Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD11-01792
StatusFinaled
Name RAISTRICK CONSTRUCTION
Site Address 250 W BOBWHITE CT Unit: 110
Project NameRocky Mtn Gyn & Hormone Center
Customer Number 
ePlanReviewNo
Description
(ROCKY MOUNTAIN GYN and HORMONE CENTER – Greystone Building – Ste #110) Permit is to remodel an existing 4,849 square foot medical office (outpatient surgery center) by splitting the space up into two separate tenant spaces, this space would be a 2,620 square foot medical office (non-ambulatory). Approval contingent upon adhering to the approved plans on file. Work to include: installation of interior non-load bearing walls full height, lighting changes, installation of new doors and windows, installation of plumbing for a new unisex accessible dressing room, and interior finishes in compliance with Ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 2/2/20121/24/2012 DONE
Third Notice 1/17/20121/19/2012 DONE
faxed
Third Notice 12/10/20111/3/2012 DONE
faxed
Second Notice 12/1/201112/5/2011 DONE
DetailsChristina Prado
faxed 12-05-11
First Notice 11/20/201111/21/2011 DONE
BLD-Final11/9/201111/10/201111/10/2011APASS
DetailsJim Storey
Dennis Phone #: ###-####
FIRE-Final Inspection11/9/201111/10/201111/10/2011APASS
DetailsTroy Cobbley
life safety passed
Permanent Occupancy  11/10/2011  
FIRE-Sprinkler Rough-in10/19/201110/19/201110/19/2011PPART
DetailsForrest France
See approved fire protection plans for dated inspection notes regarding areas okayed for cover.
FIRE-Conference9/29/20119/29/20119/30/2011PDONE
DetailsForrest France
On site meeting with general and subcontractor regarding existing fire sprinkler coverage above the drop ceilings at exposed combustible construction. Upright protection must meet installation guidelines per NFPA 13 2010.
BLD-Framing/Rough-in9/7/20119/7/20119/7/2011PPART
DetailsMike Jordan
Dennis Phone #: ###-####. Interior framed walls and infills. No grid, pending electrical. Also noted that proposed glazing at atrium has been removed.
Issue PAID IN FULL permit  8/16/2011 DONE
DetailsBarbara Stitt
Print Occupancy Form  8/12/2011 DONE
Permit Ready to Issue  8/12/2011 DONE
DetailsTisha Gallop
Telephone call  8/12/2011 DONE
DetailsTisha Gallop
called Matt Rhees and told him permit is ready and need GC form.
1st review completed  8/11/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  8/11/2011 DONE
DetailsTim L. Woodard
Case Summary (BLD)  8/11/2011 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)7/28/2011 8/11/2011 PASS
DetailsTim L. Woodard
Routing - PLAN CHECK8/1/2011 8/11/2011 PASS
DetailsTim L. Woodard
Approved with notes and redlines.
Routing PW Sewer Rating8/1/2011 8/1/2011 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS7/28/2011 8/1/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing7/29/2011 7/29/2011 PASS
DetailsTerry Records
Recd Pcfee & Taken To Pln CK  7/28/2011 DONE
Plans ACCEPTED BY PLAN TECH  7/28/2011  
ok per Tim Woodard to take in as a level 2
Application received 7/28/2011