Print Statement | | | 5/10/2013 | | DONE |
|
|
|
|
Third Notice | | 12/9/2012 | 1/3/2013 | | DONE |
|
|
|
mailed to ESI Attn: David B.
|
Second Notice | | 11/24/2012 | 12/4/2012 | | DONE |
|
|
|
|
First Notice | | 10/28/2012 | 11/14/2012 | | DONE |
Christina Prado
|
|
|
mailed 11-15
|
Temporary Occupancy UNPAID FEE | | | 10/18/2012 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 10/18/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 10/15/2012 | 10/15/2012 | 10/15/2012 | P | PASS |
Tom Arcoraci
|
|
|
eric Phone #: ###-####
|
FIRE-Final Inspection | 10/10/2012 | 10/10/2012 | 10/10/2012 | P | PASS |
Forrest France
|
|
|
C/N items finished. Fire life safety final approved.
|
FIRE-Final Inspection | 10/4/2012 | 10/9/2012 | 10/9/2012 | P | PART |
Forrest France
|
|
|
One exit sign, two EM lights repaired while on site. Door hardware revisions at the main entry/exits underway. Project related fire sprinkler permit final pending. Remainder of fire life safety items passed.
|
BLD-Other | 10/3/2012 | 10/4/2012 | 10/4/2012 | A | PASS |
Dave Hannah
|
|
|
eric - ceiling Phone #: ###-####
|
FIRE-Conference | 9/28/2012 | 9/28/2012 | 9/28/2012 | P | DONE |
Forrest France
|
|
|
Regarding PFE locations, electrical permit, exit signs and EM lights, and project related FIR permits.
|
BLD-Conference | 8/22/2012 | 8/24/2012 | 8/24/2012 | A | DONE |
Dave Hannah
|
|
|
Eric Phone #: ###-#### ok for wal greens to stock store
|
FIRE-Conference | 8/23/2012 | 8/23/2012 | 8/23/2012 | A | DONE |
Forrest France
|
|
|
Eric phone #: ###-####
|
FIRE-Conference | 7/24/2012 | 7/24/2012 | 7/25/2012 | P | DONE |
Forrest France
|
|
|
|
BLD-Framing/Rough-in | 7/18/2012 | 7/18/2012 | 7/18/2012 | P | NR |
Dave Hannah
|
|
|
Eriic Biggs-Ceiling Grid inspection please Phone #: ###-####
|
FIRE-Conference | 7/10/2012 | 7/10/2012 | 7/10/2012 | P | DONE |
Forrest France
|
|
|
On site visit with contractor regarding IFC section 912 regarding FDC location.
|
BLD-Framing/Rough-in | 6/1/2012 | 6/4/2012 | 6/4/2012 | A | NR |
Dave Hannah
|
|
|
Building Final - Please call Steve Ove ###-#### Phone #: ###-#### >> Inspection requested via web by Brian Warbis
|
BLD-Framing/Rough-in | 5/16/2012 | 5/17/2012 | 5/17/2012 | A | PART |
Dave Hannah
|
|
|
VAUGHAN Phone #: ###-#### ext wall for elec room ok to cover
|
BLD-Framing/Rough-in | 5/10/2012 | 5/11/2012 | 5/11/2012 | A | PASS |
Mike Jordan
|
|
|
von Phone #: ###-####. Framing for dirve through canopy structure at pharmacy.
|
BLD-Footing | 4/4/2012 | 4/5/2012 | 4/5/2012 | A | PART |
Dave Hannah
|
|
|
late am//rebar for footing//Vaughn Phone #: ###-####
|
BLD-Other | 3/13/2012 | 3/14/2012 | 3/14/2012 | A | CANC |
Dave Hannah
|
|
|
Rebar steel/Grout -- Vaughn Phone #: ###-####
|
BLD-Concrete | 3/2/2012 | 3/5/2012 | 3/5/2012 | A | DEFR |
Dave Hannah
|
|
|
Von-Re-bar inspection--Late am please Phone #: ###-#### mti on site talked with matt all going well
|
BLD-Other | 2/29/2012 | 3/1/2012 | 3/5/2012 | A | DONE |
Dave Hannah
|
|
|
grout and rebar insp// Vaughn Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 2/22/2012 | | DONE |
Tisha Gallop
|
|
|
paid plan mod fees
|
Permit Ready to Issue | | | 2/10/2012 | | DONE |
Rita DeYoung
|
|
|
waiting on plan mod review fees from John M. Will complete batch stamping when review fees are added.
|
Plan assigned to (JCM) | 1/9/2012 | | 2/10/2012 | | PASS |
John Menard
|
|
|
Plan modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2012 | | DONE |
John Menard
|
|
|
|
Routing - PLUMBING | 2/8/2012 | | 2/9/2012 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - PLAN CHECK | 2/8/2012 | | 2/8/2012 | | PASS |
John Menard
|
|
|
|
BLD-Other | 2/1/2012 | 2/2/2012 | 2/2/2012 | P | PASS |
Tom Arcoraci
|
|
|
wants around 2pm//grout rebar insp for cmu wall//vaughn Phone #: ###-#### spec inspection
|
BLD-Other | 1/31/2012 | 2/1/2012 | 2/1/2012 | A | PART |
Jim Storey
|
|
|
vaugh - grout and rebar - mid-morning please Phone #: ###-#### placed with si in staff meetting all morning.
|
BLD-Other | 1/27/2012 | 1/30/2012 | 2/1/2012 | A | PART |
Dave Hannah
|
|
|
late am//block insp for rebar and grout exterior only//Vaughn Phone #: ###-####mti on site
|
BLD-Other | 1/20/2012 | 1/23/2012 | 1/23/2012 | P | CANC |
Dave Hannah
|
|
|
Grout & Re-Bar inspection please ###-#### Von
|
Routing - PLAN CHECK | 1/9/2012 | | 1/12/2012 | | FAIL |
John Menard
|
|
|
|
Routing - PLUMBING | 1/12/2012 | | 1/12/2012 | | PASS |
Bill VanDegrift
|
|
|
|
Plan resubmittals requested | | | 1/12/2012 | | DONE |
John Menard
|
|
|
Requested revisions for Plan Modifications via ProjectDox. JCM
|
Routing - FIRE | 1/9/2012 | | 1/11/2012 | | PASS |
Scott Arellano
|
|
|
|
Routing - Design Review | 1/9/2012 | | 1/10/2012 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Other | 12/16/2011 | 12/19/2011 | 12/19/2011 | A | DONE |
Dave Hannah
|
|
|
request about 10//rebar for concrete wall//Vaughn Phone #: ###-####
|
BLD-Concrete | 12/13/2011 | 12/14/2011 | 12/14/2011 | A | PART |
Dave Hannah
|
|
|
bob - footing rebar - late morning please Phone #: ###-####
|
Issue PAID IN FULL permit | | | 10/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 10/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 10/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 10/7/2011 | | DONE |
Barbara Stitt
|
|
|
Email sent to David Bowar with ESI informing him that the permit is ready, the fees due and we need the RP info.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2011 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 7/26/2011 | | 10/6/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/8/2011 | | 10/6/2011 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 9/30/2011 | | 10/4/2011 | | PASS |
John Menard
|
|
|
E-plan resubmittals sent. JCM
|
Plan resubmittals received | | | 9/30/2011 | | DONE |
John Menard
|
|
|
E-plan structural resubmittals. JCM
|
Plan resubmittals requested | | | 9/28/2011 | | DONE |
John Menard
|
|
|
Sent applicant an e-plan request for structural revisions. JCM
|
Routing PW Solid Waste | 9/26/2011 | | 9/26/2011 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - PLANNING Land Div | 9/26/2011 | | 9/26/2011 | | PASS |
Dave Abo
|
|
|
Record of Survey requirements completed.
|
Routing - Design Review | 9/8/2011 | | 9/26/2011 | | PASS |
Andrea Tuning
|
|
|
I am waiting for the 10 day appeal period to expire and will sign off on the building permit on Monday September 26, 2011.
|
Routing Off Site - STRUCTURAL | 9/8/2011 | | 9/22/2011 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/22/2011 | | DONE |
John Menard
|
|
|
Architect e-mailed revised energy envelope compliance plan sheet and I uploaded it to ProjectDox. JCM
|
Plan resubmittals requested | | | 9/19/2011 | | DONE |
John Menard
|
|
|
E-review
|
Routing - FIRE | 9/8/2011 | | 9/14/2011 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - Erosion and Sediment | 9/8/2011 | | 9/14/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00518 plan approved with mark ups and with conditions attached to the permit.
|
Routing PW Solid Waste | 9/8/2011 | | 9/12/2011 | | FAIL |
Peter J. McCullough
|
|
|
|
Plan resubmittals requested | | | 9/12/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect advising him that all revised plans sheets had not been uploaded to ProjectDox. JCM
|
Routing - PLANNING Land Div | 9/8/2011 | | 9/9/2011 | | FAIL |
Dave Abo
|
|
|
Need to record Notice of Buildable Parcel and Quit Claim Deed.
Provide copies of recorded documents to Subdivision Staff. Obtain new Tax Parcel Number from Ada County Assessor.
|
Routing - PLANNING | 9/8/2011 | | 9/8/2011 | | PASS |
Cody Riddle
|
|
|
|
Routing - PLAN CHECK | 7/26/2011 | | 8/24/2011 | | FAIL |
John Menard
|
|
|
|
1st review completed | | | 8/24/2011 | | FAIL |
|
|
|
|
Routing - PLANNING | 7/26/2011 | | 8/11/2011 | | PASS |
Cody Riddle
|
|
|
I failed to enter my activity after reviewing the permit in ProjectDox. I have received the required written approval from ITD.
|
Routing - FIRE | 7/26/2011 | 7/26/2011 | 8/8/2011 | | FAIL |
Scott Arellano
|
|
|
Failed 1st review. Changes are necessary within E-plan review.
|
Routing Off Site - STRUCTURAL | 7/26/2011 | | 8/6/2011 | | FAIL |
John Menard
|
|
|
|
Routing PW Flood Plain | 7/27/2011 | | 8/4/2011 | | PASS |
Jim Wyllie
|
|
|
|
Routing - PUBLIC WORKS | 7/26/2011 | | 8/4/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Erosion and Sediment | 8/2/2011 | | 8/2/2011 | | FAIL |
Steven Webb
|
|
|
ESC narrative was not submitted as needed for review. Provide a changed mark for the applicant.
|
Routing - Addressing | 7/26/2011 | | 8/1/2011 | | PASS |
April Wing
|
|
|
|
Route to Impact Fee Review | 7/26/2011 | 7/29/2011 | 7/29/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLUMBING | 7/26/2011 | | 7/29/2011 | | PASS |
Bill VanDegrift
|
|
|
additional cross connection protection may be required at pharmacy sink. use DCVA instead of R,P, on service. 120 deg max to lavs.
|
Routing PW Drainage | 7/27/2011 | | 7/29/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 7/27/2011 | | 7/29/2011 | | PASS |
Mike D Hedge
|
|
|
|
Routing PW Sewer Design | 7/27/2011 | | 7/27/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Sewer Tap Permit Required
|
Routing PW Sewer Rating | 7/27/2011 | | 7/27/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 7/27/2011 | | 7/27/2011 | | FAIL |
Peter J. McCullough
|
|
|
Location and type of solid waste containers are not indicated.
|
Routing PW Environmental | 7/27/2011 | | 7/27/2011 | | PASS |
Walt Baumgartner
|
|
|
Silver BMPs apply to photo processing area for discharge of silver bearing wastewater. ###-#### for info
|
Routing - PLANNING Land Div | 7/26/2011 | | 7/27/2011 | | FAIL |
Dave Abo
|
|
|
Do not issue building permit until Record of Survey for Property Line Adjustment is completed (ROS11-00011).
|
Intake Approval | | | 7/26/2011 | | PASS |
John Menard
|
|
|
|
Pending Assignment by JCM | 7/26/2011 | | 7/26/2011 | | DONE |
John Menard
|
|
|
|
Routing - Design Review | 7/26/2011 | | 7/26/2011 | | FAIL |
Andrea Tuning
|
|
|
|
Zoning Approval | 10/18/2012 | 10/18/2012 | | | |
Andrea Tuning
|
|
|
The applicant submitted a bond in the amount of $55,000 for the installation of the turf gras located to the south of the Whole Foods Building and the Trellis system for the Whole Foods Building.
|
Application received | | 7/19/2011 | | | |
|
|
|
|