Permit Information
Permit NumberBLD11-02178
StatusFinaled
Name PERFORMANCE SYSTEMS INC
Site Address 11818 W JOPLIN RD
Project NamePW UV DISINFECTION FACILITY
Customer Number 
ePlanReviewYes
Description
(CITY OF BOISE PUBLIC WORKS) UV Disinfection Facility Addition (Foundation Only) To construct the concrete foundation and lower mechanical and plumbing for a 1,860 sq. ft. pre-engineered metal building addition to an existing 6,900 sq. ft. UV disinfection facility building per approved plans. New building total square footage will be 8,760 sq. ft. Work under this permit shall not proceed beyond the pour of the foundation until final approval of plans and issuance of the full building permit. That permit has not yet been applied for. As owner or designated agent, I acknowledge that I am performing this work at my own risk without assurance that the permit for the entire building structure will be granted, and I agree to make any modifications to the early foundation work performed as may be required to comply with the City Codes and the final approved building plans and conditions. All per engineered plans on file. NOTE: This building is NOT fire sprinklered.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice10/27/201510/27/201511/9/2015 DONE
DetailsJim Sly
Mailed 11-10-15
BLD-Aging Inspection10/27/201510/27/201510/27/2015 PASS
DetailsJim Sly
DOC - Permit Finaled10/27/201510/27/201510/27/2015PPASS
DetailsJim Sly
PubWorks Occupancy Approval2/21/20142/21/20142/21/2014 DONE
DetailsTiffany Lowery
BLD-Final2/20/20142/20/20142/20/2014PPASS
DetailsJim Sly
BLD-Final8/2/20138/5/20138/5/2013ANR
DetailsJim Sly
Need to complete all concrete on scope of work, provide final letter of approval from MTI and Engineer of record.
BLD-Final8/1/20138/2/20138/2/2013ADEFR
DetailsMike Jordan
david Phone #: ###-####
BLD-Final6/24/20136/25/20136/25/2013PCANC
DetailsJim Sly
dave Phone #: ###-####
BLD-Final6/21/20136/24/20136/24/2013ANR
DetailsJim Sly
Phone #: ###-####
Need approved plan.
FIRE-Final Inspection6/21/20136/21/20136/21/2013PPASS
DetailsForrest France
Life safety finaled.
BLD-Footing9/25/20129/25/20129/25/2012PPART
DetailsJim Sly
Dave phone
Select slab and column inbed anchor bolting.....OK pending MTI insp. tests and approvals.
BLD-Footing9/24/20129/25/20129/25/2012ACANC
DetailsJim Sly
anchor bolt insp//Dave Miller Phone #: ###-####
Re-sched.....
BLD-Concrete7/18/20127/24/20127/24/2012APART
DetailsJim Sly
Around 9am please-Dave Miller Phone #: ###-####
Select slab OK pending MTI special insp, tests and approvals.
Inspection Record Card- Bld  3/5/2012 DONE
DetailsChristina Prado
Permit Ready to Issue  3/5/2012 DONE
DetailsChristina Prado
Issue PAID IN FULL permit  3/5/2012 DONE
DetailsChristina Prado
Routing - PLAN CHECK2/22/2012 2/28/2012 PASS
DetailsJohn Menard
Plan resubmittals received  2/28/2012 DONE
DetailsJason Blais
Received additional structural calcs and sheet S19 UV Building Details.
Routing Off Site - STRUCTURAL2/28/2012 2/28/2012 PASS
DetailsJason Blais
PLANS/APPL TAKEN TO FRONT DESK  2/28/2012 DONE
DetailsJason Blais
Telephone call  2/28/2012 DONE
DetailsRita DeYoung
Emailed customer that plans have been batched stamped.
Plan assigned to (JCM)11/30/2011 2/28/2012 PASS
DetailsJohn Menard
ePlanReview
Routing Off Site - STRUCTURAL2/22/2012 2/27/2012 FAIL
DetailsJason Blais
Routing - Erosion and Sediment2/22/2012 2/23/2012 PASS
DetailsClint A Smith
ESC12-00147 plan approved with conditions attached to the permit.
Routing Off Site - STRUCTURAL2/8/2012 2/16/2012 FAIL
DetailsJohn Menard
Routing - PLAN CHECK2/8/2012 2/9/2012 PASS
DetailsJohn Menard
Routing - Erosion and Sediment2/8/2012 2/8/2012 FAIL
DetailsClint A Smith
Plan resubmittals requested  1/12/2012 DONE
DetailsJohn Menard
Sent correction comments via ProjectDox. JCM
1st review completed  1/12/2012  
DetailsJohn Menard
Routing - PLAN CHECK11/30/2011 1/12/2012 FAIL
DetailsJohn Menard
Routing PW Drainage11/30/2011 1/4/2012 PASS
DetailsBrian Murphy
Routing - Addressing11/30/2011 12/28/2011 PASS
DetailsApril Wing
Routing - PLANNING11/30/2011 12/27/2011 PASS
DetailsDavid Moser
David Moser - CUP11-00028
Routing - PLUMBING11/30/2011 12/9/2011 PASS
DetailsBill VanDegrift
Per plans and 2003 UPC
Routing - Erosion and Sediment11/30/2011 12/6/2011 FAIL
DetailsClint A Smith
Plan review failed due to not submitting an ESC permit application and providing an ESC plan narrative. E-mail all the requirements to complete the ESC plan review to Shawn Wilson.
Routing - FIRE11/30/2011 12/5/2011 PASS
DetailsScott Arellano
Uploaded IFC comments to project documents.
Routing Off Site - STRUCTURAL11/30/2011 12/2/2011 FAIL
DetailsJohn Menard
Route to Impact Fee Review11/30/201112/5/201112/1/2011 PASS
DetailsCindy M. Gould
Routing - PLANNING Land Div11/30/2011 12/1/2011 PASS
DetailsDave Abo
Parcel over 5 acres in size.
Routing - PUBLIC WORKS11/30/2011 11/30/2011 PASS
DetailsBeverly Mountain
Intake Approval  11/30/2011 PASS
Intake Approval  9/19/2011 FAIL
Application received 9/9/2011