Third Notice | | 12/10/2011 | 12/6/2011 | | DONE |
|
|
|
|
Second Notice | | 12/1/2011 | 12/5/2011 | | DONE |
Christina Prado
|
|
|
mailed 12-5-11
|
First Notice | | 11/19/2011 | 11/21/2011 | | DONE |
|
|
|
|
Permanent Occupancy | | | 11/9/2011 | | DONE |
Christina Prado
|
|
|
|
PubWorks Occupancy Approval | 11/8/2011 | 11/8/2011 | 11/8/2011 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 11/4/2011 | 11/7/2011 | 11/7/2011 | P | PASS |
Tom Arcoraci
|
|
|
Jeff Phone #: ###-####
|
Zoning Approval | 11/4/2011 | 11/4/2011 | 11/4/2011 | | PASS |
Josh Wilson
|
|
|
Revised landscaping ok per ACHD prohibition on landscaping which requires watering JGW 11-4-11
|
FIRE-Final Inspection | 11/3/2011 | 11/4/2011 | 11/3/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 11/2/2011 | 11/3/2011 | 11/3/2011 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire dept access signage as discussed and provide single action hardware on the office and restrooms doors.
|
BLD-Energy code compliance | 10/18/2011 | 10/19/2011 | 10/19/2011 | P | PASS |
Tom Arcoraci
|
|
|
LATE AFTERNOON--JEFF Phone #: ###-####
|
BLD-Framing/Rough-in | 10/17/2011 | 10/18/2011 | 10/18/2011 | P | PASS |
Tom Arcoraci
|
|
|
jeff Phone #: ###-####
|
BLD-Other | 10/6/2011 | 10/7/2011 | 10/7/2011 | P | PASS |
Tom Arcoraci
|
|
|
Shear sheet & hold down--Jeff Phone #: ###-####
|
BLD-Foundation | 9/14/2011 | 9/15/2011 | 9/15/2011 | A | DEFR |
Mike Jordan
|
|
|
Jeff-Concrete pour at 12:00 noon Phone #: ###-####
|
BLD-Footing | 9/13/2011 | 9/14/2011 | 9/14/2011 | A | PASS |
Mike Jordan
|
|
|
jeff - as early as possible please Phone #: ###-####. Perimeter footings for shop and office. Will kave special inspections. Aslo reviewed special inspection reports to date. All footings have been over excavated, backfillled, compacted and tested per special inspection report. Geo-tech. engineer has also inspected and approved footings per his report.
|
Issue PAID IN FULL permit | | | 9/6/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CJW) | 8/11/2011 | 8/11/2011 | 8/31/2011 | | PASS |
Carl Westfall
|
|
|
GILLINGHAM BUILDING
|
Routing - PUBLIC WORKS | 8/31/2011 | | 8/31/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - PLAN CHECK | 8/31/2011 | | 8/31/2011 | | DONE |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2011 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/31/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/31/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/31/2011 | | DONE |
Tisha Gallop
|
|
|
called Richard and told him permit is ready and fees, and need ACHD.
|
Routing - PLAN CHECK | 8/23/2011 | | 8/30/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
Routing - PUBLIC WORKS | 8/30/2011 | | 8/30/2011 | | PASS |
Jim Wyllie
|
|
|
Note added to architectural plans regarding compliance with Geotechnical Investigation (7/08/11)and letter from Stan Crawforth to Jim Wyllie dated 8/08/11.
JIm Wyllie / ###-####
|
Route to Impact Fee Review | 8/19/2011 | 8/24/2011 | 8/24/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals received | | | 8/24/2011 | | DONE |
Christina Prado
|
|
|
Received one copy of transmittal letter and two copies of plans A5, A7 & H1.0. Plan taken to Carl Westfall for review
|
Routing - FIRE | 8/19/2011 | 8/19/2011 | 8/23/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 8/23/2011 | | FAIL |
|
|
|
Failed Public Works, Structural,Plan Check
|
Routing - PLAN CHECK | 8/9/2011 | | 8/19/2011 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on Aug. 11, 2011 and was finished on Aug. 19, 2011. Revised drawings were required. See the plan review report.
|
Routing Off Site - STRUCTURAL | 8/11/2011 | | 8/15/2011 | | PASS |
Carl Westfall
|
|
|
Design approved by consultant. Review did not consider the soil issues.
|
Plan resubmittals received | | | 8/12/2011 | | |
|
|
|
Received sheets C-2.1, C3.1 and updated O & M manual given to Carl Westfall
|
Plan assigned to (JCM) | 7/22/2011 | | 8/11/2011 | | |
John Menard
|
|
|
Reassigned to Carl Westfall.
|
Plan resubmittals received | | | 8/10/2011 | | |
|
|
|
Received a cover transmital, PLan review response comments letter, 4 copies of sheet A5, Sheet A7, 4 copies of revised structural calcs, 4 copies of truss submittals inserted into plans by architects office then returned to John Menards office
|
Routing - PLANNING | 8/8/2011 | | 8/9/2011 | | PASS |
Josh Wilson
|
|
|
Ok per DRH11-00141
|
Routing - PLUMBING | 8/4/2011 | | 8/8/2011 | | PASS |
Daryl Spivey
|
|
|
Per plans and 2003 UPC.
|
Routing - Erosion and Sediment | 8/4/2011 | | 8/4/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00510
|
Routing - PUBLIC WORKS | 7/22/2011 | | 8/4/2011 | | FAIL |
Connie Baumgartner
|
|
|
Per Jason Blais--Route to Jim Wylie
Failed by Jim Wylie - ###-####
|
Routing PW Flood Plain | 8/2/2011 | | 8/4/2011 | | FAIL |
Jim Wyllie
|
|
|
Building Plans do not incorporate recommendations contained in the Geotechnical Investigation / Proposed Shop/Office Building by Stan Crawforth dated 7-8-11. Plans need to incorporate geotec recommendations prior to approval. Jim Wyllie (###-####)
|
Routing PW Solid Waste | 8/2/2011 | | 8/2/2011 | | PASS |
Peter J. McCullough
|
|
|
Approved for commercial cart service only. No dumpster without an approved enclosure.
|
Routing PW Drainage | 7/27/2011 | | 8/2/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing Off Site - STRUCTURAL | 7/22/2011 | | 8/2/2011 | | FAIL |
Jason Blais
|
|
|
Called action couriers for pick up - First Structural Review report sent to architect
|
Routing PW Street Lights | 7/26/2011 | | 7/27/2011 | | PASS |
Mike D Hedge
|
|
|
No lights required.
|
Routing PW Sewer Design | 7/22/2011 | | 7/26/2011 | | PASS |
Jon R. Gunnerson
|
|
|
Connect onto existing sewer services provided.
|
Routing - Addressing | 7/22/2011 | | 7/22/2011 | | PASS |
Terry Records
|
|
|
|
Routing PW Sewer Rating | 7/22/2011 | | 7/22/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 7/21/2011 | | 7/22/2011 | | PASS |
Dave Abo
|
|
|
Parcel is over 5 acres in size.
|
Pending Assignment by JCM | 7/21/2011 | | 7/22/2011 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 7/21/2011 | | FAIL |
|
|
|
Engineers stamp is required on the structural sheets
|
Intake Approval | | | 7/21/2011 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/21/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/21/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 7/20/2011 | | | |
|
|
|
|