Print Statement | | | 1/28/2013 | | DONE |
Tisha Gallop
|
|
|
mailed to Alta Construction
|
Third Notice | | 1/8/2013 | 1/10/2013 | | DONE |
|
|
|
|
Third Notice | | 12/9/2012 | 1/3/2013 | | DONE |
|
|
|
faxed to Alta Construction
|
Third Notice | | 11/19/2012 | 12/4/2012 | | DONE |
|
|
|
faxed to Alta Const.
|
Second Notice | | 10/28/2012 | 11/14/2012 | | DONE |
|
|
|
|
First Notice | | 10/5/2012 | 10/18/2012 | | DONE |
|
|
|
faxed
|
BLD-Final | 9/25/2012 | 9/25/2012 | 9/25/2012 | P | DONE |
Tom Arcoraci
|
|
|
Mitch Phone #: ###-####
|
Extend Permit 90/180 days | 9/25/2012 | 9/25/2012 | 9/25/2012 | A | PASS |
Tom Arcoraci
|
|
|
Mitch Phone #: ###-####
|
PubWorks Occupancy Approval | 9/25/2012 | 9/25/2012 | 9/25/2012 | | DONE |
Tiffany Lowery
|
|
|
|
Permanent Occupancy | | | 9/25/2012 | | DONE |
Barbara Stitt
|
|
|
|
Zoning Approval | 9/24/2012 | 9/24/2012 | 9/24/2012 | | PASS |
Josh Wilson
|
|
|
|
BLD-Final | 9/20/2012 | 9/21/2012 | 9/21/2012 | A | NR |
Tom Arcoraci
|
|
|
mitch please call 30 min before going out Phone #: ###-#### needs p/w and zoning
|
FIRE-Final Inspection | 9/20/2012 | 9/20/2012 | 9/20/2012 | P | PASS |
Forrest France
|
|
|
Inspection passed. Fire life safety finaled.
|
Issue PAID IN FULL permit | | | 2/13/2012 | | DONE |
Christina Prado
|
|
|
|
Expiration Notice | 2/9/2012 | 3/2/2012 | 2/9/2012 | | DONE |
Patricia Smith
|
|
|
|
Plan resubmittals received | | | 1/20/2012 | | DONE |
Tisha Gallop
|
|
|
received three copies of calcs and plan sheets S0.1, S1.1, S1.2; taken to John Menard.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2012 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 1/20/2012 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/20/2012 | | DONE |
|
|
|
|
Telephone call | | | 1/20/2012 | | DONE |
|
|
|
1-20-12 called Chad permit ready and fee given Also need GC & RP ///dld
|
Plan assigned to (JCM) | 9/6/2011 | | 1/20/2012 | | PASS |
John Menard
|
|
|
|
Routing - PLAN CHECK | 12/13/2011 | | 1/20/2012 | | PASS |
John Menard
|
|
|
|
Plan resubmittals requested | | | 1/19/2012 | | DONE |
John Menard
|
|
|
E-mailed the architect requesting copies of final revised structural calculations and drawings. JCM
|
Routing Off Site - STRUCTURAL | 1/11/2012 | | 1/19/2012 | | PASS |
John Menard
|
|
|
Received letter from consulting structural engineer approving final revisions. Waiting for revised plans to be able to issue permit. JCM
|
Telephone call | | | 1/11/2012 | | DONE |
Tisha Gallop
|
|
|
called action couriers for pick up
|
Plan resubmittals received | | | 1/11/2012 | | DONE |
Tisha Gallop
|
|
|
received response and three copies of structural calcs and plan sheets S1.1, S1.2; taken to John Menard.
|
Routing Off Site - STRUCTURAL | 12/29/2011 | | 1/6/2012 | | FAIL |
Barbara Stitt
|
|
|
Called Action Courier for pick up @ 8:00am - Received comment list from consulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals requested | | | 1/6/2012 | | DONE |
John Menard
|
|
|
E-mailed architect a copy of 3rd structural comment list. Consulting engineer to meet with project engineer today to help resolve remaining items. JCM
|
Plan resubmittals received | | | 1/6/2012 | | DONE |
Tisha Gallop
|
|
|
Received revised cover sheet and cert of value; taken to John Menard. At this time also removed grading and electrical sheets from Issue set of plans and split out grading/drainage permit Bld12-00046.
|
Plan resubmittals received | | | 12/28/2011 | | |
|
|
|
Received 1 cover transmittal, 1 copy of plan review response letter dated 12-28-11 from Chad Harbig, 3 copies of Structural Design Calculations, 3 copies of sheets S1.1, S1.2 inserted into plans and taken back to John Menard's desk
|
Routing Off Site - STRUCTURAL | 12/14/2011 | | 12/21/2011 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting additional revisions. JCM
|
Plan resubmittals requested | | | 12/21/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural comments requesting additional revisions. JCM
|
Plan resubmittals received | | | 12/14/2011 | | DONE |
Christina Prado
|
|
|
Received three sets of Structural calcs; Response letter and plans marked S0.1, S1.1 & S1.2. PLans inserted by rep from CSHQA and given to John Menard for additional review
|
Telephone call | | | 12/14/2011 | | DONE |
Christina Prado
|
|
|
called action couriers for pick up
|
Routing - Erosion and Sediment | 12/12/2011 | | 12/13/2011 | | PASS |
Clint A Smith
|
|
|
ESC11-00636 plan approved with conditions attached to the permit.
|
Routing - PLAN CHECK | 10/24/2011 | | 12/12/2011 | | |
John Menard
|
|
|
|
Plan resubmittals received | | | 12/12/2011 | | DONE |
Tisha Gallop
|
|
|
received two copies of ESC plan (11 x 17) and narrative; put with the rest of the plans with John Menard and routed to Erosion.
|
Routing - PLAN CHECK | 10/10/2011 | | 10/24/2011 | | PEND |
Jason Blais
|
|
|
Routed to Fire.
|
Routing - FIRE | 10/24/2011 | | 10/24/2011 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans.
|
Meeting | | | 10/14/2011 | | DONE |
|
|
|
Onsite evaluation performent by the Boise Fire Marshal, Romeo Gervais. The fire marshal has approved the two existing above ground hydrants and accepted the use of one subterranean fire hydrant as the required 3rd hydrant.
|
Routing - FIRE | 9/30/2011 | | 10/3/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
Pending Fire Marshal evaluation of (1) subterranean fire hydrant at the proposed building site, and a (2nd) remote fire hydrant located across a multi-lane roadway serving the passenger drop off terminal, and approximately 140 feet from the nearest dedicated FD access roadway serving the new proposed structures.
*Updated 10-10-11* One new fire hydrant is required, See attached Fire Code review comments.
|
Plan resubmittals received | | | 9/30/2011 | | DONE |
Christina Prado
|
|
|
Received two sets of plans A2.1; two sopies of United Water letter; two copies of photos and response letter. Plans inserted by rep and routed to John Menard for review
|
Routing - PLAN CHECK | 9/19/2011 | | 9/30/2011 | | |
John Menard
|
|
|
|
Plan resubmittals requested | | | 9/21/2011 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 9/6/2011 | | 9/21/2011 | | FAIL |
John Menard
|
|
|
called Action Couriers for pick up - Received comment list from consulting structural engineer requesting revisions. JCM
|
Route to Impact Fee Review | 9/14/2011 | 9/19/2011 | 9/19/2011 | | PASS |
Cindy M. Gould
|
|
|
Protective shell only no impact fees
|
Routing - FIRE | 9/14/2011 | 9/14/2011 | 9/19/2011 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 9/19/2011 | | FAIL |
|
|
|
Failed Erosion & Soil Control, Fire
|
Routing - PLUMBING | 9/19/2011 | | 9/19/2011 | | PASS |
Daryl Spivey
|
|
|
Provide an overflow at downspout to provide secondary drain in case of failure of main drain.
|
Routing - PLAN CHECK | 9/13/2011 | | 9/14/2011 | | PASS |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 9/12/2011 | | 9/13/2011 | | FAIL |
Clint A Smith
|
|
|
ESC11-00636 plan failed due not providing a plan narrative with the ESC plan map. Left a message with the applicant.
|
Routing - PLANNING | 9/13/2011 | | 9/13/2011 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 9/6/2011 | | 9/12/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 9/7/2011 | | 9/9/2011 | | PASS |
Brian Murphy
|
|
|
|
Routing - Addressing | 9/7/2011 | | 9/7/2011 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 9/7/2011 | | 9/7/2011 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 9/2/2011 | | 9/6/2011 | | PASS |
Todd Tucker
|
|
|
|
Pending Assignment by JCM | 9/2/2011 | | 9/6/2011 | | DONE |
John Menard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/2/2011 | | |
Christina Prado
|
|
|
|
Intake Approval | | | 9/2/2011 | | PASS |
Carl Westfall
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/2/2011 | | |
Christina Prado
|
|
|
|
Application received | | 9/2/2011 | | | |
|
|
|
|
Routing - PLAN CHECK | 10/24/2011 | | | | |
|
|
|
|