL
DetailsSteven Webb
ESC narrative was not submitted as needed for review. Provide a changed mark for the applicant.
Routing - Addressing7/26/2011 8/1/2011 PASS
DetailsApril Wing
Route to Impact Fee Review7/26/20117/29/20117/29/2011 PASS
DetailsCindy M. Gould
Routing - PLUMBING7/26/2011 7/29/2011 PASS
DetailsBill VanDegrift
additional cross connection protection may be required at pharmacy sink. use DCVA instead of R,P, on service. 120 deg max to lavs.
Routing PW Drainage7/27/2011 7/29/2011 PASS
DetailsBrian Murphy
Routing PW Street Lights7/27/2011 7/29/2011 PASS
DetailsMike D Hedge
Routing PW Sewer Design7/27/2011 7/27/2011 PASS
DetailsJon R. Gunnerson
Sewer Tap Permit Required
Routing PW Sewer Rating7/27/2011 7/27/2011 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste7/27/2011 7/27/2011 FAIL
DetailsPeter J. McCullough
Location and type of solid waste containers are not indicated.
Routing PW Environmental7/27/2011 7/27/2011 PASS
DetailsWalt Baumgartner
Silver BMPs apply to photo processing area for discharge of silver bearing wastewater. ###-#### for info
Routing - PLANNING Land Div7/26/2011 7/27/2011 FAIL
DetailsDave Abo
Do not issue building permit until Record of Survey for Property Line Adjustment is completed (ROS11-00011).
Intake Approval  7/26/2011 PASS
DetailsJohn Menard
Pending Assignment by JCM7/26/2011 7/26/2011 DONE
DetailsJohn Menard
Routing - Design Review7/26/2011 7/26/2011 FAIL
DetailsAndrea Tuning
Zoning Approval10/18/201210/18/2012   
DetailsAndrea Tuning
The applicant submitted a bond in the amount of $55,000 for the installation of the turf gras located to the south of the Whole Foods Building and the Trellis system for the Whole Foods Building.
Application received 7/19/2011