Permit Information
Permit NumberBLD11-02075
StatusFinaled
Name HALL INTERIOR SYSTEMS
Site Address 350 N MILWAUKEE ST Unit: 2111
Project NameBTS - #2111 FLIP FLOP SHOPS
Customer Number 
ePlanReviewNo
Description
(FLIP FLOP SHOP - BOISE TOWNE SQUARE - SPACE # 2111) To remodel an existing 673 square feet food vendor tenant space for a new retail tenant. Work to include: installation of interior non-bearing partition walls to isolate space from common area and to enclose a stock room, installation of new flooring throughout, installation of new millwork, construction of a new storefront system (per engineering attached), installation of suspended ceiling system per CISCA 0-2, new lighting, new mechanical ducting, and interior finishes in compliance with ch. 8 of the 2009 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 11/17/201111/21/2011 DONE
First Notice 11/3/201111/7/2011 DONE
Permanent Occupancy  10/24/2011 DONE
BLD-Final10/19/201110/20/201110/20/2011PPASS
DetailsJim Sly
Dustin Phone #: ###-####
OK for Perm Occ. Note No new plumbing was done. Plumbing sign off N/A
DOC - Permit Finaled10/20/201110/20/201110/20/2011PPASS
DetailsJim Sly
FIRE-Final Inspection10/19/201110/20/201110/20/2011APASS
DetailsTroy Cobbley
life safety passed
BLD-Other10/13/201110/13/201110/13/2011PPART
DetailsMike Jordan
DUSTIN Phone #: ###-####. ceiling grid ok, pending fire sprinkler.
BLD-Framing/Rough-in9/29/20119/30/20119/30/2011APASS
DetailsMike Jordan
dustin Phone #: ###-####
BLD-Framing/Rough-in9/28/20119/29/20119/29/2011PPASS
DetailsMike Jordan
dustin Phone #: ###-####
BLD-Framing/Rough-in9/23/20119/23/20119/23/2011PPART
DetailsMike Jordan
Dustin-PLease call at least 15 mins prior to inspection--PLease do inspection as late as possible Phone #: ###-####
Routing - PLAN CHECK9/23/2011 9/23/2011 PASS
DetailsTim L. Woodard
Case Summary (BLD)  9/23/2011 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  9/23/2011 DONE
DetailsTim L. Woodard
Print Occupancy Form  9/23/2011 DONE
Telephone call  9/23/2011 DONE
DetailsChristina Prado
left message for Dustin @ 10:20 giving fees due and advising permit is ready ###-####
Permit Ready to Issue  9/23/2011 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  9/23/2011 DONE
DetailsBarbara Stitt
Plan assigned to (TLW)8/30/2011 9/23/2011 PASS
DetailsTim L. Woodard
Plan resubmittals received  9/21/2011 DONE
DetailsTisha Gallop
received two copies of structural calcs and plan sheets G1.0, D1.0 A1.0 A2.0 A5.0, S1.0; taken to Tim Woodard.
1st review completed  9/13/2011 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK9/2/2011 9/13/2011 PEND
DetailsTim L. Woodard
Spoke with Contractor and he indicated to me that the drawings needed to be revised from what I had. We agreed to do a demo permit Thursday when they brought in the new plans. TLW
Routing - PUBLIC WORKS8/31/2011 9/2/2011 PASS
DetailsBeverly Mountain
Routing - Addressing8/31/2011 8/31/2011 PASS
DetailsTerry Records
Routing PW Sewer Rating8/31/2011 8/31/2011 PASS
DetailsConnie Baumgartner
Application received 8/30/20118/30/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  8/30/2011 DONE
DetailsTisha Gallop
Override - Parcel Holds  8/30/2011  
Recd Pcfee & Taken To Pln CK  8/30/2011 DONE
DetailsTisha Gallop