Permit Information
Permit NumberBLD11-01879
StatusFinaled
Name SCOT MCGAVIN
Site Address 1605 S PHILLIPPI ST
Project NamePuentes Language Programs
Customer Number 
ePlanReviewYes
Description
(PUENTES LANGUAGE PROGRAMS DBA/PUENTES SPANISH PRESCHOOL) Occupancy use change from "B" - Office building to "E" - Intermediate daycare facility with a maximum occupant load of 20 children + 4 staff as regulated by CAA11-00131 and submitted T.I. Application. To remodel the upstairs of this building for use as a new intermediate child care tenant, a 2,500 sq. ft. space located on the 1st story of an existing building per approved plans. An area of 1,530 sq. ft. is usable for child care functions. Work to include: complete interior demolition work per plans; construct new interior walls to create: class rooms, office, kitchen, dining, reception, two fully accessible male and female restrooms, and storage areas; modifications within existing space to install: interior ramps, structural work including beams, header, and footings per engineering; accessible HI-LO drinking fountain(s), install a service sink; upgrades to provide handicap accessiblility to existing building, door modifications and associated hardware, related interior finishes in compliance with chapter 8 of the 2009 IBC; and electrical, mechanical and plumbing work. Modifications to the exterior will include: exterior accessible ramps and handrails; new exterior stair and handrails; infill exterior wall door opening. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agancies approvals. This building is NOT fire sprinklered. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. The downstairs is approved for a Single Family Dwelling under permit number 1027217. Certificate of Occupancy card updated on 7-25-2013. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing PW Sewer Rating8/11/2011 12/16/2014 PASS
DetailsBeverly Mountain
Case Summary (BLD)  11/17/2014 DONE
Meeting  11/17/2014 DONE
DetailsSam Zahorka
Met with Mr. Scot McGavin about a possible change to the front 280 SF room from office use to daycare. I requested him to submit a letter describing the age and number of children proposed for this room. I also requested him to submit a T.I. when he is ready to make this partial occupancy change. I walked him over to Planning and Zoning and requested he check with the City Clerk to modify his business license due to the occupant load change. Alterations for building code compliance will be required for this change. I made him aware of this and let him know a T.I. is required.
Plan Reviewer's activity  7/25/2013 DONE
DetailsSam Zahorka
The basment was permitted and approved for a Single Family Dwelling under BLD1027217. This permit only changed the occupancy for the upstairs from a Business occupancy to an Educational Occupancy. The Occupancy card was revised to show the approved R-3 occupancy in the Basement. Updated occupancy card emailed to Scott Mcgavin the building owner and Gordon with Boise Fire. SRZ
Permanent Occupancy  7/25/2013 DONE
DetailsTisha Gallop
reprinted cert of occ to include the R occupancy in the basement.
Telephone call  7/25/2013 DONE
DetailsSam Zahorka
Called Gordon the Fire inspector and informed him of the new occupancy card that includes the approved Single Family Dwelling in the basement of this building.
Case Summary (BLD)  12/5/2012  
Third Notice 1/22/20121/31/2012 DONE
DetailsChristina Prado
Done 1-31-12
Second Notice 12/30/20111/17/2012 DONE
DetailsChristina Prado
mailed 1-18-2012
First Notice 12/19/201112/20/2011 DONE
DetailsChristina Prado
mailed 12-21-2011
Plan Reviewer's activity  12/9/2011 DONE
DetailsSam Zahorka
Received CUP11-00064 / 5405 W. Overland Road from applicant. This approval increased the occupant load to a maximum of 45. Attached the CUP to documents, issued a new certificate of occupancy with the name change and new occupant load.
Meeting  12/9/2011 DONE
DetailsTisha Gallop
at issuance of permanent occupancy correct name of business is "Puentes Language Programs" dba "Puentes Spanish Preschool". Architect submitted plans with just the owner's last name with daycare.
Case Summary (BLD)  12/9/2011 DONE
DetailsTisha Gallop
Change Expiration Date Only  11/17/2011 DONE
DetailsBarbara Stitt
BLD-Final11/7/201111/8/201111/8/2011PPASS
DetailsTom Arcoraci
TRUDY-PLEASE CALL PRIOR TO INSPECTION Phone #: ###-####
BLD-Final9/30/20119/30/20119/30/2011PPART
DetailsTom Arcoraci
ok for temp occ needs to finish bath rooms
FIRE-Final Inspection9/30/20119/30/20119/30/2011PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection9/29/20119/30/20119/30/2011AFAIL
DetailsTroy Cobbley
Provide smoke detector at the north exit as per plans and provide the required exit sign/emergency lighting and exit discharge lighting per plans. Per Sam the exit signs in the classrooms can be deleted since the occupant load does not exceed 10.
Temporary Occupancy UNPAID FEE  9/30/2011 DONE
DetailsTisha Gallop
FIRE-Conference9/27/20119/28/20119/28/2011ADONE
DetailsTroy Cobbley
I went over life safety requirements with Trudy. One smoke alarm needs to be added at the bottom of the stairs. Also per Sam exit discharge lighting and interior emergency lighting is required.
Zoning Approval9/28/20119/28/20119/28/2011 PASS
DetailsJosh Wilson
Ok Dave Moser and Josh Wilson
BLD-Framing/Rough-in9/20/20119/21/20119/21/2011ANR
DetailsTom Arcoraci
scott Phone #: ###-####
BLD-Framing/Rough-in9/20/20119/21/20119/21/2011PPART
DetailsTom Arcoraci
ok pending ok of cant beam
BLD-Conference9/15/20119/16/20119/16/2011PPASS
DetailsTom Arcoraci
Telephone call  9/12/2011 DONE
t/c w scott - permit ready and fees given
Permit Ready to Issue  9/12/2011 DONE
Details
Print Occupancy Form  9/12/2011 DONE
Issue PAID IN FULL permit  9/12/2011 DONE
DetailsChristina Prado
Case Summary (BLD)  9/9/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/9/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK9/9/2011 9/9/2011 PASS
DetailsSam Zahorka
Plan assigned to (SRZ)8/23/2011 9/9/2011 PASS
DetailsSam Zahorka
Plans ACCEPTED BY PLAN CHECK  9/7/2011 DONE
DetailsSam Zahorka
Project Dox / ePlan review - Received uploaded plan submittal sheets: SP1.0, LSP0.1, ASC0.0, A5.0, A3.0, A2.2, and 4 small docs. ACHD, Engineering letter, Structural load doc, and Day care load doc.
Routing - PLAN CHECK8/23/2011 8/30/2011 FAIL
DetailsSam Zahorka
Corrections sent to Architect.
Case Summary (BLD)  8/25/2011 DONE
Routing - PLANNING8/11/2011 8/23/2011 PASS
DetailsDavid Moser
David Moser - CAA11-00131
1st review completed  8/23/2011 FAIL
Failed Plan Check
Plan assigned to (DRS)8/11/2011 8/23/2011 DEFR
DetailsDan Stuart
Plan reassigned to Sam Zahorka.
Routing - PLAN CHECK8/11/2011 8/23/2011 DEFR
DetailsDan Stuart
Plan reassigned to Sam Zahorka.
Routing - FIRE8/23/2011 8/23/2011 PASS
DetailsScott Arellano
No comments attached.
Routing - PUBLIC WORKS8/11/2011 8/22/2011 PASS
DetailsBeverly Mountain
Routing - Design Review8/11/2011 8/16/2011 PASS
DetailsJosh Wilson
Josh Wilson- CZC11-00178- ok per redlines sheet SP1.0
Routing - Erosion and Sediment8/11/2011 8/15/2011 PASS
DetailsSteven Webb
ESC11-00577 plan waiver approved with conditions attached to the permit.
Routing - Addressing8/11/2011 8/12/2011 PASS
DetailsApril Wing
Address changed from 5405 W Overland Rd to 1605 S Phillippi St
Pending Assignment by JCB8/10/2011 8/11/2011 DONE
DetailsJason Blais
Intake Approval  8/10/2011 FAIL
DetailsTim L. Woodard
Intake failed due to missing items required by the submittal checklist. TLW
Intake Approval  8/10/2011 PASS
DetailsTim L. Woodard
After a discussion with Jason it was decided to approve the intake after the acitivities that are neccessary from Stan Cole are completed. This is a pilot poject and all additional items will be called by the plan reviewer during the review. TLW
Telephone call  8/10/2011 DONE
sent email to stan cole regarding plan check fee payment
Application received 8/8/2011