Print Statement | | | 12/13/2011 | | DONE |
|
|
|
|
Third Notice | | 10/26/2011 | 11/7/2011 | | DONE |
|
|
|
faxed
|
Second Notice | | 10/16/2011 | 10/21/2011 | | DONE |
|
|
|
faxed 10-21-11
|
Case Summary (BLD) | | | 10/19/2011 | | |
|
|
|
|
First Notice | | 10/2/2011 | 10/6/2011 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 9/22/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 9/20/2011 | 9/21/2011 | 9/21/2011 | A | PASS |
Mike Jordan
|
|
|
jack Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 9/20/2011 | 9/20/2011 | 9/20/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Other | 9/8/2011 | 9/8/2011 | 9/8/2011 | P | PASS |
Mike Jordan
|
|
|
Ceiling grid insp. Key is above door. Phone #: ###-#### >> Inspection requested via web by Richard Schultz. ceiling grid ok.
|
BLD-Framing/Rough-in | 8/29/2011 | 8/30/2011 | 8/30/2011 | A | PASS |
Mike Jordan
|
|
|
key is above door for access Phone #: ###-#### >> Inspection requested via web by Richard Schultz. Interior steel stud walls only, no grid.
|
Issue PAID IN FULL permit | | | 7/27/2011 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 7/26/2011 | | DONE |
|
|
|
|
Telephone call | | | 7/26/2011 | | DONE |
Christina Prado
|
|
|
Left message for Matt Rhees, gave fees due, advised on requirment of GC/RCE and ACHD Letter
|
Permit Ready to Issue | | | 7/26/2011 | | DONE |
Christina Prado
|
|
|
|
Plan Reviewer's activity | | | 7/26/2011 | | DONE |
Tim L. Woodard
|
|
|
Modified required signatures to remove ACHD signoff. This sign off was required due to an exam room being showed. The architect has sent in a letter explaining the use. The use is not one consistent with a medical office; therefore, the signoff was removed.
|
Plan assigned to (TLW) | 7/19/2011 | | 7/25/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 7/21/2011 | | 7/25/2011 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 7/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 7/25/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | 7/19/2011 | | 7/21/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/20/2011 | | 7/20/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 7/20/2011 | | 7/20/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/2011 | | |
|
|
|
7-19-11 ok per Tim Woodard to take in as a level 1
|
Recd Pcfee & Taken To Pln CK | | | 7/19/2011 | | DONE |
|
|
|
|
Application received | | 7/19/2011 | | | |
|
|
|
|