BLD-Final | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | CANC |
Tom Arcoraci
|
|
|
Our permit is for shell only. Owner will eventually pull seperate homeowners permit for electrical and/or sheetrock-finshes. Our phase of electrical work is complete and finaled. Phone #: ###-#### >> Inspection requested via web by Mike Lincoln
|
DOC - Permit Finaled | 10/27/2011 | 10/27/2011 | 10/27/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/23/2011 | 9/26/2011 | 9/26/2011 | A | PART |
Tom Arcoraci
|
|
|
mike Phone #: ###-#### ok pending elec insp
|
BLD-Footing | 8/31/2011 | 9/1/2011 | 9/1/2011 | P | PASS |
Jim Storey
|
|
|
Mike Phone #: ###-####
|
Routing Walk-In (BLD) | 9/1/2011 | 9/1/2011 | 9/1/2011 | A | PASS |
Perry Paine
|
|
|
question(9-1-2011)"OK TO ADD GARAGE DOOR AT REAR SIDEWALL AND RAISE THE FOUNDATION TO 18" ABOVE GRADE MAX HEIGHT OF STUD IS 10'-0" PEP
|
Routing Walk-In (BLD) | 8/29/2011 | 8/29/2011 | 8/29/2011 | P | PASS |
Perry Paine
|
|
|
ok to change stud height as long as he keeps below 10'-0"
|
OVERRIDE | | | 8/1/2011 | | |
|
|
|
|
Routing Walk-In (Zoning) | 8/1/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Joan Johnson
|
|
|
Single family residential shop for owner's personal use. No commercial repair uses are allowed in an R-1C zone
|
Routing Walk-In (BLD) | 8/1/2011 | 8/1/2011 | 8/1/2011 | A | DONE |
Carl D Madsen
|
|
|
|
Plan assigned to (PEP) | 8/1/2011 | 8/1/2011 | 8/1/2011 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/1/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2011 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/1/2011 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 8/1/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/1/2011 | | DONE |
Christina Prado
|
|
|
|
Application received | | 8/1/2011 | | | |
|
|
|
|