First Notice | 10/19/2011 | 10/19/2011 | 11/7/2011 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 10/18/2011 | 10/19/2011 | 10/19/2011 | A | PASS |
Mike Jordan
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | 10/19/2011 | 10/19/2011 | 10/19/2011 | P | PASS |
Mike Jordan
|
|
|
Certificate of completion was issued.
|
BLD-Final | 10/17/2011 | 10/18/2011 | 10/18/2011 | A | NR |
Mike Jordan
|
|
|
KEVIN Phone #: ###-####. Needs mech. final.
|
FIRE-Final Inspection | 10/13/2011 | 10/17/2011 | 10/17/2011 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | CANC |
Troy Cobbley
|
|
|
Rescheduled for monday morning.
|
FIRE-Final Inspection | 10/10/2011 | 10/11/2011 | 10/11/2011 | A | FAIL |
Troy Cobbley
|
|
|
My contact, Kevin, did not know where the correct breakers were for the emergency lights /exit signs. No testing was performed. Will need to be rescheduled.
|
BLD-Final | 9/27/2011 | 9/28/2011 | 9/28/2011 | P | NR |
Mike Jordan
|
|
|
jim Phone #: ###-####.
|
FIRE-Final Inspection | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | FAIL |
Troy Cobbley
|
|
|
Repair the existing exit signs and emergency lights. Also clear the access to the east exit door.
|
BLD-Framing/Rough-in | 9/14/2011 | 9/15/2011 | 9/14/2011 | A | PASS |
Mike Jordan
|
|
|
Tim Phone #: ###-####. Exterior wood framing for new ATM machine.
|
BLD-Footing | 9/12/2011 | 9/12/2011 | 9/12/2011 | P | PASS |
Mike Jordan
|
|
|
Tim Sparks Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/25/2011 | | DONE |
Barbara Stitt
|
|
|
|
OVERRIDE | | | 8/18/2011 | | |
|
|
|
|
Plan assigned to (CDM) | 8/12/2011 | | 8/18/2011 | | PASS |
Carl D Madsen
|
|
|
Make sure planning doesn't need anything. If they do contact Kevin at Steed.
|
Routing - PLAN CHECK | 8/5/2011 | | 8/18/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLANNING | 8/18/2011 | | 8/18/2011 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 8/18/2011 | | 8/18/2011 | | PASS |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/18/2011 | | DONE |
|
|
|
|
Routing - FIRE | | | 8/18/2011 | | PASS |
|
|
|
Verify in field CDM
|
Case Summary (BLD) | | | 8/18/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/18/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/18/2011 | | DONE |
Christina Prado
|
|
|
Called and left message for Chris giving fees due and advising permit is ready
|
Permit Ready to Issue | | | 8/18/2011 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 8/16/2011 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 8/4/2011 | | 8/12/2011 | | DEFR |
Tim L. Woodard
|
|
|
Defered review to Carl M.
|
Routing PW Sewer Rating | 8/5/2011 | | 8/5/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 8/4/2011 | | 8/5/2011 | | PASS |
|
|
|
|
Routing - Addressing | 8/4/2011 | | 8/4/2011 | | PASS |
Terry Records
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/4/2011 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/4/2011 | | DONE |
|
|
|
ok per Tim Woodard to take in as a level 2
|
Application received | | 8/3/2011 | | | |
|
|
|
|