Second Notice | | 11/17/2011 | 11/21/2011 | | DONE |
|
|
|
|
First Notice | 10/24/2011 | 10/24/2011 | 11/7/2011 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | CANC |
Mike Jordan
|
|
|
Jeffrey Phone #: ###-####
|
BLD-Final | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | PASS |
Mike Jordan
|
|
|
Certificate of completion was issued.
|
BLD-Final | 10/17/2011 | 10/18/2011 | 10/18/2011 | P | NR |
Mike Jordan
|
|
|
rocco Phone #: ###-####. Needs electrical final.
|
FIRE-Final Inspection | 10/18/2011 | 10/18/2011 | 10/18/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 10/17/2011 | 10/17/2011 | 10/17/2011 | P | FAIL |
Troy Cobbley
|
|
|
Provide functional testing of the smoke evac system. Provide fire extinguisher and repair the emergency lighting.
|
BLD-Framing/Rough-in | 9/20/2011 | 9/21/2011 | 9/21/2011 | A | PASS |
Mike Jordan
|
|
|
rocco - ###-####Interior steel stud framing for storefront ant hardlid/soffit framing for "cloud".
|
CHANGE STATUS TO (ISS) | | | 9/21/2011 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
(F) Reprint permit | | | 9/21/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 9/16/2011 | | 9/20/2011 | | DONE |
Tim L. Woodard
|
|
|
Plan modification approved with redline to not attach to Mall Bulkhead. This redline was also discussed with Robert Quintana (Architect). TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 9/20/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2011 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2011 | | DONE |
Christina Prado
|
|
|
Called and spoke to Robert, gave fees due
|
Permit Ready to Issue | | | 9/20/2011 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 9/15/2011 | 9/16/2011 | 9/16/2011 | P | PASS |
Mike Jordan
|
|
|
Rocco Phone #: ###-####. Blow patches in fire partition have been repaired.
|
Plan Modification Accepted | | | 9/16/2011 | | |
|
|
|
Plan modification accepted to revise the lighting and store front. Submitted sheets A-6, A-7, E-1, Interior lighting compliance certificate & worksheet. No change in value.
|
BLD-Framing/Rough-in | 9/14/2011 | 9/15/2011 | 9/15/2011 | P | PASS |
Mike Jordan
|
|
|
rocko Phone #: ###-####. Interior steel stud framed walls, no grid or storefront.
|
Inspection Record Card- Bld | | | 9/13/2011 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/25/2011 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/24/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/24/2011 | | DONE |
Christina Prado
|
|
|
Called and spoke with Robert about permit fees due and GC requirement
|
Override - Parcel Holds | | | 8/24/2011 | | |
|
|
|
|
Permit Ready to Issue | | | 8/24/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (TLW) | 8/10/2011 | | 8/23/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - PLAN CHECK | 8/10/2011 | | 8/23/2011 | | PASS |
Tim L. Woodard
|
|
|
Approved with modified lighting compliance attached to plans. Tim Woodard
|
1st review completed | | | 8/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 8/23/2011 | | DONE |
Tim L. Woodard
|
|
|
|
Intake Approval | | | 8/10/2011 | | PASS |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2011 | | DONE |
Barbara Stitt
|
|
|
|
Application received | | 8/9/2011 | 8/9/2011 | | DONE |
|
|
|
|
Intake Approval | | | 8/9/2011 | | FAIL |
Tim L. Woodard
|
|
|
Called architect. Mailed in submission missing application paper work. TLW
|