BLD-Final | 12/4/2012 | 12/5/2012 | 12/5/2012 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Hunter // done
|
DOC - Permit Finaled | 12/5/2012 | 12/5/2012 | 12/5/2012 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Final | 4/9/2012 | 4/9/2012 | 4/9/2012 | P | PEND |
Tony Young
|
|
|
Bob Phone #: ###-####,, need final letter from archtect/engineer as ok as built,, all else ok
|
BLD-Conference | 4/3/2012 | 4/3/2012 | 4/3/2012 | P | PART |
Tony Young
|
|
|
bob Phone #: ###-####,, ?s on final
|
CHANGE STATUS TO (ISS) | | | 4/3/2012 | | |
|
|
|
for some reason this did not get put back into the issue status ///dld
|
Routing Walk-In (BLD) | 2/10/2012 | 2/10/2012 | 2/10/2012 | A | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 2/10/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/10/2012 | | |
|
|
|
|
Case Summary (BLD) | | | 2/10/2012 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2012 | | DONE |
|
|
|
|
BLD-Wall cover | 12/20/2011 | 12/20/2011 | 12/20/2011 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Hunter,, energy code ok
|
BLD-Energy code compliance | 12/15/2011 | 12/16/2011 | 12/19/2011 | P | PART |
Tony Young
|
|
|
work in progress,, ok to cover ceiling when ready,,, sprinkler is passed
|
BLD-Framing/Rough-in | 12/15/2011 | 12/16/2011 | 12/16/2011 | A | PART |
Tony Young
|
|
|
bob Phone #: ###-####,, ok to insulate pending sprinkler rough pass
|
BLD-Framing/Rough-in | 12/14/2011 | 12/15/2011 | 12/15/2011 | A | PART |
Tony Young
|
|
|
bob Phone #: ###-####,,, frame ok pending
|
BLD-Energy code compliance | 12/14/2011 | 12/14/2011 | 12/14/2011 | P | NR |
Tony Young
|
|
|
bob Phone #: ###-####
|
BLD-Conference | 12/1/2011 | 12/1/2011 | 12/2/2011 | P | PART |
Tony Young
|
|
|
Bob Phone #: ###-####,, flue vs. top plate ?s
|
BLD-Framing/Rough-in | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PART |
Tony Young
|
|
|
Shear inspection please-Bob Phone #: ###-####,,, exterior shear ok
|
Routing Walk-In (BLD) | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Perry Paine
|
|
|
if metal jooists and "epe" ironwood decking is used there should be no problem of the WUI requirements.
|
BLD-Foundation | 11/3/2011 | 11/4/2011 | 11/4/2011 | A | FAIL |
Mike Jordan
|
|
|
bob Phone #: ###-#### Approved plans call for special inspection for masonry, concrete and steel. Cleanouts are required for grout lifts exceeding 5ft. in height, Also clean out all mortar fins. Noted that p[lans show to grout solid only cells with reinforcement, no grout stop in wall was noted, Needs to check with engineer to ensure that steel beam will hold the additional weight of the grout. Correction notice posted, also spoke to project super about corrections.
|
BLD-Foundation | 10/14/2011 | 10/17/2011 | 10/17/2011 | A | PASS |
Tony Young
|
|
|
bob Phone #: ###-####
|
BLD-Foundation | 9/1/2011 | 9/1/2011 | 9/1/2011 | P | PART |
Tony Young
|
|
|
jay Phone #: ###-####
|
BLD-Footing | 8/24/2011 | 8/25/2011 | 8/25/2011 | A | PASS |
Tony Young
|
|
|
Jay Phone #: ###-####
|
PubWorks Subgrade Approval | 8/25/2011 | 8/25/2011 | 8/25/2011 | | DONE |
Terry Records
|
|
|
|
BLD-Footing | 8/24/2011 | 8/24/2011 | 8/24/2011 | P | NR |
Tony Young
|
|
|
Jay Phone #: ###-####,, on site conf only
|
Plan assigned to (PEP) | 8/5/2011 | 8/5/2011 | 8/5/2011 | | PASS |
Perry Paine
|
|
|
|
1st review completed | | | 8/5/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/5/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/5/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 8/5/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/5/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/5/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/5/2011 | | DONE |
|
|
|
8-05-11 called left message permit ready and fee given Also need RP ///dld
|
Issue PAID IN FULL permit | | | 8/5/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing Walk-In (PW Hillside) | 7/29/2011 | 7/29/2011 | 7/29/2011 | A | PASS |
Sarah Schafer
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
|
Routing Walk-In (Zoning) | 7/29/2011 | 7/29/2011 | 7/29/2011 | A | PASS |
Joan Johnson
|
|
|
Garage entry must be paved surface
|
Routing Walk-In (BLD) | 7/29/2011 | 7/29/2011 | 7/29/2011 | A | FAIL |
Perry Paine
|
|
|
|
Routing - Erosion and Sediment | 7/29/2011 | | 7/29/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions. ESC11-00534
|
Routing - PLAN CHECK | 7/29/2011 | | 7/29/2011 | | PASS |
Perry Paine
|
|
|
Perryneed approval for cable rails and wiu deck covering
|
Application received | | 7/29/2011 | | | |
|
|
|
|