BLD-Aging Inspection | 12/17/2015 | 12/17/2015 | 12/18/2015 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/18/2015 | 12/18/2015 | 12/18/2015 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/18/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Dave Hannah
|
|
|
Karen Phone #: ###-####
|
DOC - Permit Finaled | 12/18/2015 | 12/18/2015 | 12/18/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 12/16/2015 | 12/17/2015 | 12/18/2015 | P | NH |
Dave Hannah
|
|
|
Karen Phone #: ###-####
|
BLD-Final | 12/16/2015 | 12/16/2015 | 12/16/2015 | P | FAIL |
Candy A. Nichols
|
|
|
after talked to David Hannah I Called Karen-she needs to call Bob A about reopening the expired permit and pay the fee then call in the electrical because it was never finaled-once the ele has passed then she can call in her building final CAN
|
CHANGE STATUS TO (ISS) | | | 12/16/2015 | | DONE |
|
|
|
as per Bob A. ok to change status from epxpired to issued with a admin fee of $46.31
|
DOC - Permit Expired | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/8/2014 | 8/8/2014 | 8/8/2014 | | PASS |
Dave Hannah
|
|
|
|
BLD - Request for Extension | 3/30/2012 | 3/30/2012 | 4/2/2012 | P | PASS |
Dave Hannah
|
|
|
karen Phone #: ###-####
|
BLD-Energy code compliance | 1/20/2012 | 1/20/2012 | 1/20/2012 | A | PASS |
Dave Hannah
|
|
|
Karen ###-####
|
Routing Walk-In (BLD) | 1/19/2012 | 1/19/2012 | 1/19/2012 | P | DONE |
Perry Paine
|
|
|
|
Case Summary (BLD) | | | 1/19/2012 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/19/2012 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
Issue PAID IN FULL permit | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 1/19/2012 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Framing/Rough-in | 1/17/2012 | 1/18/2012 | 1/18/2012 | A | PART |
Dave Hannah
|
|
|
karen Phone #: ###-#### ok to insulate after elec r/i needs to resubmit plans for mod
|
BLD-Framing/Rough-in | 10/28/2011 | 10/28/2011 | 10/31/2011 | P | NR |
Dave Hannah
|
|
|
Karen Phone #: ###-#### fire place waiting on mec r/i
|
BLD-Framing/Rough-in | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | PASS |
Dave Hannah
|
|
|
early as poss//Karen ( ###-#### cell) Phone #: ###-####
|
BLD-Framing/Rough-in | 10/25/2011 | 10/26/2011 | 10/26/2011 | A | PART |
Dave Hannah
|
|
|
karen - please call 1/2 hr prior Phone #: ###-#### ok to insulate needs fire blocking fron addition at top of furred out walls
|
BLD-Foundation | 9/9/2011 | 9/12/2011 | 9/12/2011 | A | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Foundation | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PASS |
Dave Hannah
|
|
|
jared Phone #: ###-####
|
BLD-Concrete | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | PART |
Dave Hannah
|
|
|
after 10:30 //Karen Phone #: ###-#### steel columns ok
|
BLD-Footing | 9/1/2011 | 9/2/2011 | 9/2/2011 | A | PART |
Dave Hannah
|
|
|
jared Phone #: ###-####site backs good crew still needs ti set rebar
|
PubWorks Subgrade Approval | 9/2/2011 | 9/2/2011 | 9/2/2011 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 8/15/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/4/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 8/4/2011 | | DONE |
Barbara Stitt
|
|
|
Called Karen and told her that permit is ready & fees due on 8-4-11 & fees due on 8-4-11 @ 8:15am//BAS
|
Plan assigned to (PEP) | 8/3/2011 | 8/3/2011 | 8/3/2011 | | PASS |
Perry Paine
|
|
|
|
Routing Walk-In (BLD) | 8/1/2011 | 8/1/2011 | 8/3/2011 | A | DONE |
Perry Paine
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/3/2011 | | |
|
|
|
|
1st review completed | | | 8/3/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/3/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/3/2011 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/1/2011 | | 8/2/2011 | | PASS |
Steven Webb
|
|
|
ESC plan waiver request is approved according to the ESC Permit conditions. ESC11-00538
|
Routing Walk-In (PW Hillside) | 8/1/2011 | 8/1/2011 | 8/1/2011 | A | PASS |
Colleen T Carroll
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
|
Routing Walk-In (Zoning) | 8/1/2011 | 8/1/2011 | 8/1/2011 | A | DONE |
Joan Johnson
|
|
|
|
Application received | | 8/1/2011 | | | |
|
|
|
|