Permit Information
Permit NumberBLD11-02133
StatusFinaled
Name DYNAMIC CONSTRUCTION & REMODEL
Site Address 1841 N BRYSON RD
Project Name 
Customer Number 
ePlanReviewNo
Description
****12-27-2011THIS PERMIT IS MODIFIED TO REFLECT THE APPROVAL OF THE FLOOR PLANS AND PLAN REVIEW NOTES AND ALLOW FOR TRADE INSPECTIONS TO COMMENCE. ADDED VALUE TO THE PROJECT IS $3,000.00. 12-27-2011 pep***** This project is for the 1st phase of a remodel addition project that will allow for the placement of a new roof structure. The owner will be in in the next month to complete the plans and proper documents for the entire project. This permit will allow for the removal of existing drywall etc to allow for select electrical and other trade work to get rolling. Separate electrical, plumbing and mechanical permits are required. R-1C ok per Colleen Carroll. All per the approved roof plan as marked. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/31/20125/31/20125/31/2012PPASS
DetailsJim Sly
Kelly - call 30 mins prior to going for access Phone #: ###-####
DOC - Permit Finaled5/31/20125/31/20125/31/2012PPASS
DetailsJim Sly
Case Summary (BLD)  5/29/2012 DONE
DetailsSam Zahorka
BLD-Final5/24/20125/25/20125/25/2012PNR
DetailsJim Sly
Kelly Phone #: ###-####
No access......
BLD-Energy code compliance1/12/20121/12/20121/13/2012PPASS
DetailsJim Sly
kelly Phone #: ###-####
BLD-Framing/Rough-in1/10/20121/11/20121/11/2012PPASS
DetailsJim Sly
Kelly Phone #: ###-####
Routing - MECHANICAL1/5/2012 1/5/2012 PASS
DetailsTroy James
resubmitted manual j
Routing - MECHANICAL12/30/2011 12/30/2011 PASS
DetailsTroy James
emailed manual j report to Kelly Ursillo
Routing Walk-In (BLD)12/27/201112/27/201112/27/2011PDONE
DetailsPerry Paine
Case Summary (BLD)  12/27/2011  
Inspection Record Card- Bld  12/27/2011  
PLANS/APPL TAKEN TO FRONT DESK  12/27/2011  
CHANGE STATUS TO (ISS)  12/27/2011 DONE
DetailsChristina Prado
Routing Walk-In (BLD)9/8/20119/8/20119/8/2011APASS
DetailsPerry Paine
Plan assigned to (PEP)9/6/20119/6/20119/8/2011 PASS
DetailsPerry Paine
Routing Walk-In (BLD)9/2/20119/2/20119/8/2011PDONE
DetailsPerry Paine
Case Summary (BLD)  9/8/2011  
Inspection Record Card- Bld  9/8/2011  
1st review completed  9/8/2011 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/8/2011 DONE
Permit Ready to Issue  9/8/2011  
Issue PAID IN FULL permit  9/8/2011 DONE
Routing Walk-In (Zoning)9/2/20119/2/20119/2/2011PPASS
DetailsColleen T Carroll
Application received 9/2/2011