Permanent Occupancy | | | 1/31/2013 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 1/14/2013 | 1/15/2013 | 1/15/2013 | A | PASS |
Jim Sly
|
|
|
mary ann Phone #: ###-#### OK fpr Perm Occ.
|
BLD-Conference | 10/31/2012 | 10/31/2012 | 10/31/2012 | P | DONE |
Jim Sly
|
|
|
Issued correction notice. Need to obtain Certificate of Occupancy.
|
BLD-Final | 10/30/2012 | 10/31/2012 | 10/31/2012 | A | CANC |
Jim Sly
|
|
|
Mike check back. Re-sched.....
|
BLD-Final | 10/26/2012 | 10/30/2012 | 10/30/2012 | P | CANC |
Jim Sly
|
|
|
Check back....
|
BLD-Final | 10/25/2012 | 10/26/2012 | 10/26/2012 | P | CANC |
Jim Sly
|
|
|
Re-sched....
|
BLD-Final | 10/25/2012 | 10/26/2012 | 10/25/2012 | P | CANC |
Jim Sly
|
|
|
|
BLD-Final | 10/25/2012 | 10/25/2012 | 10/25/2012 | P | CANC |
Jim Sly
|
|
|
Re-sched....
|
FIRE-Conference | 8/29/2011 | 8/29/2011 | 8/29/2011 | P | DONE |
Forrest France
|
|
|
Regarding plan review red-line notes and door hardware requirements.
|
BLD-Final | 8/24/2011 | 8/25/2011 | 8/26/2011 | P | NR |
Jim Sly
|
|
|
Brent Galvan Phone #: ###-#### NR,,,,,,,Need fire final
|
FIRE-Final Inspection | 8/24/2011 | 8/25/2011 | 8/25/2011 | A | PASS |
Forrest France
|
|
|
Fire life safety final passed pending installation of approved hardware at the second exit door per plan review comments. Structural inspector to verify prior to final.
|
Issue PAID IN FULL permit | | | 8/24/2011 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 8/12/2011 | 8/12/2011 | 8/19/2011 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 8/12/2011 | | 8/19/2011 | | PASS |
Carl D Madsen
|
|
|
Carl Madsen
|
1st review completed | | | 8/19/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/19/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2011 | | |
|
|
|
|
Print Occupancy Form | | | 8/19/2011 | | DONE |
|
|
|
|
Telephone call | | | 8/19/2011 | | DONE |
|
|
|
t/c w kristine - permit ready
|
Permit Ready to Issue | | | 8/19/2011 | | DONE |
|
|
|
|
Application received | | 8/12/2011 | 8/12/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/12/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PUBLIC WORKS | 8/12/2011 | | 8/12/2011 | | PASS |
Barbara Stitt
|
|
|
Verified with Bev that public works does not need to review this plan//8-12-11BAS
|
First Notice | | 2/10/2013 | | | |
|
|
|
|