Second Notice | | 4/8/2012 | 4/10/2012 | | DONE |
|
|
|
|
First Notice | | 3/19/2012 | 3/30/2012 | | DONE |
|
|
|
faxed to AEI
|
Permanent Occupancy | | | 3/9/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 3/8/2012 | | DONE |
Tisha Gallop
|
|
|
called AEI and talked to Dan about not turning in occ card yet, he said has it signed off by ACHD and will come in tomorrow to get occ cert.
|
FIRE-Final Inspection | 1/13/2012 | 1/13/2012 | 1/13/2012 | A | PASS |
Forrest France
|
|
|
|
FIRE-Final Inspection | 1/12/2012 | 1/12/2012 | 1/12/2012 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 1/11/2012 | 1/11/2012 | 1/11/2012 | A | PEND |
Forrest France
|
|
|
Final pending project related fire alarm panel repair work.
|
FIRE-Final Inspection | 12/27/2011 | 12/28/2011 | 12/28/2011 | A | NR |
Forrest France
|
|
|
Final pending project related fire alarm permit work.
|
BLD-Final | 12/28/2011 | 12/28/2011 | 12/28/2011 | P | PASS |
Jim Storey
|
|
|
Dan Phone #: ###-#### final ok pending fire and achd sign offs.
|
FIRE-Final Inspection | 12/23/2011 | 12/23/2011 | 12/23/2011 | P | NR |
Forrest France
|
|
|
|
PubWorks Occupancy Approval | 12/15/2011 | 12/15/2011 | 12/15/2011 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Conference | 12/14/2011 | 12/14/2011 | 12/14/2011 | P | DONE |
Forrest France
|
|
|
On site conference regarding fire code review notes, life safety items, fire alarm permit application for new tamper switch monitoring at the control vavles for the fire protection DCVA, etc.
|
Zoning Approval | 12/13/2011 | 12/13/2011 | 12/13/2011 | | DONE |
Josh Wilson
|
|
|
|
BLD-Framing/Rough-in | 11/17/2011 | 11/17/2011 | 11/17/2011 | P | PASS |
Jim Storey
|
|
|
dan Phone #: ###-#### water proffing verivied will check upon aplacation has begun.
|
BLD-Footing | 9/8/2011 | 9/9/2011 | 9/9/2011 | A | PASS |
Dave Hannah
|
|
|
Dan Phone #: ###-#### allcolumn ftgs ok to place concrete
|
Telephone call | | | 9/8/2011 | | DONE |
Christina Prado
|
|
|
Left a message for Dan giving fees due and advising on ACHD letter requirement
|
Permit Ready to Issue | | | 9/8/2011 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 9/8/2011 | | DONE |
Tisha Gallop
|
|
|
Dan called office and I told him permit fees due and need ACHD.
|
Issue PAID IN FULL permit | | | 9/8/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - FIRE | 9/6/2011 | | 9/7/2011 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans.
|
Routing - PLAN CHECK | 9/7/2011 | | 9/7/2011 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/7/2011 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 9/7/2011 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/15/2011 | | 9/7/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 9/1/2011 | | 9/6/2011 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 9/6/2011 | | DONE |
Christina Prado
|
|
|
Received three copies of plans A1.1 & A1.2.4- two sets inserted into plans by arch rep as well as one transmittal letter. The third set will be rolled up along with replaced sheets. Plans given back to John Menard for further review
|
Routing - FIRE | 8/30/2011 | 8/30/2011 | 9/1/2011 | | FAIL |
Scott Arellano
|
|
|
Emailed resubmittal items to architect. No fax number provided.
|
Routing Off Site - STRUCTURAL | 8/15/2011 | | 9/1/2011 | | PASS |
John Menard
|
|
|
8-15-11 called Action Couriers for pick up - Received letter from consulting structural engineer approving the structural portion of this project. JCM
|
1st review completed | | | 9/1/2011 | | FAIL |
|
|
|
Failed Fire
|
Route to Impact Fee Review | 8/30/2011 | 9/2/2011 | 8/31/2011 | | PASS |
Cindy M. Gould
|
|
|
|
Plan Reviewer's activity | | | 8/30/2011 | | PASS |
John Menard
|
|
|
Approved with attached clarifications. JCM
|
Routing - PLAN CHECK | 8/25/2011 | | 8/30/2011 | | PASS |
John Menard
|
|
|
|
Routing - PLANNING | 8/25/2011 | | 8/25/2011 | | PASS |
Josh Wilson
|
|
|
OK per DRH11-00125
|
Routing - PLUMBING | 8/24/2011 | | 8/25/2011 | | PASS |
Daryl Spivey
|
|
|
No new plumbing was done. Restrooms are existing.
|
Routing - Erosion and Sediment | 8/22/2011 | | 8/24/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00579 plan approved with conditions attached to the permit.
|
Routing - PUBLIC WORKS | 8/16/2011 | | 8/22/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing PW Drainage | 8/16/2011 | | 8/22/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 8/22/2011 | | 8/22/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/16/2011 | | 8/16/2011 | | PASS |
Terry Records
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/16/2011 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 8/16/2011 | | 8/16/2011 | | PASS |
Todd Tucker
|
|
|
|
Pending Assignment by JCM | 8/15/2011 | | 8/15/2011 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 8/10/2011 | | PASS |
|
|
|
OK to submit for permit
|
Application received | | 8/10/2011 | | | |
|
|
|
|