First Notice | 2/11/2014 | 2/11/2014 | 3/5/2014 | | DONE |
Jim Storey
|
|
|
Mailed 3-5-14
|
PubWorks Occupancy Approval | 2/12/2014 | 2/12/2014 | 2/12/2014 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Forrest France
|
|
|
|
Zoning Approval | 11/1/2013 | 11/1/2013 | 11/1/2013 | | PASS |
Josh Wilson
|
|
|
|
Inspection Record Card- Bld | | | 9/25/2013 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/25/2013 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/25/2013 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/25/2013 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/20/2013 | 9/20/2013 | 9/24/2013 | | PASS |
Sam Zahorka
|
|
|
1st review completed.
|
Routing - PLAN CHECK | 9/24/2013 | | 9/24/2013 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2013 | | DONE |
Sam Zahorka
|
|
|
|
Routing - Erosion and Sediment | | | 9/23/2013 | | PASS |
Jason C. Taylor
|
|
|
Plan Mod for Parking Lot: EEJ
|
Routing - PLANNING | 9/20/2013 | | 9/20/2013 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/20/2013 | | 9/20/2013 | | PASS |
Brian Murphy
|
|
|
|
Plan Modification Accepted | | | 9/20/2013 | | DONE |
|
|
|
Plan Mod to add south parking lot
|
Plan resubmittals received | | | 8/12/2013 | | DONE |
Christina Prado
|
|
|
Received five sets of revised plan sheets marked C3.0 as well as one revised drainage calcs packet; taken to Brian Murphy for review and approval
|
FIRE-Conference | 3/12/2012 | 3/12/2012 | 3/12/2012 | A | DONE |
Forrest France
|
|
|
Site work in progress
|
BLD-Framing/Rough-in | 1/25/2012 | 1/26/2012 | 1/26/2012 | P | PASS |
Tom Arcoraci
|
|
|
JEFF Phone #: ###-####
|
BLD-Framing/Rough-in | 1/4/2012 | 1/5/2012 | 1/5/2012 | P | PASS |
Jim Storey
|
|
|
exterior framing//Jeff Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/4/2012 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (SRZ) | 12/29/2011 | 12/29/2011 | 1/3/2012 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 12/29/2011 | | 1/3/2012 | | PASS |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 1/3/2012 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLANNING | 1/3/2012 | | 1/3/2012 | | PASS |
Josh Wilson
|
|
|
New offset at top of wall is OK per setbacks. Previous proposal for 1 ft. offset at top of wall was 24 feet from front property line. New 3 ft. offset remains 21 ft. from property line and meets the 20 ft. front setback of the zone. JGW 1-3-12
|
Routing - PLAN CHECK | 1/3/2012 | | 1/3/2012 | | PASS |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/3/2012 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2012 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 1/3/2012 | | |
|
|
|
|
Permit Ready to Issue | | | 1/3/2012 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 1/3/2012 | | DONE |
Tisha Gallop
|
|
|
called John Day and left vm that plan mod is ready and fees.
|
Plan Modification Accepted | | | 12/29/2011 | | DONE |
Christina Prado
|
|
|
Plan Modification accepted*** Modification to Framing and footings for the exterior of the building. Submitted two sets of Structural cacls for review
|
BLD-Conference | 12/1/2011 | 12/2/2011 | 12/5/2011 | P | NH |
Jim Storey
|
|
|
200 APPT. W/ENGINEER no show by 230
|
BLD-Framing/Rough-in | 11/30/2011 | 12/1/2011 | 12/1/2011 | P | DEFR |
Jim Storey
|
|
|
Jeff Phone #: ###-####
|
Inspection Record Card- Bld | | | 9/15/2011 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 9/15/2011 | | DONE |
Christina Prado
|
|
|
Left message for JOhn permit is ready and fees due as well as GC requirement at 12:35pm
|
Permit Ready to Issue | | | 9/15/2011 | | DONE |
Christina Prado
|
|
|
|
Issue PAID IN FULL permit | | | 9/15/2011 | | DONE |
Christina Prado
|
|
|
|
Routing - PLAN CHECK | | | 9/14/2011 | | PASS |
Sam Zahorka
|
|
|
(1st review completed activity to be added by IBC plan review)
|
Plan assigned to (SRZ) | 8/18/2011 | | 9/14/2011 | | PASS |
Sam Zahorka
|
|
|
|
1st review completed | | | 9/14/2011 | | DONE |
Sam Zahorka
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 9/14/2011 | | DONE |
Sam Zahorka
|
|
|
|
Case Summary (BLD) | | | 9/14/2011 | | DONE |
Sam Zahorka
|
|
|
|
Routing - FIRE | 9/9/2011 | | 9/12/2011 | | PASS |
Scott Arellano
|
|
|
No seperate comments attached. (Seperate Fire Sprinkler permit will be required prior to occupancy.)
|
Routing - PLANNING | 8/26/2011 | | 8/31/2011 | | PASS |
Josh Wilson
|
|
|
OK per DRH11-00083 with redlines sheet A1.00
|
Routing - PUBLIC WORKS | 8/19/2011 | | 8/26/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | | | 8/26/2011 | | PASS |
Steven Webb
|
|
|
ESC11-00599 plan approved with minor modifications to the plan. Conditions will be attached to the permit.
|
Routing - PLUMBING | 8/26/2011 | | 8/26/2011 | | PASS |
Bill VanDegrift
|
|
|
no plumbing
|
Routing PW Drainage | 8/22/2011 | | 8/24/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Design | 8/24/2011 | | 8/24/2011 | | PASS |
Jon R. Gunnerson
|
|
|
No sanitary sewer exists on NW side of parcel. Parcel to drain out to Lois Ave.
|
Routing PW Sewer Rating | 8/22/2011 | | 8/22/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 8/19/2011 | | 8/19/2011 | | PASS |
Terry Records
|
|
|
|
Application received | | 8/18/2011 | 8/18/2011 | | DONE |
Christina Prado
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/18/2011 | | DONE |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/18/2011 | | DONE |
Christina Prado
|
|
|
|
Pending Assignment by JCM | 8/18/2011 | | 8/18/2011 | | DONE |
John Menard
|
|
|
|
Intake Approval | | | 8/18/2011 | | PASS |
Sam Zahorka
|
|
|
|
Routing - PLANNING Land Div | 8/18/2011 | | 8/18/2011 | | PASS |
Dave Abo
|
|
|
Parcel "A" on ROS 8902. Approved by Boise City under
ROS10-00025.
|