Case Summary (BLD) | | | 6/21/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
DOC - Permit Expired | | | 6/21/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
as per Brian Murphy this permit needs expired
|
BLD-Aging Inspection | 3/31/2016 | 3/31/2016 | 3/31/2016 | | FAIL |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 3/30/2016 | 3/30/2016 | 3/30/2016 | | FAIL |
Jim Storey
|
|
|
Jeff Phone #: ###-#### Brian Murphy said it’s too late for them to do an inspection so PW will NOT approve it. He said he would (possibly) accept a letter from the engineer that he saw everything go in and it was installed per plan… but the possibly because it was so long ago. If they are going to go that route the engineer should call Brian to see what he wants on the letter.
|
BLD-Aging Inspection | 12/21/2015 | 12/21/2015 | 12/21/2015 | | FAIL |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 12/18/2015 | 12/18/2015 | 12/18/2015 | | FAIL |
Jim Storey
|
|
|
Jeff Phone #: ###-#### Brian Murphy said it’s too late for them to do an inspection so PW will NOT approve it. He said he would (possibly) accept a letter from the engineer that he saw everything go in and it was installed per plan… but the possibly because it was so long ago. If they are going to go that route the engineer should call Brian to see what he wants on the letter.
|
BLD-Aging Inspection | 12/17/2015 | 12/17/2015 | 12/17/2015 | | FAIL |
Jim Storey
|
|
|
Jeff Phone #: ###-#### Brian Murphy said it’s too late for them to do an inspection so PW will NOT approve it. He said he would (possibly) accept a letter from the engineer that he saw everything go in and it was installed per plan… but the possibly because it was so long ago. If they are going to go that route the engineer should call Brian to see what he wants on the letter.
|
BLD-Final | 11/13/2015 | 11/13/2015 | 11/17/2015 | P | FAIL |
Jim Storey
|
|
|
Jeff Phone #: ###-#### Brian Murphy said it’s too late for them to do an inspection so PW will NOT approve it. He said he would (possibly) accept a letter from the engineer that he saw everything go in and it was installed per plan… but the possibly because it was so long ago. If they are going to go that route the engineer should call Brian to see what he wants on the letter. Or the permit expires…… Tisha Gallop City of Boise ###-####
|
BLD-Aging Inspection | 11/10/2015 | 11/10/2015 | 11/12/2015 | | NR |
Jim Storey
|
|
|
pw and ele
|
BLD-Aging Inspection | 8/11/2015 | 8/11/2015 | 8/11/2015 | | DEFR |
Jim Storey
|
|
|
pw and ele
|
BLD-Aging Inspection | 4/14/2015 | 4/14/2015 | 4/14/2015 | | DEFR |
Jim Storey
|
|
|
pw and ele
|
BLD-Aging Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 | | PASS |
Jim Storey
|
|
|
|
Issue PAID IN FULL permit | | | 8/23/2011 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
called Mark Owens and left vm permit is ready and fees.
|
Plan assigned to (LEG) Tisha | 8/11/2011 | | 8/22/2011 | | DONE |
Tisha Gallop
|
|
|
office copy taken to records dept.
|
Routing - PLAN CHECK | 8/19/2011 | | 8/22/2011 | | PASS |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 8/19/2011 | | 8/19/2011 | | PASS |
Sarah Schafer
|
|
|
Approved.
|
Routing - Erosion and Sediment | 8/18/2011 | | 8/19/2011 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
Routing PW Drainage | 8/15/2011 | | 8/18/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - PUBLIC WORKS | 8/15/2011 | | 8/18/2011 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 8/15/2011 | | 8/15/2011 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING Land Div | 8/11/2011 | | 8/15/2011 | | PASS |
Dave Abo
|
|
|
Parcel over 5 acres in size.
|
Application received | | 8/10/2011 | 8/11/2011 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 8/11/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2011 | | DONE |
Tisha Gallop
|
|
|
Per Scott A. n/a Fire Review
|
Intake Approval | | | 8/10/2011 | | PASS |
Tisha Gallop
|
|
|
|