Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD11-01791
StatusFinaled
Name SCHWALBE & STOREY CONTRACTORS
Site Address 300 E MALLARD DR Unit: 170
Project NameLakepointe Centre
Customer Number 
ePlanReviewNo
Description
(U.S. DEPT. OF THE INTERIOR – Office of Wildland Fire)(LAKEPOINTE CENTRE 1-STE 170) Permit is to remodel an existing 586 square foot files room into a video conference room in an existing 5,198 square foot tenant space. Work to include some minor interior demolition work, some new interior walls and a door, interior finish, installation of new accessible door hardware, minor fire sprinkler and alarm work, and electrical work. A new Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for one-hour substitution. . This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire department.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/21/201112/19/2011 DONE
Print Occupancy Form  12/16/2011  
Permanent Occupancy  12/16/2011 DONE
DetailsBarbara Stitt
Third Notice 12/5/201112/9/2011 DONE
faxed to Schwalbe & Storey Contractors
Third Notice 11/12/201111/22/2011 DONE
faxed
Second Notice 10/30/201111/7/2011 DONE
DetailsChristina Prado
faxed 11-7-11
First Notice10/17/201110/17/201110/20/2011 DONE
DetailsJim Storey
BLD-Final10/14/201110/17/201110/17/2011PPASS
DetailsJim Storey
doug Phone #: ###-####
DOC - Permit Finaled10/17/201110/17/201110/17/2011PPASS
DetailsJim Storey
FIRE-Final Inspection10/14/201110/17/201110/17/2011APASS
DetailsForrest France
Fire life safety inspection passed.
FIRE-Final Inspection9/29/20119/29/20119/29/2011ANR
DetailsForrest France
Pending project related fire alarm permit work. Discussed door hardware requirements
BLD-Framing/Rough-in8/15/20118/15/20118/15/2011PPASS
DetailsJim Storey
dave Phone #: ###-#### pending ele
Case Summary (BLD)  8/10/2011 DONE
DetailsTisha Gallop
Issue PAID IN FULL permit  8/9/2011 DONE
DetailsTisha Gallop
Plan assigned to (TLW)7/28/2011 8/4/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK7/28/2011 8/4/2011 PASS
DetailsTim L. Woodard
1st review completed  8/4/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/4/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/4/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  8/4/2011 DONE
Permit Ready to Issue  8/4/2011 DONE
DetailsTisha Gallop
Telephone call  8/4/2011 DONE
DetailsTisha Gallop
called Matt Rhees and told him permit is ready, fees and need GC/RCE/form.
Recd Pcfee & Taken To Pln CK  7/28/2011 DONE
Plans ACCEPTED BY PLAN TECH  7/28/2011 DONE
ok per Tim W to take in as a level 1
Application received 7/28/2011