First Notice | 6/3/2015 | 6/3/2015 | 6/9/2015 | | |
Dave Hannah
|
|
|
Mailed out 6-10-15
|
BLD-Aging Inspection | 6/3/2015 | 6/3/2015 | 6/3/2015 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 10/13/2011 | 10/13/2011 | 10/14/2011 | P | PASS |
Dave Hannah
|
|
|
Gil Phone #: ###-#### walked project with Gil oked thim to pour a none struc. floor slab
|
Issue PAID IN FULL permit | | | 10/12/2011 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/30/2011 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2011 | | DONE |
|
|
|
|
Telephone call | | | 9/21/2011 | | DONE |
Christina Prado
|
|
|
Gave Will fees due and GC requirement
|
Permit Ready to Issue | | | 9/21/2011 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (CJW) | 9/12/2011 | 9/12/2011 | 9/20/2011 | | PASS |
Carl Westfall
|
|
|
INTERMOUNTAIN MEDICAL IMAGING - ENLARGED OPENING IN EAST EXTERIOR WALL - (20 days - Oct 7)
|
Routing - PLAN CHECK | 9/13/2011 | | 9/20/2011 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2011 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2011 | | DONE |
|
|
|
Called Brian Smith. Discussed his shear wall analysis. Asked him to revise and resubmit.
|
1st review completed | | | 9/13/2011 | | DONE |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 9/12/2011 | | 9/13/2011 | | FAIL |
Carl Westfall
|
|
|
The plan review was started on September 13 and finished the same day. Additonal structural calculations and perhaps drawings were required. See the plan review report.
|
Routing - PLANNING | 9/13/2011 | | 9/13/2011 | | PASS |
Josh Wilson
|
|
|
|
Application received | | 9/12/2011 | 9/12/2011 | | DONE |
Barbara Stitt
|
|
|
|