Permit Information
Permit NumberBLD11-01934
StatusFinaled
Name HCD INC
Site Address 8083 W FAIRVIEW AVE
Project NameKIM'S KARE-A-LOT
Customer Number 
ePlanReviewNo
Description
(KIM'S KARE-A-LOT) New daycare tenant in existing 5,310 sq. ft. space within existing strip mall shopping center. Work to include select non-structural demolition; construction of a 2-hour fire-resistive Fire Wall to divide existing building for compliance with allowable area; modify front exterior wall and overhang projection to be 1-hour fire resistive construction with 3/4 hour rated windows, doors and hardware in the front wall on both sides of fire wall for the depth of the projection (approx. 10'); remove indicated interior windows and replace with safety glass; modify all interior doors & openings to provide 32" clear width; lever hardware on interior doors. This tenant space will be separated on north side from other tenants with newly constructed 2-hour fire wall. NOTE: This building is fully fire sprinklered for area increase. drs CUP11-00035 X-REF CUP10-00017
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/8/20123/30/2012 DONE
BLD-Final2/27/20122/27/20122/27/2012PPASS
DetailsMike Jordan
Junior Phone #: ###-####. ok for perm occ.
Permanent Occupancy  2/27/2012  
DetailsBarbara Stitt
Temporary Occupancy2/17/20125/17/20122/17/2012 DONE
DetailsJason Blais
BLD-Aging Inspection1/23/20121/23/20121/25/2012 DONE
DetailsMike Jordan
Spoke to Junior with HCD, he noted that rated glazing should be here by the end of Jan 2012.
BLD-Final11/21/201111/22/201111/22/2011APART
DetailsMike Jordan
Please call 30 min before thanks Phone #: ###-#### >> Inspection requested via web by Les Seal. Ok for temp occ. only. Will be ok for perm occ. once plumbing is perm. and firerated glazing is installed in place of temp. 1hr. wall.
Temporary Occupancy11/22/20112/20/201211/22/2011 DONE
DetailsBarbara Stitt
BLD-Final11/21/201111/21/201111/21/2011PNR
DetailsMike Jordan
junior Phone #: ###-####
FIRE-Final Inspection11/21/201111/21/201111/21/2011PPASS
DetailsTroy Cobbley
life safety passed.
BLD-Conference11/18/201111/18/201111/18/2011PDONE
DetailsMike Jordan
junior Phone #: ###-####
FIRE-Conference11/17/201111/17/201111/17/2011PDONE
DetailsTroy Cobbley
For a final on this project we need to test the smoke alarms, exit signs/emergency lights, and verify hardware.
BLD-Final11/14/201111/14/201111/14/2011PCANC
DetailsMike Jordan
Please call junior 30 min before Phone #: ###-#### >> Inspection requested via web by Les Seal. Cancelled by contractor via phone call.
FIRE-Conference11/14/201111/14/201111/14/2011ADONE
DetailsTroy Cobbley
I went over life safety notes with JR.
BLD-Framing/Rough-in11/1/201111/1/201111/1/2011PPASS
DetailsMike Jordan
junior - late afternoon please Phone #: ###-####. double layer 5/8 type x at canopy lid ok.
BLD-Wall cover11/1/201111/1/201111/1/2011APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Les Seal. Structural beam in canopy wrap with 5/8 type x rock, 2 layers ok.
BLD-Wall cover10/24/201110/25/201110/25/2011APASS
DetailsMike Jordan
Please call junior 30 min before thanks Phone #: ###-#### >> Inspection requested via web by Les Seal
BLD-Conference10/24/201110/25/201110/25/2011ADONE
DetailsMike Jordan
Please call junior 30 min before thanks Phone #: ###-#### >> Inspection requested via web by Les Seal. Conferance on canopy protection.
BLD-Framing/Rough-in10/19/201110/20/201110/20/2011APASS
DetailsJim Storey
Dennis-dry wall inspection Phone #: ###-#### gyp ok/ col rapped and ok to continue 2nd layer on north side. roof framing ok to cover glb still needs 48" gyp wrap and 2x4 removed from 2 hr wall penatrations will need fire stopped.
Issue PAID IN FULL permit  10/19/2011 DONE
DetailsBarbara Stitt
Routing - PLAN CHECK10/14/2011 10/18/2011 PASS
DetailsDan Stuart
Attached plan review comments and redlined notes on plans from all reviewing agencies are part of the reviewed approved plan and require compliance. Plans to permit desk to issue.
Plan Reviewer's activity  10/18/2011 DONE
Letter of explanation from architect concerning temporary 1-hour wall to north of 2-hr fire wall until 3/4 hour rated glazing and frames arrive for installation. A temporary occupancy is allowed when all required work is completed and temporary 1-hour wall is in place. Final C.O. to be issued after rated glazing is installed and approved by inspection.
PLANS/APPL TAKEN TO FRONT DESK  10/18/2011 PASS
DetailsDan Stuart
Print Occupancy Form  10/18/2011 DONE
Permit Ready to Issue  10/18/2011 DONE
DetailsTisha Gallop
Telephone call  10/18/2011 DONE
DetailsTisha Gallop
called Jeff and left message w/Dave that permit is ready, fees, and need GC/RCE/form.
Plan assigned to (DRS)8/12/2011 10/18/2011 PASS
DetailsDan Stuart
Plan resubmittals received  10/14/2011 DONE
10-14-11 received 1 transmittal1 response,and 2 copies of sheets G1.1,G1.2,G1.3,A1.1,A1.2 sent to Dan S.
Plan resubmittals received  10/7/2011  
Received 1 cover transmitall, 1 copy of letter to Dan Stuart dated 10-7-11 from Jeff Likes, 1 copy of Alternate Request dated 10-7-11, 1 copy calcs, 2 copies of sheets G1.1, G1.2, G1.3, A1.1, A1.2, A1.3 and taken to Dan Stuart
Meeting  9/27/2011 DONE
Met with strcural inspector Mike jordan to review the plans for the 2-hour fire wall being created as the north wall of the new tenant, Kim's Kare-A-Lot Childcare, to clarify requirements and suggest a pre-constrcution conference with the contractor to verify code requirements for this scope of work as part of the tenant improvement to establish a certificate of occupancy.
Telephone call  9/27/2011 DONE
Talked W/ Jeff Likes to review e-mail of plan changes to verify needed information had been provided on plans. jeff brining in resubmittals this afternoon.
Case Summary (BLD)  9/27/2011  
Routing - PLAN CHECK9/13/2011 9/26/2011 FAIL
DetailsDan Stuart
Plan resubmittals of 9/23/11 did not indicate corrections needed as reviewed on 9/9/11 in meeting W Jeff Likes and Dan Stuart. Resubmittals requested.
Plan resubmittals requested  9/26/2011 DONE
Called Jeff Likes and reviewed items remaining to be corrected or clarified on the plans.
Plan resubmittals received  9/23/2011 DONE
DetailsChristina Prado
Received three full new sets of plans G1.1, G1.2, G1.3, A1.1 and A1.2. Plans given to Dan Stuart for review
Telephone call  9/20/2011 DONE
Called Jeff Likes to review code items needing corrected or to be shown on plan resubmittals. 2hr fire wall labeling, 2-hour continuous through the frame walls above the CMU into canopy and back wall, change note on plans to indicate support wall and glazing along line of store front needs to be 1-hour / 3/4 hour glazing 10' on each side of fire wall (depth of the canopy overhang. Detail for protection of 2 hour fire wall on interior side of tenant spaces (wrapp bottom of truss' & up side to deck at minimum 4 feet.
Routing - FIRE9/8/20119/8/20119/13/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans. Seerate Fire Sprinkler and Fire Alarm permits are required.
1st review completed  9/13/2011 FAIL
Failed Plan Check
Meeting  9/9/2011 DONE
Jeff and I met in conf. room #1. I brought the submitted plans I had marked up with concerns that did not allow the completion of the plans review. Jeff brought a copy of the plans that we could mark up and sketch on for use in providing new plan sheets.
Route to Impact Fee Review9/8/20119/13/20119/8/2011 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Plan Reviewer's activity  9/8/2011 DONE
Set up meeting with architect to review plans and missing data to show method of providing code compliance for this project. Plans to incomplete to provide detailed plan review. Copy of cursory plan review notes e-mailed to architect so he can prepare for meeting at 8:30 AM on 9/9/11.
Routing - PLAN CHECK8/15/2011 9/8/2011 FAIL
DetailsDan Stuart
Plans & details are incomplete. Contacted Jeff Likes and set up appointment to sit down with him and review plans for requirements. We are meeting at 8:30 AM Friday 9/9/11.
Plan resubmittals requested  9/8/2011 DONE
Routing - PUBLIC WORKS8/15/2011 8/15/2011 PASS
DetailsBeverly Mountain
Routing - PLANNING8/15/2011 8/15/2011 PASS
DetailsDavid Moser
David Moser - CUP11-00035
Plan resubmittals received  8/15/2011 DONE
DetailsJason Blais
Received CDHD Child Care Plan Review & Approval form.
Routing - Addressing8/15/2011 8/15/2011 PASS
DetailsTerry Records
Pending Assignment by JCB8/12/2011 8/12/2011 DONE
DetailsJason Blais
Application received 8/11/20118/11/2011 DONE
DetailsBarbara Stitt
Intake Approval  8/11/2011 PASS
Plans ACCEPTED BY PLAN TECH  8/11/2011 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  8/11/2011 DONE
DetailsBarbara Stitt